Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

A report on the upper-level wind conditions preceding and during the Shuttle Challenger (STS 51L) explosion

The prelaunch, launch, and postlaunch synoptic-scale weather conditions on January 28, 1986 are described. Particular consideration is given to upper-level jet streams, vertical wind shear, and the possible effect of shear-induced turbulence on Cape Canaveral at the time of the Shuttle launch. General data revealing the relations between wind shear and turbulence and jet streams are discussed. The NWS operational and surface radiosonde data, visible and IR GOES imagery, and total ozone data obtained from TOMS on Nimbus-7 are analyzed. Numerical simulations of the weather conditions were conducted. The simulations and observational data are compared, and the data reveal the juxtaposition of two distinct jet-stream systems (a polar front jet and a subtropical jet) over north-central Florida the morning of the launch. Recommendations for improving the observing system at Cape Canaveral are discussed.

Uccellini, Louis W.↗

Dynamic Model Investigation of a 1/20 Scale Gemini Spacecraft in the Langley Spin Tunnel

The investigation was conducted in the Langley spin tunnel. The tunnel is an atmospheric wind tunnel with a vertically rising airstream in the test section and a maximum airspeed of approximately 90 feet per second. For this investigation, the model was hand launched into the vertically rising airstream. At times the model, both with and without a drogue parachute, was launched gently with as little disturbance as possible to determine what motions of the spacecraft were self-excited. At other times, the spacecraft with pre-deployed drogue parachute was launched into various spinning motions to determine the effectiveness of the drogue parachute in terminating these spinning motions. During drogue-parachute deployment tests, the spacecraft was launched into various spinning and tumbling motions and the drogue parachute was deployed. The motions of the model were photographed with a motion-picture camera, and some of the film records were read to obtain typical time histories of the model motion. The angles of attack indicated in the time histories presented are believed to be accurate within +/-1 degree. The mass and dimensional characteristics of the dynamic model are believed to be measured to an accuracy of: +/-1 percent for the weight, +/-1 percent for z(sub cg)/d, +/-15 percent for x (sub cg), and +/-5 percent for the moments of inertia. The towline and bridle-line lengths were simulated to an accuracy of +/-1 foot full scale.

Lee, Henry A.↗

Methods of Performing Large Scale, Multidimensional Parametric Studies for Space Launch System Mission Analysis

Optimizing a large number of trajectories over a wide range of parameters is a difficult and computationally intensive, particularly when the parametric space has a large number of dimensions. Solving parametric studies like these require good initial conditions for each optimization case, which results in a significant amount of manual interaction and human judgment and can be time consuming. The Space Launch System (SLS) uses POST2 (Program to Optimize Simulated Trajectories II) to simulate different ascent trajectories and perform mission analysis. SLS mission analysis currently uses two types of large scale, multidimensional parameter spaces. The qualifying factor between these spaces is the grid density, which determines the set of applicable solution methodologies. One type has a relatively low number of dimensions (2-3), but a large number of grid coordinates (2000- 4000), whereas the second type has a relatively low number of grid coordinates (150-350), but a higher number of dimensions (7-10).

Stein, W. B.↗

Operational cost drivers

To be economically viable, the operations cost of launch vehicles must be reduced by an order of magnitude as compared to the Space Transportation System (STS). A summary of propulsion-related operations cost drivers derived from a two-year study of Shuttle ground operations is presented. Examples are given of the inordinate time and cost of launch operations caused by propulsion systems designs that did not adequately consider impacts on prelaunching processing. Typical of these cost drivers are those caused by central hydraulic systems, storable propellants, gimballed engines, multiple propellants, He and N2 systems and purges, hard starts, high maintenance turbopumps, accessibility problems, and most significantly, the use of multiple, nonintegrated RCS, OMS, and main propulsion systems. Recovery and refurbishment of SRBs have resulted in expensive crash and salvage operations. Vehicle system designers are encouraged to be acutely aware of these cost drivers and to incorporate solutions (beginning with the design concepts) to avoid business as usual and costs as usual.

Scholz, Arthur L.↗

Skylab rescue capability.

Skylab is an experimental manned space station scheduled to be placed into orbit in 1973. The Skylab system is to provide support for occupancy by a three-man crew for a total of up to five months. After an extensive study of various means by which rescue capability could be provided for Skylab, a plan was devised that provides coverage for those situations which are the most likely to arise. Rescue mission requirements are discussed together with a response-time analysis and the rescue vehicle configuration. The time-to-rescue will vary from 48 to 10 days, depending on the launch-readiness state at the time of a mission emergency.

Kleinknecht, K. S.↗

Revalidation of the Huygens Descent Control Sub-System

The Huygens probe, part of the Cassini mission to Saturn, is designed to investigate the atmosphere of Titan, Saturn's largest moon. The passage of the probe through the atmosphere is controlled by the Descent Control Sub-System (DCSS), which consists of three parachutes and associated mechanisms. The Cassini / Huygens mission was launched in October 1997 and was designed during the early 1990's. During the time since the design and launch, analysis capabilities have improved significantly, knowledge of the Titan environment has improved and the baseline mission has been modified. Consequently, a study was performed to revalidate the DCSS design against the current predictions.

Source record↗

Cosmic ray telescope for OGO 2 and 4 spacecraft

The construction and subsequent flight are described of a cosmic ray telescope aboard the OGO-2 and 4 Spacecraft. This instrument was a combination Cerekov-scintillation counter telescope designed to measure the cosmic ray energy spectrum from 1-15 GV and charge composition from Z=1-8. OGO-2 was launched in October 1965; however, attitude control problems caused a rapid loss of control gas, so that after approximately 2 weeks it was no longer possible to point the spacecraft. This mission was officially declared a failure. The cosmic ray instrument appeared to work well during this time. OGO-4 was launched in July 1967, with a similar telescope aboard. It operated successfully approximately one year. The details of the experiment, its operation, and the results are given.

Webber, W. R.↗

Review of the Lightning Strike Incident at Launch Complex 37 on July 27, 1967, and Comparison to a Gemini Lightning Strike

The Launch Complex 37 lightning strike of July 27, 1967, was reviewed and compared to a similar incident on the Gemini Program. Available data indicate little likelihood of damaging currents having been present in SA-204 Launch Vehicle or the ground equipment during the July 27th incident. Based on the results of subsystem and system testing after the strike, anticipated results of future testing, the six months elapsed time between the strike-and launch, and the fact that much of the critical airborne electrical/electronic equipment has been removed since the strike for other reasons, no new actions are considered necessary at this time in the Gemini case, significant failures occurred in both airborne and ground circuits. Due to the resultant semi, condlictor uncertainty, and the relatively' short time prior to planned launch, all critical airborne components containing semiconduetors were replaced, and a sophisticated data comparison task was implemented.

Llewellyn, J. A.↗

Progress toward an integrated advanced transportation system

Long term mission and payload mass requirements have been inventoried in NASA's Civil Needs Data Base, thereby establishing a framework for the analysis of launch vehicle requirements as well as time-frame requirements for the availability of specific launch vehicle and orbit-transfer vehicle capabilities. The Next Manned Transportation System studies conducted within this framework focus on the definition of options for manned flight operations beyond current Space Shuttle capabilities. Also under way are Assured Crew Return Capability studies for the Space Station Freedom, and Space Transfer Vehicle studies for a space-based aerobraking spacecraft.

Branscome, Darrell R.↗

The First Development of Human Factors Engineering Requirements for Application to Ground Task Design for a NASA Flight Program

The National Aeronautics and Space Administration has long applied standards-derived human engineering requirements to the development of hardware and software for use by astronauts while in flight. The most important source of these requirements has been NASA-STD-3000. While there have been several ground systems human engineering requirements documents, none has been applicable to the flight system as handled at NASA's launch facility at Kennedy Space Center. At the time of the development of previous human launch systems, there were other considerations that were deemed more important than developing worksites for ground crews; e.g., hardware development schedule and vehicle performance. However, experience with these systems has shown that failure to design for ground tasks has resulted in launch schedule delays, ground operations that are more costly than they might be, and threats to flight safety. As the Agency begins the development of new systems to return humans to the moon, the new Constellation Program is addressing this issue with a new set of human engineering requirements. Among these requirements is a subset that will apply to the design of the flight components and that is intended to assure ground crew success in vehicle assembly and maintenance tasks. These requirements address worksite design for usability and for ground crew safety.

Dischinger, H. Charles, Jr.↗

Gamma-ray burst observations from the UCB/LASL experiment of ISEE-3

The University of California at Berkeley (UCB)/Los Alamos Scientific Laboratory (LASL) gamma-ray burst experiment on board ISEE-3 is described and initial results of the experiment are presented. The instrument consists of an X-ray spectrometer originally designed to monitor solar emission continuously over the energy range 4.8-1264 keV with additional electronics to record data from the intense, short-lived gamma ray bursts at a very high rate and with good timing accuracy. Since the launch of ISEE-3 into a heliocentric orbit at the inner Lagrangian point in August, 1978, the UCB/LASL experiment has detected and recorded 12 gamma-ray bursts, including the unusually intense burst of November 4, 1978, which exhibited most of the classical gamma-ray burst characteristics, the intense burst of November 19, 1978, with an atypical time history and an unusually hard spectrum, and the extended burst of March 7, 1979. The spectral and temporal data demonstrate the diverse nature of the gamma-ray burst phenomenon, and are currently being combined with those of the Pioneer Venus Orbiter and Venera 11 and 12 to obtain accurate burst locations.

Evans, W. D.↗

Interplanetary missions for the late twentieth century

A set of missions that is feasible during the remainder of this century and which will significantly contribute to our understanding of the solar system is presented. Targets include comets, asteroids, the outer planets and their satellites, and Mars. Mission opportunities for these targets are described in terms of launch vehicle, propulsion, and flight-time requirements, as well as other mission constraints such as launch payload margin and launch period objectives. Examples of encounter designs are also given.

Wallace, R. A.↗

SLS Overview and Progress

Space Launch System will be able to offer payload accommodations with five times more volume than any contemporary launch vehicle Payload fairings of up to 10-meter diameter are being studied Space Launch System will offer an initial capability of greater than 70 metric tons to low Earth orbit; current U.S. launch vehicle maximum is 28 t Evolved version of SLS will offer Mars-enabling capability of greater than 130 metric tons to LEO SLS offers reduced transit times to the outer solar system by half or greater Higher characteristic energy (C3) also enables larger payloads to destination

Honeycutt, John↗

NASA's Space Launch System: Progress Toward the Proving Ground

Space Launch System will be able to offer payload accommodations with five times more volume than any contemporary launch vehicle. center dot Payload fairings of up to 10-meter diameter are planned. Space Launch System will offer an initial capability of greater than 70 metric tons to low Earth orbit; current U.S. launch vehicle maximum is 28 t. center dot Evolved version of SLS will offer greatest-ever capability of greater than 130 t to LEO. SLS offers reduced transit times to the outer solar system by half or greater. center dot Higher characteristic energy (C3) also enables larger payloads to destination.

Jackman, Angie↗

SIMSAT: An object oriented architecture for real-time satellite simulation

Real-time satellite simulators are vital tools in the support of satellite missions. They are used in the testing of ground control systems, the training of operators, the validation of operational procedures, and the development of contingency plans. The simulators must provide high-fidelity modeling of the satellite, which requires detailed system information, much of which is not available until relatively near launch. The short time-scales and resulting high productivity required of such simulator developments culminates in the need for a reusable infrastructure which can be used as a basis for each simulator. This paper describes a major new simulation infrastructure package, the Software Infrastructure for Modelling Satellites (SIMSAT). It outlines the object oriented design methodology used, describes the resulting design, and discusses the advantages and disadvantages experienced in applying the methodology.

Williams, Adam P.↗

A Sounding Rocket Investigation of the Fine Structure in the Mesopause Region in Conjunction with High Spatial Resolution Lidar Measurements

The grant funds were provided to carry out chemical tracer wind and turbulence measurements in the mesosphere and lower thermosphere as part of the Turbulent Oxygen Mixing Experiment (TOMEX) for which Dr. James Hecht of the Aerospace Corp. was the Principal Investigator. Clemson University designed, built, and tested two chemical tracer release payload sections for the 21.126 and 21.127 payloads which, in addition, had photometer and ionization gauge instrumentation. The tracer chemical was trimethyl aluminum (TMA). The experiment was carried out at White Sands Missile Range in New Mexico on October 26,2000. The location was chosen because of the proximity to the Starfire Optical Range (SOR) which hosted the powerful University of Illinois sodium lidar for an extended period prior to and also during the launch window. Since the SOR telescope is fully steerable, lidar measurements in the same volume sampled by the rocket were possible. The primary objective of the experiment was to measure the turbulent diffusion and mixing in the mesosphere and lower thermosphere, especially in layers characterized by convective and/or dynamical instabilities. The lidar, which is capable of measuring the sodium density, temperatures, and winds with good range and time resolution, provided the launch criteria, as well as context measurements for the in situ rocket observations.

Larsen, M. F.↗

NASA Support for Commercial Crew Launch Capabilities

Since the earliest days of U.S. human spaceflight, NASA’s Marshall Space Flight Center in Huntsville, Alabama, has played a key role in American crew launch capability, from engineering support for the first Mercury-Redstone launches, to the Saturn launches to the Moon, through Shuttle and now Artemis. Today, Marshall brings that expertise gained through decades of crewed space launches to NASA’s Commercial Crew Program (CCP), providing launch vehicle engineering and programmatic support. The team’s responsibilities have included human certification of commercial launch systems for the CCP missions, including Atlas V and Falcon 9, and verifying each launch vehicle complies with flight certification. MSFC provides expertise in nearly all aspects of launch vehicle design and performance including solid motors and liquid engines, stage propulsion, thrust vector control, structural and dynamics, safety and mission assurance. During each commercial crew launch, an engineering support team is on console at Marshall’s Huntsville Operations Support Center, which has provided launch operations support since Apollo, providing real-time oversight to safety standards for the vehicle and verifying data. Launch vehicle support for Commercial Crew has come as a paradigm shift for the MSFC team, inspiring new approaches that leverage expertise and best practices from past NASA-developed launch vehicle missions, while at the same time providing new synergies from work with commercial partners on CCP. This paper will explore the role that the Marshall launch vehicle services team plays in the Commercial Crew Program, as well as lessons learned from the program that will continue to benefit a new era of spaceflight partnerships.

Commercial Crew↗

A Plasma Aerocapture and Entry System for Manned Missions and Planetary Deep Space Orbiters

A rapid mission to Mars requires a large change in vehicle velocity upon arrival to establish a stable orbit. This demand is even greater for a Neptune science, requiring many kilometers per second of V. It is clear from past mission studies that a manned Mars mission and deep space planetary orbiters require aerobraking and aerocapture which use aerodynamic drag forces to slow the spacecraft. Aerocapture would enable long term studies of the outer planets and moons that would not be possible with existing braking methodologies. While the ability to utilize these atmospheres to slow down and capture spacecraft would dramatically reduce the cost, launch mass, and travel time, currently planned approaches require significant additional spacecraft mass and risk as the spacecraft must descend deep into the planetary atmosphere in order to produce significant drag on a relatively small aeroshell. The plasma based Magnetoshell being developed in this program holds the potential to perform the desired braking with significantly increased drag and control while dramatically reducing mass. Most importantly, this technology significantly lowers the risk involved with aerocapture thereby making manned planetary missions possible. The fundamental physics of the Magnetoshell is based on demonstrated experimental results. Successful implementation will dramatically decrease radiation exposures, mission risk, launch cost, and launch mass. Implementation of aerobraking by employing a solid deflector or aeroshell as a method for orbit insertion and circularization has been successfully demonstrated in the past, resulting in launch mass savings greater than 50%. In order to reduce the effect of frictional heating and dynamic pressure on the typically fragile aeroshell, or worse solar panels, the braking must be distributed over many orbital passes at a high altitude in the less dense regions of the atmosphere. It can thus take several months for a meter-scale, 1000 kg, aeroshell to execute the many elliptic orbital passes through the atmosphere to achieve the required V. This rather slow method of braking not only reduces frictional heating and dynamic forces, but also avoids unpredictable dynamic behavior due to turbulence, as well as unknown and seasonally variable atmospheric composition and temperature which has led to dangerous, mission-critical events. For exploration class missions such as DRA 5.0 aerocapture and Thermal Protection Systems (TPS) are proposed for breaking at Mars for cargo missions. Traditional aerocapture is considered too risky for manned missions. Even with the enormous mass savings that aerocapture allows, it still requires 80 tons of aeroshell and significantly increased launch mass and propellant. As will be shown, by using Magnetoshells for aerobraking, the DRA 5.0 mission will save 224 metric tons (MT) and greater than $2 B in launch costs. Beyond the dramatic savings for existing mission architectures, a low-mass, risk-free aerocapture system would allow much more rapid missions to Mars and deep space orbiters by allowing direct, faster trajectories. As will be shown, the plasma Magnetoshell Aerobraking, Aerocapture, and Entry System (AAES) not only reduces mass and cost while enabling significant new mission architectures, but also significantly reduces radiation exposures by decreasing trip times.

Manned Missions↗