Opportunistic Hybrid Communications Systems for Distributed PV Coordination
This presentation provides a high-level overview of the opportunistic hybrid communications systems for distributed photovoltaic coordination.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This presentation provides a high-level overview of the opportunistic hybrid communications systems for distributed photovoltaic coordination.
This presentation gives overview of black start related research at NREL.
San Diego Gas & Electric's Borrego Springs Microgrid is one of the largest microgrids in the USA, serving 2500 residential customers, 300 commercial and industrial customers, and has a peak demand of approximately 14 MW. This microgrid is located at the end of a long transmission line, and is subjected to extreme weather events like storms, wildfires, and flooding, which frequently cause grid outages. The microgrid currently relies on 3.65 MW of diesel-powered generators to provide grid-forming services during these outages, which results in greenhouse gas and criteria pollutant emissions. However, the microgrid has access to approximately 37 MW of installed solar generation and struggles with overgeneration and curtailment. 1.5 MW/4.5 MWh of grid-scale batteries have been installed to capture some the overgeneration and provide resiliency, but a longer-duration low-greenhouse gas emission energy storage solution is needed. In our project, the team will evaluate in the lab and demonstrate in the field a grid-forming fuel cell inverter that can provide grid-forming services while utilizing hydrogen's energy storage scalability. We will first utilize NREL's Renewable Energy Integration and Optimization (REopt) platform to perform analyses on future microgrid scenarios that use hydrogen assets to reduce or eliminate the need for diesel backup generators. We will then evaluate the grid-forming inverter through power hardware-in-the-loop and controller hardware-in-the-loop experiments at ARIES, and de-risk the field deployment and operation of hydrogen assets in the microgrid setting. Finally, this project will demonstrate the operation of the fuel cell inverter and updated microgrid controller by operating in grid-forming mode in the Borrego Springs microgrid.
Explore the source record for details and available documents.
Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.
This paper introduces an integrated voltage regulation approach to coordinate the Volt-VAr control between transmission and distribution systems. Distributed photovoltaic (PV) systems are aggregated as a virtual power plant (VPP). At the sub-transmission level, a Coordinated Real-time Sub-Transmission Volt-VAr Control Tool (CReST-VCT) is introduced to coordinate the operation of the shunt devices and the reactive power provided by the VPPs. The CReST-VCT uses an enhanced Volt-VAr control algorithm with weighted voltage control objects that include minimizing losses, maintaining the voltage within desirable levels, and minimizing the number of mechanical switching of shunt elements. The algorithm runs every 5 minutes and is solved using AC optimal power flow (OPF) solution technique. The outputs include the settings for each sub-transmission-level Volt-VAr control devices and the reactive power generation requirements for each VPP. Then, each VPP will run a distribution Volt-VAr control algorithm to select the PV inverters that provide the Volt-VAr control services considering the distribution network topology. The goal of the VPP reactive power control is to meet the transmission level service requirements while maintaining the voltage and line flow in the distribution system within limits. Each VPP will update its voltage regulation capacity every 5 minutes to allow the CReST-VCT to formulate the optimization problem for the next dispatch interval. The proposed tool is simulated on Duke Energy Carolina system to demonstrate the capability of providing voltage support service by dispatching of reactive power of distributed PV as VPP.
The addition of large amounts of wind and solar generation to bulk power systems that are traditionally subject to operating constraints set by transient stability and frequency response limitations is the subject of considerable concern in the industry in all North American grids. The U.S. Western Interconnection is expected to experience substantial additional growth in both wind and solar generation. This generation will, to some extent, displace large central station thermal generation, both coal and gas-fired, which have traditionally helped maintain stability. A substantial fraction of the new photovoltaic (PV) solar generation will be deeply embedded in the distribution system and will be electrically in close proximity to customer loads. Several aspects of this renewable generation on transient stability and frequency response have been investigated and reported elsewhere in summaries of a study that included an investigation of the dynamic performance of the Western Interconnection with high penetrations of wind and solar generation. In this paper, modeling and the impact of distributed PV generation and dynamic loads are reported. The key finding is that the transient performance, particularly the fault ride-through behavior of embedded PV, is critical to system stability. Poor ride-through characteristics on distributed generation are shown in the study to collapse the entire grid. The dynamic behavior of the loads, aside from the embedded PV is also shown to be a critical element. The investigation reinforces the need for valid models and for thorough system planning studies.
Here, the rapid evolution of modern electric power distribution systems into complex networks of interconnected active devices, distributed generation (DG), and storage poses increasing difficulties for system operators. The large-scale integration of distributed energy resources (DERs) and the rapid exchange of measurement data via communication networks present major opportunities for advancing grid operations but also introduce greater uncertainty, higher data dimensionality, more complex network and device models, and challenging control and optimization problems. Deep reinforcement learning (DRL) algorithms are promising in addressing these challenges. However, they have not been effectively adapted for power systems applications, requiring extensive customization for implementation and evaluation. This has resulted in reproducibility challenges and a steep learning curve for researchers new to applying DRL algorithms to the power systems domain. To bridge these gaps, this tutorial aims to serve as a valuable resource for researchers interested in exploring learning-based algorithms to operate active power distribution networks. Specifically, this work presents a generalized process for translating sequential decision-making problems in power distribution systems into Markov decision process (MDP) formulations, illustrated through concrete grid service examples. Additionally, we introduce a simple environment design strategy to develop and evaluate example DRL algorithms for distribution system applications, complete with an included code repository to guide users through environment construction.
Dynamic behaviors of distribution networks are of great importance for the power system analysis. Nowadays, due to the integration of the renewable energy generation, energy storage, plug-in electric vehicles, and distribution networks turn from passive systems to active ones. Hence, the dynamic behaviors of active distribution networks (ADNs) are much more complex than the traditional ones. The research interests how to establish an accurate model of ADNs in modern power systems are drawing a great deal of attention. In this paper, motivated by the similarities between power system differential algebraic equations and the forward calculation flows of recurrent neural networks (RNNs), a long short-term memory (LSTM) RNN-based equivalent model is proposed to accurately represent the ADNs. First, the adoption reasons of the proposed LSTM RNN-based equivalent model are explained, and its advantages are analyzed from the mathematical point of view. Then, the accuracy and generalization performance of the proposed model is evaluated using the IEEE 39-Bus New England system integrated with ADNs in the study cases. Here, it reveals that the proposed LSTM RNN-based equivalent model has a generalization capability to capture the dynamic behaviors of ADNs with high accuracy.
Managing the stability of today's electric power systems is based on decades of experience with the physical properties and control responses of large synchronous generators. Today's electric power systems are rapidly transitioning toward having an increasing proportion of generation from nontraditional sources, such as wind and solar (among others), as well as energy storage devices, such as batteries. In addition to the variable nature of many renewable generation sources (because of the weather-driven nature of their fuel supply), these newer sources vary in size - from residential-scale rooftop systems to utility-scale power plants - and they are interconnected throughout the electric grid, both from within the distribution system and directly to the high-voltage transmission system. Most important for our purposes, many of these new resources are connected to the power system through power electronic inverters. Collectively, we refer to these sources as inverter-based resources.
Increasing adoption of Solar Photovoltaic (PV) generation at the distribution level poses several changes for the reliable operation of electrical power distribution systems. The addition of a significant amount of PV to a distribution network can introduce a variety of operational problems, including steady-state overvoltages, reverse flows, voltage flicker and excessive controller movement among others. These adverse impacts can be mitigated through a variety of equipment upgrades which represent a cost to either the electric utility or the owner of the PV site. The study performed here aims to quantify the levels of PV generation which present operational problems on a distribution circuit and how those problems might be alleviated. The study performed here included 20 distribution feeders selected from Pepco Holdings, Inc. (PHI) service territory. These feeders are located in the states of Delaware, Maryland and New Jersey. A hosting capacity study was performed on each feeder to determine how much additional PV it could support in its current configuration. Several improvements were then performed on these circuits including phase balancing, capacitor redesign, reducing the voltage regulator set points, fixed power factor operation on the PV inverters and the installation of battery storage. After each of these improvements the hosting capacity of the circuit was reevaluated in order to determine how that particular improvement impacted the amount of PV that could be hosted by the circuit. Each of these improvements represents a real cost in terms of labor and equipment in order to be implemented. They are expected to provide a benefit in terms of the amount of additional PV generation which can be safely interconnected to the distribution feeder. A cost benefit analysis was performed in order to evaluate the expected costs of each feeder improvement and how each one was able to increase the PV hosting capacity of each feeder. It is hoped that these results can be utilized by other distribution utilities in order to understand how they can improve the hosting capacity of their feeders and facilitate the deployment of more PV generation at the distribution level. Admittedly other utility companies will most likely have different feeder architectures and differing labor and equipment costs so the realized cost benefit numbers may be significantly different.
As power systems cope with increasing amounts of renewable generation, there is an increasing need to engage flexible demand-side resources and distributed energy resources (DERs) into power systems operations. However engagine millions of DERs in a reliable manner into power systems operations can be a challenging problem. Retail markets can facilitate this by providing a platform to aggregate the flexibility of DERs and bid the aggregate flexibility into wholesale markets. However, unlike generators (which can typically be modeled accurately with capacity constraints and ramping limits), most flexible loads have physical dynamics (like air conditioners) that couples their flexibility over time. This coupling could have unintended undesirable consequences (for example, instability and oscillations in prices and other physical quantities). In this paper, we propose a simple model to capture evolution of load flexibility over time and analyze stability of the interconnection between wholesale and retail electricity markets. We prove that under a natural model of flexibility evolution (assuming a constant base load), oscillations cannot occur and prices converge to a unique equilibrium model quickly.
This report is part one of a two-part series that represents a year-long collaboration with the Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) and Tamil Nadu Transmission Corporation Limited (TANTRANSCO) on power sector planning. This Pathways for Tamil Nadu’s Electric Power Sector 2020-2030 report outlines NREL’s work with TANGEDCO's electricity sector planning department to develop a model of the State power system and evaluate multiple scenarios of system evolution given resource constraints, costs of technologies, and power sector policies. A broad stakeholder group comprised of TANGEDCO leadership, developers, regulators, and researchers from within the power sector community in Tamil Nadu helped to guide the main objectives of the study and provided technical feedback to the research team. The outcomes of this effort include multiple pathways for power sector growth to 2030 and a robust model of Tamil Nadu's power system that can be used to continually analyze the impact of new policies, regulations, or system changes. The second report in this series will build on the bulk system analysis by focusing on the rapidly transforming distribution network in the State. The report will outline a framework developed by NREL and TANGEDCO's distribution utility to quickly and accurately analyze the impacts of integrating renewable energy onto Tamil Nadu's distribution system. Together these studies help to prepare Tamil Nadu for a rapidly transforming power system.
This paper considers distribution systems with a high penetration of distributed, renewable generation and addresses the problem of incorporating the associated uncertainty into the optimal operation of these networks. Joint chance constraints, which satisfy multiple constraints simultaneously with a prescribed probability, are one way to incorporate uncertainty across sets of constraints, leading to a chance-constrained optimal power flow problem. Departing from the computationally-heavy scenario-based approaches or approximations that transform the joint constraint into conservative deterministic constraints, this paper develops a scalable, data-driven approach which learns operational trends in a power network, eliminates zero-probability events (e.g., inactive constraints), and accurately and efficiently approximates bounds on the joint chance constraint iteratively. In particular, the proposed framework improves upon the classic methods based on the union bound (or Boole's inequality) by generating a much less conservative set of single chance constraints that also guarantees the satisfaction of the original joint constraint. The proposed framework is evaluated numerically using the IEEE 37-node test feeder, focusing on the problem of voltage regulation in distribution grids.
Time-series simulation is a technique used to estimate the energy delivery of a power generation system with output that changes under changing conditions. Such variable resources include photovoltaic energy systems that experience different levels of sunlight or wind farms with changing wind patterns. As distributed generation from these variable resources continues to flourish, having improved software tools to accurately measure, model, and estimate phenomena of interest to grid integration, in addition to energy output, will be crucial for safeguarding smooth integration and operation of these energy systems. Currently, time-series simulations assume conditions and power output are constant over the duration of a time-step (steady-state assumption). NREL researchers improve the accuracy with a new simulation software called SIDSIM (Sub-Interval Distribution Simulation) that replaces this steady value (solar or wind resource) with a distribution function that has a maximum value, a minimum value, and a shape to the curve within each time-step. The distribution function used for modeling varying values in the SIDSIM software is a novel equation and presents advantageous new benefits over the conventional methods. The first advantage comes in the ability to determine maximum instantaneous power within a time-step. This enables better protection of a system from overcurrent issues and it also allows for better forecasting and reservation of transmission capacity; such capabilities are essential for energy system integration. Second, a distribution function helps to determine the amount of energy loss due to “clipping” in cases where the photovoltaic direct current (DC) system capacity exceeds the inverter capacity, the AC interconnect capacity, or any other limiting component or threshold value. It improves estimates of battery throughput by allowing both charge and discharge of a battery within the duration of a time-step. Third, it provides a more refined estimate of utility-bill impacts by considering the delivered power may be higher than the site load or lower than the regular average power estimates that are made using a quasi-steady-state assumption. SEE ALSO OSTI ID 1,361,018
Wind power ramps (WPRs) are particularly important in the management and dispatch of wind power and currently drawing the attention of balancing authorities. With the aim to reduce the impact of WPRs for power system operations, this paper develops a probabilistic ramp forecasting method based on a large number of simulated scenarios. An ensemble machine learning technique is first adopted to forecast the basic wind power forecasting scenario and calculate the historical forecasting errors. A continuous Gaussian mixture model (GMM) is used to fit the probability distribution function (PDF) of forecasting errors. The cumulative distribution function (CDF) is analytically deduced. The inverse transform method based on Monte Carlo sampling and the CDF is used to generate a massive number of forecasting error scenarios. An optimized swinging door algorithm is adopted to extract all the WPRs from the complete set of wind power forecasting scenarios. The probabilistic forecasting results of ramp duration and start-time are generated based on all scenarios. Numerical simulations on publicly available wind power data show that within a predefined tolerance level, the developed probabilistic wind power ramp forecasting method is able to predict WPRs with a high level of sharpness and accuracy.
Emergency diesel generators are the most common form of backup power for critical loads when the grid fails and are most often deployed as stand-alone generators (<2000 kW) tied to individual buildings for hospitals, emergency services, military bases, ports, airports, industries, and commercial facilities. Understanding the finite reliability of emergency diesel generators during continuous operation is critical for energy planners, managers, and end-users. A new analysis of two large non-public emergency diesel generator operational data sets shows that commonly used reliability metrics are inadequate to predict the performance during a grid outage. Additional metrics addressing the likelihood of an emergency diesel generator to be available at the time an outage starts, successfully start and carry load, and constantly run for the duration of the outage are needed to predict the continuous run-time reliability of emergency diesel generators during a grid outage. This is the first analysis of the reliability of modern generators that follow standard maintenance protocols commonly used for backup power and these new metrics are shown to be dependent on the level of emergency diesel generator maintenance with values that can vary by more than an order of magnitude. Even using the new metrics for well-maintained emergency diesel generators, the analysis shows that the single emergency diesel generators configurations are only 80% likely to provide power for the duration of a two-week grid outage.
In recent years, the low-to-medium voltage distribution networks are experiencing rising levels of distributed energy resources, including renewable generation, along with improved sensing, communication and automation infrastructure. As such, state estimation methods for distribution systems are becoming increasingly relevant as a means to enable better control strategies that can both leverage the benefits and mitigate the risks associated with high penetration of variable and uncertain distributed generation resources. Primary challenges of this problem include modeling complexities (nonlinear non-convex power-flow equations), limited availability of sensor measurements, and high penetration of uncertain renewable generation. This paper formulates the distribution system state estimation as a nonlinear weighted least squares problem, based on sensor measurements as well as forecasts data (both load and generation). We investigate the sensitivity of state estimator accuracy to (load/generation) forecast uncertainties, sensor accuracy, and sensor coverage levels.