Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Status of the Delco Systems Operations forward looking windshear detection program

Delco Systems Operations, a division of General Motors Hughes Electronics Corporation, is developing a Forward Looking Windshear Detection System based on the integration of infrared remote sensing and accelerometer reactive sensing technologies. The infrared sensor is a multi-spectral, scanning radiometer operating in the 8 to 14 micron region. A 2 x 5 detector array with parallel-serial scanning produces 60 degrees horizontal and 10 degrees vertical-fields of view. Using multiple wavelength signals, azimuth temperature gradients are analyzed for characteristic signatures of thermally induced windshear phenomena. Elevation temperature gradients are processed through an atmosphere model to continuously compute a stability index for arming microburst detection criteria. The atmosphere model and proprietary computer processing algorithms combine to generate coarse estimates of disturbance ranges based on multiple wavelength radiance data with different extinction coefficients. Computer outputs of atmospheric stability, disturbance intensity, and azimuth and range information provide a situation display capability. A ground operated, experimental radiometer has been developed and is being used to verify the detection and discrimination concepts at an atmospheric and simulated rain test facility in Milwaukee. A prototype airborne radiometer is being developed for flight test evaluation during the summer of 1989.

Gallagher, Brian J.↗

SWIFT BAT Loop Heat Pipe Thermal System Characteristics and Ground/Flight Operation Procedure

The SWIFT Burst Alert Telescope (BAT) Detector Array has a total power dissipation of 208 W. To meet the stringent temperature gradient and thermal stability requirements in the normal operational mode, and heater power budget in both the normal operational and safehold modes, the Detector Array is thermally well coupled to eight constant conductance heat pipes (CCHPs) embedded in the Detector Array Plate (DAP), and two loop heat pipes (LHPs) transport heat fiom the CCHPs to a radiator. The CCHPs have ammonia as the working fluid and the LHPs have propylene as the working fluid. Precision heater controllers, which have adjustable set points in flight, are used to control the LHP compensation chamber and Detector Array XA1 ASIC temperatures. The radiator has the AZ-Tek AZW-LA-II low-alpha white paint as the thermal coating and is located on the anti-sun side of the spacecraft. This paper presents the characteristics, ground operation and flight operation procedures of the LHP thermal system.

Choi, Michael K.↗

GN&C Sequencing for Orion Rendezvous, Proximity Operations, and Docking

As part of the Artemis program to return humans to the lunar surface, the National Aeronautics and Space Administration is planning to use the Orion Multi- Purpose Crew Vehicle to transport crew to a small orbital platform called Gate- way in cislunar space. To facilitate this activity, Orion is required to perform Rendezvous, Proximity Operations, and Docking (RPOD) with both the Gate- way and the launch vehicle upper stage. The Orion spacecraft uses sequencing in the form of Phases, Segments, Activities, and Modes (PSAM) to configure Guidance, Navigation, & Control (GN&C) software during each portion of the mission. Significant updates to Orion PSAM definitions are required for RPOD. This paper describes the process of defining these new sequencing elements, implementing them in prototype flight software, and testing them in an integrated simulation environment. First, requirements are specified to determine the nominal and off-nominal sequencing behavior necessary to complete the mission. These requirements also specify which software functions should be fully autonomous and which functions require manual interactions from crew or ground operators. Next, the RPOD concept of operations is defined with detailed events listed in a mission timeline. Third, a state machine diagram is developed to show all PSAM states, including all possible transitions between them. After this, the PSAM states and transitions are entered into a sequencing software emulator and parameter values and modes are defined for GN&C software elements. Finally, the PSAM architecture is tested within an integrated simulation environment by connecting it with prototypes of relevant GN&C flight software elements and with detailed vehicle models. After the sequencing design has been finalized and tested, it is implemented in flight software.

Schulte, Peter Z.↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Objective Lightning Forecasting at Kennedy Space Center/Cape Canaveral Air Force Station using Cloud-to-Ground Lightning Surveillance System Data

The 45th Weather Squadron (45 WS) forecasters at Cape Canaveral Air Force Station (CCAFS) in Florida include a probability of thunderstorm occurrence in their daily morning briefings. This information is used by personnel involved in determining the possibility of violating Launch Commit Criteria, evaluating Flight Rules for the Space Shuttle, and daily planning for ground operation activities on Kennedy Space Center (KSC)/CCAFS. Much of the current lightning probability forecast is based on a subjective analysis of model and observational data. The forecasters requested that a lightning probability forecast tool based on statistical analysis of historical warm-season (May - September) data be developed in order to increase the objectivity of the daily thunderstorm probability forecast. The tool is a set of statistical lightning forecast equations that provide a lightning occurrence probability for the day by 1100 UTC (0700 EDT) during the warm season. This study used 15 years (1989-2003) of warm season data to develop the objective forecast equations. The local CCAFS 1000 UTC sounding was used to calculate stability parameters for equation predictors. The Cloud-to-Ground Lightning Surveillance System (CGLSS) data were used to determine lightning occurrence for each day. The CGLSS data have been found to be more reliable indicators of lightning in the area than surface observations through local informal analyses. This work was based on the results from two earlier research projects. Everitt (1999) used surface observations and rawinsonde data to develop logistic regression equations that forecast the daily thunderstorm probability at CCAFS. The Everitt (1999) equations showed an improvement in skill over the Neumann-Pfeffer thunderstorm index (Neumann 1971), which uses multiple linear regression, and also persistence and climatology forecasts. Lericos et al. (2002) developed lightning distributions over the Florida peninsula based on specific flow regimes. The flow regimes were inferred from the average wind direction in the 1000-700 mb layer at Miami (MIA), Tampa (TBW), and Jacksonville (JAX), Florida, and the lightning data were from the National Lightning Detection Network. The results suggested that the daily flow regime may be an important predictor of lightning occurrence on KSC/CCAFS.

Lambert, Winifred↗

Study of application of space telescope science operations software for SIRTF use

The design and development of the Space Telescope Science Operations Ground System (ST SOGS) was evaluated to compile a history of lessons learned that would benefit NASA's Space Infrared Telescope Facility (SIRTF). Forty-nine specific recommendations resulted and were categorized as follows: (1) requirements: a discussion of the content, timeliness and proper allocation of the system and segment requirements and the resulting impact on SOGS development; (2) science instruments: a consideration of the impact of the Science Instrument design and data streams on SOGS software; and (3) contract phasing: an analysis of the impact of beginning the various ST program segments at different times. Approximately half of the software design and source code might be useable for SIRTF. Transportability of this software requires, at minimum, a compatible DEC VAX-based architecture and VMS operating system, system support software similar to that developed for SOGS, and continued evolution of the SIRTF operations concept and requirements such that they remain compatible with ST SOGS operation.

Dignam, F.↗

Pre-Hardware Optimization and Implementation Of Fast Optics Closed Control Loop Algorithms

One of the main heritage tools used in scientific and engineering data spectrum analysis is the Fourier Integral Transform and its high performance digital equivalent - the Fast Fourier Transform (FFT). The FFT is particularly useful in two-dimensional (2-D) image processing (FFT2) within optical systems control. However, timing constraints of a fast optics closed control loop would require a supercomputer to run the software implementation of the FFT2 and its inverse, as well as other image processing representative algorithm, such as numerical image folding and fringe feature extraction. A laboratory supercomputer is not always available even for ground operations and is not feasible for a night project. However, the computationally intensive algorithms still warrant alternative implementation using reconfigurable computing technologies (RC) such as Digital Signal Processors (DSP) and Field Programmable Gate Arrays (FPGA), which provide low cost compact super-computing capabilities. We present a new RC hardware implementation and utilization architecture that significantly reduces the computational complexity of a few basic image-processing algorithm, such as FFT2, image folding and phase diversity for the NASA Solar Viewing Interferometer Prototype (SVIP) using a cluster of DSPs and FPGAs. The DSP cluster utilization architecture also assures avoidance of a single point of failure, while using commercially available hardware. This, combined with the control algorithms pre-hardware optimization, or the first time allows construction of image-based 800 Hertz (Hz) optics closed control loops on-board a spacecraft, based on the SVIP ground instrument. That spacecraft is the proposed Earth Atmosphere Solar Occultation Imager (EASI) to study greenhouse gases CO2, C2H, H2O, O3, O2, N2O from Lagrange-2 point in space. This paper provides an advanced insight into a new type of science capabilities for future space exploration missions based on on-board image processing for control and for robotics missions using vision sensors. It presents a top-level description of technologies required for the design and construction of SVIP and EASI and to advance the spatial-spectral imaging and large-scale space interferometry science and engineering.

Kizhner, Semion↗

A Prognostics Framework Development for Swarm Satellite Formations

Prognostics is the science of predicting the failure(s) of a component or a system and understanding how the performance will change in the event of a failure or degradation mechanism. With accurate predictions of possible failures, autonomous mitigative actions can be taken to correct/repair any issues or alert human operators of a failure threshold exceedance requiring condition-based maintenance. Although there is extensive research on failure predictions for a component or a system, there are significantly more opportunities to foray into failure predictions and prognostics for a system of systems such as an airspace consisting of multiple aircraft, a fleet of unmanned aerial vehicles, and a swarm of intelligent satellite systems. Failure prediction and mitigation are particularly important in autonomous systems such as satellite swarm systems that need effective resource management and minimal human interactions. Based on NASA's decadal survey, there is a clear need to prioritize the development of satellite swarm technology for studies of space physics and Earth science. The science community will propose future missions that return in-situ measurements from a 3-D (three-dimensional) volume of space, with relative spacecraft motion and inter-satellite baselines controlled according to the mission objectives. For such multi-spacecraft missions, it is required that ground operations resources do not scale with the number of satellites, thus compromising the swarm or leading to inefficiencies in resource allocation. Swarms of tens or hundreds of small satellites will require autonomy in attitude control, navigation and failure. Although significant research has been conducted in the areas of autonomous formation flying algorithms, less attention has been given to the development of resilient systems robust to failures.The focus of this research paper is the integration of model-based prognostics into the swarm dynamics control and decision-making algorithms. We simulate swarm management strategies for a subsystem failure to demonstrate the importance of failure predictions by comparing two cases: (i) no health information is provided to the system and utilized in the decision-making process and (2) system health information is obtained using prognostics and employed by the control system. One example scenario presented is for the GPS (Global Positioning System) system of an individual satellite to perform off-nominally due to increasing estimated error. In this scenario, the keep-out zone for that satellite would become more conservative, thereby decreasing the risk of collision. This is achieved via tuning the individual artificial repulsive functions assigned to each satellite.This paper is structured as follows. First we provide an overview of current swarm technology development, where we specifically use the term swarm to define multiple satellites flying in formation in similar orbits, with cross-link communication and station-keeping capabilities. Second, we give an introduction to the Swarm Orbital Dynamics Advisor (SODA), a tool that accepts high-level configuration commands and provides the orbital maneuvers required to achieve the prescribed formation configuration. Third, we provide the details of the model-based prognostics algorithm implementation in SODA. Finally, we present different case studies for potential component/subsystem failures and the swarm responses based with and without failure prediction information.

prognostics↗

Design requirements for operational earth resources ground data processing

Realistic tradeoff data and evaluation techniques were studied that permit conceptual design of operational earth resources ground processing systems. Methodology for determining user requirements that utilize the limited information available from users is presented along with definitions of sensor capabilities projected into the shuttle/station era. A tentative method is presented for synthesizing candidate ground processing concepts.

Baldwin, C. J.↗

Weather Research and Forecasting Model Sensitivity Comparisons for Warm Season Convective Initiation

Mesoscale weather conditions can significantly affect the space launch and landing operations at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). During the summer months, land-sea interactions that occur across KSC and CCAFS lead to the formation of a sea breeze, which can then spawn deep convection. These convective processes often last 60 minutes or less and pose a significant challenge to the forecasters at the National Weather Service (NWS) Spaceflight Meteorology Group (SMG). The main challenge is that a "GO" forecast for thunderstorms and precipitation is required at the 90 minute deorbit decision for End Of Mission (EOM) and at the 30 minute Return To Launch Site (RTLS) decision at the Shuttle Landing Facility. Convective initiation, timing, and mode also present a forecast challenge for the NWS in Melbourne, FL (MLB). The NWS MLB issues such tactical forecast information as Terminal Aerodrome Forecasts (TAFs), Spot Forecasts for fire weather and hazardous materials incident support, and severe/hazardous weather Watches, Warnings, and Advisories. Lastly, these forecasting challenges can also affect the 45th Weather Squadron (45 WS), which provides comprehensive weather forecasts for shuttle launch, as well as ground operations, at KSC and CCAFS. The need for accurate mesoscale model forecasts to aid in their decision making is crucial. Both the SMG and the MLB are currently implementing the Weather Research and Forecasting Environmental Modeling System (WRF EMS) software into their operations. The WRF EMS software allows users to employ both dynamical cores - the Advanced Research WRF (ARW) and the Non-hydrostatic Mesoscale Model (NMM). There are also data assimilation analysis packages available for the initialization of the WRF model- the Local Analysis and Prediction System (LAPS) and the Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS). Having a series of initialization options and WRF cores, as well as many options within each core, provides SMG and NWS MLB with a lot of flexibility. It also creates challenges, such as determining which configuration options are best to address specific forecast concerns. The goal of this project is to assess the different configurations available and to determine which configuration will best predict warm season convective initiation in East-Central Florida. Four different combinations of WRF initializations will be run (ADAS-ARW, ADAS-NMM, LAPS-ARW, and LAPS-NMM) at a 4-km resolution over the Florida peninsula and adjacent coastal waters. Five candidate convective initiation days using three different flow regimes over East-Central Florida will be examined, as well as two null cases (non-convection days). Each model run will be integrated 12 hours with three runs per day, at 0900, 1200, and 1500 UTe. ADAS analyses will be generated every 30 minutes using Level II Weather Surveillance Radar-1988 Doppler (WSR-88D) data from all Florida radars to verify the convection forecast. These analyses will be run on the same domain as the four model configurations. To quantify model performance, model output will be subjectively compared to the ADAS analyses of convection to determine forecast accuracy. In addition, a subjective comparison of the performance of the ARW using a high-resolution local grid with 2-way nesting, I-way nesting, and no nesting will be made for select convective initiation cases. The inner grid will cover the East-Central Florida region at a resolution of 1.33 km. The authors will summarize the relative skill of the various WRF configurations and how each configuration behaves relative to the others, as well as determine the best model configuration for predicting warm season convective initiation over East-Central Florida.

Watson, Leela R.↗

Weather Research and Forecasting Model Sensitivity Comparisons for Warm Season Convective Initiation

Mesoscale weather conditions can significantly affect the space launch and landing operations at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). During the summer months, land-sea interactions that occur across KSC and CCAFS lead to the formation of a sea breeze, which can then spawn deep convection. These convective processes often last 60 minutes or less and pose a significant challenge to the forecasters at the National Weather Service (NWS) Spaceflight Meteorology Group (SMG). The main challenge is that a "GO" forecast for thunderstorms and precipitation at the Shuttle Landing Facility is required at the 90 minute deorbit decision for End Of Mission (EOM) and at the 30 minute Return To Launch Site (RTLS) decision. Convective initiation, timing, and mode also present a forecast challenge for the NWS in Melbourne, FL (MLB). The NWS MLB issues such tactical forecast information as Terminal Aerodrome Forecasts (TAF5), Spot Forecasts for fire weather and hazardous materials incident support, and severe/hazardous weather Watches, Warnings, and Advisories. Lastly, these forecasting challenges can also affect the 45th Weather Squadron (45 WS), which provides comprehensive weather forecasts for shuttle launch, as well as ground operations, at KSC and CCAFS. The need for accurate mesoscale model forecasts to aid in their decision making is crucial. This study specifically addresses the skill of different model configurations in forecasting warm season convective initiation. Numerous factors influence the development of convection over the Florida peninsula. These factors include sea breezes, river and lake breezes, the prevailing low-level flow, and convergent flow due to convex coastlines that enhance the sea breeze. The interaction of these processes produces the warm season convective patterns seen over the Florida peninsula. However, warm season convection remains one of the most poorly forecast meteorological parameters. To determine which configuration options are best to address this specific forecast concern, the Weather Research and Forecasting (WRF) model, which has two dynamical cores - the Advanced Research WRF (ARW) and the Non-hydrostatic Mesoscale Model (NMM) was employed. In addition to the two dynamical cores, there are also two options for a "hot-start" initialization of the WRF model - the Local Analysis and Prediction System (LAPS; McGinley 1995) and the Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS; Brewster 1996). Both LAPS and ADAS are 3- dimensional weather analysis systems that integrate multiple meteorological data sources into one consistent analysis over the user's domain of interest. This allows mesoscale models to benefit from the addition of highresolution data sources. Having a series of initialization options and WRF cores, as well as many options within each core, provides SMG and MLB with considerable flexibility as well as challenges. It is the goal of this study to assess the different configurations available and to determine which configuration will best predict warm season convective initiation.

Watson, Leela R.↗

Space Transportation Systems Life Cycle Cost Assessment and Control

Civil and military applications of space transportation have been pursued for just over 50 years and there has been, and still is, a need for safe, dependable, affordable, and sustainable space transportation systems. Fully expendable and partially reusable space transportation systems have been developed and put in operation that have not adequately achieved this need. Access to space is technically achievable, but presently very expensive and will remain so until there is a breakthrough in the way we do business. Since 1991 the national Space Propulsion Synergy Team (SPST) has reviewed and assessed the lessons learned from the major U.S. space programs of the past decades focusing on what has been learned from the assessment and control of Life Cycle Cost (LCC) from these systems. This paper presents the results of a selected number of studies and analyses that have been conducted by the SPST addressing the need, as well as the solutions, for improvement in LCC. The major emphasis of the SPST processes is on developing the space transportation system requirements first (up front). These requirements must include both the usual system flight performance requirements and also the system functional requirements, including the infrastructure on Earth's surface, in-space and on the Moon and Mars surfaces to determine LCC. This paper describes the development of specific innovative engineering and management approaches and processes. This includes a focus on flight hardware maturity for reliability, ground operations approaches, and business processes between contractor and government organizations. A major change in program/project cost control is being proposed by the SPST to achieve a sustainable space transportation system LCC - controlling cost as a program metric in addition to the existing practice of controlling performance and weight. Without a firm requirement and methodically structured cost control, it is unlikely that an affordable and sustainable space transportation system LCC will ever be achieved. '

Robinson, John W.↗

Lights Out Operations of a Space, Ground, Sensorweb

We have been operating an autonomous, integrated sensorweb linking numerous space and ground sensors in 24/7 operations since 2004. This sensorweb includes elements of space data acquisition (MODIS, GOES, and EO-1), space asset retasking (EO-1), integration of data acquired from ground sensor networks with on-demand ground processing of data into science products. These assets are being integrated using web service standards from the Open Geospatial Consortium. Future plans include extension to fixed and mobile surface and subsurface sea assets as part of the NSF's ORION Program.

Chien, Steve↗

Communication Research in Aviation and Space Operations: Symptoms and Strategies of Crew Coordination

The day-to-day operators of today's aerospace systems work under increasing pressures to accomplish more with less. They work in operational systems which are complex, technology-based, and high-risk; in which incidents and accidents have far-reaching and costly consequences. For these and other reasons, there is concern that the safety net formerly built upon redundant systems and abundant resources may become overburdened. Although we know that human ingenuity can overcome incredible odds, human nature can also fail in unpredictable ways. Over the last 20 years, a large percentage of aviation accidents and incidents have been attributed to human errors rather than hardware or environmental factors alone. A class of errors have been identified which are not due to a lack of individual, technical competencies. Rather, they are due to the failure of teams to utilize readily available resources or information in a timely fashion. These insights began a training revolution in the aviation industry called Cockpit Resource Management, which later became known as Crew Resource Management (CRM) as its concepts and applications extended to teams beyond the flightdeck. Then, as now, communication has been a cornerstone in CRM training since crew coordination and resource management largely resides within information transfer processes--both within flightcrews, and between flightcrews and the ground operations teams that support them. The research I will describe takes its roots in CRM history as we began to study communication processes in order to discover symptoms of crew coordination problems, as well as strategies of effective crew management. On the one hand, communication is often the means or the tool by which team members manage their resources, solve problems, maintain situational awareness and procedural discipline. Conversely, it is the lack of planning and resource management, loss of vigilance and situational awareness, and non-standard communications that are implicated in accidents and incidents. NASA/Ames Crew Factors researchers have been developing a model of effective crew coordination in order to understand the sources of performance breakdowns, and to develop effective solutions and interventions. Because communication is a primary mechanism by which information is received and transmitted, and because it is observable behavior, we focus on these group processes in order to identify patterns of communication that distinguish effective from less effective crew performance. Since a prime objective is to develop training recommendations for enhancing communication skills, we interpret our findings in the context of relevant task and environmental conditions, role and procedural constraints, and the normal real-time parameters of flight operations. Another research objective is to consider how communication and coordination can be enhanced through design. For example, flight deck and hardware design as well as procedural and software design may greatly influence the efficiency with which crews communicate and coordinate their work. In addition, teams and tasks may be designed, organized, and trained so that team interactions with each other are based upon appropriately shared knowledge, procedures and situation awareness. In short, we are interested in enhancing communication practices through (1) the training of specific communication skills, and (2) the design of equipment, tasks, procedures, and teams that optimize smooth, unambiguous communication processes. Two examples of communication research will be described; one in aviation and one in space operations. The first example is a high-fidelity full mission simulation study which investigates the affect of flightdeck automation on crew coordination and communication (contrasting crew performance in the DC-9 vs. MD88). Additional information is contained in the original extended abstract.

Kanki, Barbara G.↗

Manned Spacecraft Landing and Recovery

As recent history has tragically demonstrated, a successful space mission is not complete until the crew has safely returned to earth and has been successfully recovered. It is noted that a safe return to earth does not guarantee a successful recovery. The focus of this presentation will be a discussion of the ground operation assets involved in a successful recovery. The author's experience in land and water-based recovery of crewed vehicles and flight hardware at Kennedy Space Center (KSC), Edwards Air Force Base, international landing sites, and the Atlantic Ocean provides for some unique insight into this topic. He has participated in many aspects of Space Shuttle landing and recovery operations including activation of Transatlantic Abort Landing (TAL) sites and Emergency Landing Sites (ELS) as an Operations Test Director, execution of post landing convoy operations as an Orbiter Move Director, Operations Test Director, and Landing and Recovery Director, and recovery of solid rocket boosters, frustum and their parachutes 140 miles offshore in a wide range of sea states as a Retrieval Diver/Engineer. The recovery operations for the Mercury, Gemini, and Apollo were similar from a landing and recovery perspective in th t they all were capsules with limited "flying" capability and had a planned End of Mission (EOM) in an ocean with a descent slowed by parachutes. The general process was to deploy swim teams via helicopters to prepare the capsule for recovery and assist with crew extraction when required. The capsule was then hoisted onto the deck of a naval vessel. This approach required the extensive use and deployment of military assets to support the primary landing zone as well as alternate and contingency locations. The Russian Soyuz capsule also has limited "flying" capability; however, the planned EOM is terrestrial. In addition to use of parachutes to slow the reentry descent, soft-landing rockets on the bottom of the vehicle are employed to cushion the landing. The recovery forces are deployed via helicopters and the capsule is transported by a specialized all-terrain vehicle. The Space Shuttle Orbiter landing and recovery process is considerably different. The added lift capability and maneuverability allow the Orbiter to land at an exact location/runway for a nominal EOM. This allows for a timely response of recovery/contingency rescue forces, centralized staging of personnel and equipment, and assured access by ground vehicles. The well defined landing zone also provides for far more options when selecting landing sites for EOM and emergency returns and the relatively large cross-range capability increases the number of landing opportunities at the preferred sites.

Hammel, Don↗

Technology Integration to Gain Commercial Efficiency for the Urban Goods Delivery System, Meet Future Demand for City Passenger and Delivery Load/Unload Spaces, and Reduce Energy Consumption

This three-year project supported by the U.S. Department of Energy Vehicle Technologies Office has the potential to radically improve the urban freight system in ways that help both the public and private sectors. Working from 2018-2021, project researchers at the University of Washington’s Urban Freight Lab and collaborators at the Pacific Northwest National Laboratory have produced key data, tested technologies in complex urban settings, developed a prototype parking availability app, and helped close major knowledge gaps. All the fruits of this project can be harnessed to help cities better understand, support and actively manage truck load/unload operations and their urban freight transport infrastructure. Project learnings and tools can be used to help make goods delivery firms more efficient by reducing miles traveled and the time it takes to complete deliveries, benefitting businesses and residents who rely on the urban freight system for supplies of goods. And, ultimately, these project learnings and tools can be used to make cities more livable by minimizing wasted travel, which, in turn, contributes to reductions in fuel consumption and emissions. Cities today are challenged to effectively and efficiently manage their infrastructure to absorb the impacts of ever-increasing e-commerce-fueled delivery demand. All delivery trucks need to park somewhere to unload and load. Yet today’s delivery drivers have no visibility on available parking until they arrive at a site, which may be full. That means they can wind up cruising for parking, which wastes time and fuel and contributes to congestion. Once drivers do find parking, the faster they can unload at the spot, the faster they free up space for other drivers, helping others avoid circling for parking. This makes the parking space—and thus the greater load/unload network—more productive. To this end, the research team successfully met the project’s three goals, developing and piloting strategies and technologies to: 1. Reduce parking-seeking behavior in the study area by 20%; 2. Reduce parcel truck dwell time (the time a truck spends in a spot to load/unload) in the study area by 30%; 3. Increase curb space, alley space and private loading bay occupancy rates in the study area. The research team met these goals by creating and piloting on Seattle streets OpenPark, a first-of-its-kind real-time and forecasting curb parking app customized for commercial delivery drivers—giving drivers the “missing link” in their commonly used routing tools that tell them how best to get to delivery locations, but not what parking is available to use when they get there. Installing in-ground sensors on commercial vehicle load zones (CVLZs) and passenger load zones (PLZs) in the 10-block study area in Seattle’s downtown neighbourhood of Belltown let researchers glean real-time curb parking data. The research team also met project goals by piloting three parcel lockers in public and private spaces open to any delivery carrier, creating a consolidated delivery hub that lets drivers complete deliveries faster and spend less time parked. Researchers collected and analysed data to produce the first empirical, robust, statistically significant results as to the impact of the lockers, and app, on on-the-ground operations. In addition to collecting and analyzing sensor and other real-time and historical data, researchers rode along with delivery drivers to confirm real-world routing and parking behavior. Researchers also surveyed building managers on their private loading bay operations to understand how to boost usage.

97 MATHEMATICS AND COMPUTING↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Function (POIF) is increasing, via the High Operations Tempo (HOT) initiative, its ability to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's need to support this increased crew presence mandated the need for a series of software tools to better handle the increasing pace of payload science operations. The overall need was clear from the outset, but the full scope and user experience for each tool, were not as well understood, so establishing a fixed set of initial requirements was not feasible. An Agile Software Development (ASD) paradigm takes advantage of uncertainty, and plans for it, so it was deemed the most appropriate approach to create room for exploring novel concepts, and to mount a rapid and flexible response to inevitiably changing requirements. It facilitated the need for unprecedented collaboration between the Product Team (i.e. users from the Flight Control Team) and the Development Team (i.e. POIC systems engineers, developers, testers). This is a process shift in the development, test, and release of software from one that is prescriptive to one that is adaptive, which is necessary for these tools to have longevity. The application of ASD to the product development lifecycle permitted the timely incorporation of customer feedback, and, allowed for continuous quality improvements. This resulted in a suite of tools that are efficient, user-friendly, and enable POIF ground systems to support the increasing pace of payload science operations. ASD is not as much a set of prescriptive processes as it is a shift in mindset; one that moves from planning against change, to planning for change, thereby iteratively growing software towards user-defined value.

Albers, Cerese M.↗

ON THE SOURCE OF PROPAGATING SLOW MAGNETOACOUSTIC WAVES IN SUNSPOTS

Recent high-resolution observations of sunspot oscillations using simultaneously operated ground- and space-based telescopes reveal the intrinsic connection between different layers of the solar atmosphere. However, it is not clear whether these oscillations are externally driven or generated in situ. We address this question by using observations of propagating slow magnetoacoustic waves along a coronal fan loop system. In addition to the generally observed decreases in oscillation amplitudes with distance, the observed wave amplitudes are also found to be modulated with time, with similar variations observed throughout the propagation path of the wave train. Employing multi-wavelength and multi-instrument data, we study the amplitude variations with time as the waves propagate through different layers of the solar atmosphere. By comparing the amplitude modulation period in different layers, we find that slow magnetoacoustic waves observed in sunspots are externally driven by photospheric p-modes, which propagate upward into the corona before becoming dissipated.

79 ASTRONOMY AND ASTROPHYSICS↗