Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Satellite-Based Assessment of Rocket Launch and Coastal Change Impacts on Cape Canaveral Barrier Island, Florida, USA

The Cape Canaveral Barrier Island, home to the National Aeronautics and Space Administration (NASA)’s Kennedy Space Center and the United States (U.S.) Space Force’s Cape Canaveral Space Force Station, is situated in a unique ecological transition zone that supports diverse wildlife. This study evaluates the recent changes in vegetation cover (2016–2023) and dune elevation (2007–2017) within the Cape Canaveral Barrier Island using high-resolution optical satellite and light detection and ranging (LiDAR) data. The study period was chosen to depict the time period of a recent increase in rocket launches. The study objectives include assessing changes in vegetation communities, identifying detectable impacts of liquid propellant launches on nearby vegetation, and evaluating dune elevation and tide level shifts near launchpads. The results indicate vegetation cover changes, including mangrove expansion in wetland areas and the conversion of coastal strands to denser scrubs and hardwood forests, which were likely influenced by mild winters and fire management. While detectable impacts of rocket launches on nearby vegetation were observed, they were less severe than those caused by solid rocket motors. Compounding challenges, such as rising tide levels, beach erosion, and wetland loss, potentially threaten the resilience of launch operations and the surrounding habitats. The volume and scale of launches continue to increase, and a balance between space exploration and ecological conservation is required in this biodiverse region. This study focuses on the assessment of barrier islands’ shorelines.

54 ENVIRONMENTAL SCIENCES↗

On obtaining lunar mission launch opportunities

A general procedure for predicting launch opportunities for the RAE-B lunar orbiter mission is presented. It is shown that knowledge of the earth-moon distance and lunar phase and declination are sufficient to determine launch periods consistent with present mission constraints and to approximately predict launch, transfer, and arrival parameters such as park orbit coast time, the possiblity of shadows in all phases of the mission, arrival energy, and the amount of sunlit orbit time in the lunar orbit. Constraints on RAE-B include bounds on the spin axis-sun angle in the translunar trajectory, an upper limit on the arrival energy, and a minimum time for sunlight duration in lunar orbits are being considered for the mission. Comparisons are made of relevant parameters for the two cases. The general features of launch, transfer, and arrival parameters are discussed and are shown to be a function of lunar declination, flight time, and launch azimuth.

Swartwood, H., Jr.↗

Advanced small launch vehicle study

A conceptual design study was conducted to determine the most economical (lowest cost/launch) approach for the development of an advanced small launch vehicle (ASLV) for use over the next decade. The ASLV design objective was to place a 340 kg (750 lb) payload into a 556 km (300 n.mi.) circular orbit when launched due east from Wallops Island, Virginia. The investigation encompassed improvements to the current Scout launch vehicle; use of existing military and NASA launch vehicle stages; and new, optionally staged vehicles. Staging analyses included use of liquid, solid, and hybrid propellants. Improvements in guidance, controls, interstages, telemetry, and payload shroud were also considered. It was concluded that the most economical approach is to progressively improve the Scout launch vehicle in three phased steps which are discussed.

Reins, G. E.↗

Launch vehicle system requirements and restraints for the ERTS-A spacecraft

The technical requirements and restraints imposed by the ERTS spacecraft upon the Delta launch vehicle, shroud system, associated launch complex, and range are presented for technical coordination among various agencies involved in the launch vehicle and launch operations. The payload and spacecraft systems are described, and the mission, design, test, and launch base data are outlined.

Corrigan, J. F.↗

Saturn 5 Launch Vehicle Flight Evaluation Report, SA-513, Skylab 1

Saturn V SA-513 (Skylab-1) was launched at 13:30:00 Eastern Daylight Time (EDT) on May 14, 1973, from Kennedy Space Center, Complex 39, Pad A. The vehicle lifted off on a launch azimuth of 90 degrees east of north and rolled to a flight azimuth of 40.88 degrees east of north. The launch vehicle successfully placed the Saturn Work Shop in the planned earth orbit. All launch vehicle objectives were accomplished. No launch vehicle failures or anomalies occurred that seriously affected the mission.

Source record↗

Skylab 2 post-launch report (RCS 76-0000-00048)

The launch vehicle stages for SL-2, the CSM experiments, and their associated support equipment are reported. The performance of KSC systems in support of processing and launch of the SL-2 are described along with major processing events for each launch vehicle stage, the spacecraft, and the general experiments of the SL-2 S/V. The final countdown and hold times are noted and a summary of the launch vehicle is included. The weather conditions at launch time and the range support activities are given.

Source record↗

Apollo Saturn 511 effluent measurements from the Apollo 16 launch operations: An experiment

An experiment was performed in conjunction with the Apollo 16 launch to define operational and instrumentational problems associated with launch-vehicle exhaust effluent monitoring. Ground and airborne sampling were performed for CO, CO2, hydrocarbons, and particulates. Sampling systems included filter pads and photometers for particulates and whole-air grab samples for gases. Launch debris was identified in the particulate samples at ground level(taken immediately after launch) and in the airborne measurements (taken 40 to 50 minutes after launch approximately 40 km downwind of the pad). Operational problems were identified and included the need for higher instrumentation mobility and the need for real-time sampling instrumentation as opposed to collection-type samples such as the whole-air grab sample.

Gregory, G. L.↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

ATS-F launch planning document

Launch operations of the ATS 6 satellite and the Titan 3 C launch vehicle are analyzed. The subjects discussed are: (1) launch vehicle trajectory, (2) launch vehicle mark events, (3) standard orbital parameter messages, (4) STADAN ground station visibility, (5) launch window, (6) separation attitude, and (7) separation events. The VHF Omni earth coverage antenna is described. Graphs of visibility from various ground stations are developed.

Walsh, R.↗

On the launch vehicle payload interface response

A method has been developed by which an estimate of the launch vehicle/payload interface response is derived from the interface responses obtained from missions with the identical launch vehicle but different payloads. This method requires knowledge of the launch vehicle eigenvalues, interface modal displacements, and the dynamic characteristics of the payloads. No other launch vehicle information is required. The organization responsible for the payload is able to perform loads and responses analysis resulting from a payload change without interfacing with the launch vehicle organization.

Chen, J. C.↗

Solar power satellite system definition study. Part 2, volume 8: SPS launch vehicle ascent and entry sonic overpressure and noise effects

Recoverable launch vehicle concepts for the Solar Power Satellite program were identified. These large launch vehicles are powered by proposed engines in the F-1 thrust level class. A description of the candidate launch vehicles and their operating mode was provided. Predictions of the sonic over pressures during ascent and entry for both types of vehicles, and prediction of launch noise levels in the vicinity of the launch site were included. An overall assessment and criteria for sonic overpressure and noise levels was examined.

Source record↗

Summary of airborne chlorine and hydrogen chloride gas measurements for August 20 and September 5, 1977 Voyager launches at Air Force Eastern Test Range, Florida

Airborne chlorine and hydrogen chloride measurements were made in the tropospheric ground cloud following the Voyager launches of August 20 and September 5, 1977. The maximum observed hydrogen chloride concentration for both launches was about 25 to 30 parts per million (ppm) occurring typically 2 to 6 minutes after launch. By completion of the sampling mission (1-1/2 hours for August, 4-1/2 hours for September), the maximum in-cloud concentration decayed to about 1 to 2 ppm. Maximum observed chlorine concentrations were about 40 to 55 parts per billion (ppb) about 2 to 8 minutes after launch; by about 15 minutes after launch, chlorine concentrations were less than 10 ppb (detection limit). In-cloud chlorine concentrations were well below 1 percent of hydrogen chloride concentrations. The appendix of the report discusses the chlorine instrument and the laboratory evaluation of the detector.

Gregory, G. L.↗

NASA to launch NOAA's GOES-C earth monitoring satellite

NASA's launch of the GOES-C geostationary satellite from Kennedy Space Center, Florida is planned for June 16, 1978. The launch vehicle is a three stage Delta 2914. As its contribution, GOES-C will contribute information from a data sparse area of the world centered in the Indian Ocean. GOES-C will replace GOES-1 and will become GOES-3 once it has successfully orbited at 35,750 kilometers (22,300 miles). NASA's Spaceflight Tracking and Data Network (STDN) will provide support for the mission. Included in the article are: (1) Delta launch vehicle statistics, first, second and third stages; (2) Delta/GOES-C major launch events; (3) Launch operations; (4) Delta/GOES-C personnel.

Source record↗

Plans for West Coast STS launch capability

The layout and scope of operations of the Vandenberg AFB West Coast Launch Site for the Space Shuttle are examined. The launch site intended for the first West Coast launch in December 1983 is being constructed by the United States Air Force. Topic discussed include site/selection/management/concepts, Shuttle hardware flow and related facilities, launch pad operations, orbiter erection at SLC-6 VAFB, solid rocket booster operations, and payload ground processing. In conclusion it is noted that NASA and DOD personnel are working together to ensure that the launch site is completed on schedule at minimum cost.

Murphy, W. P.↗

Fifth FLTSATCOM to be launched

Launch of the FLTSATOOM-E, into an elliptical orbit by the Atlas Centaur launch vehicle is announced. The launch and relevant launch operations are described. A chart of the launch sequence for FLTSATCOM-E communication satellite is given.

Source record↗

Launch summary for 1980

Sounding rockets, artificial Earth satellites, and space probes launched betweeen January 1 and December 31, 1980 are listed. Data tabulated for the rocket launchings show launching site, instruments carried, date of launch, agency rocket identification, sponsoring country, experiment discipline, peak altitude, and the experimenter or institution responsible. Tables for satellites and space probes show COSPAR designation, spacecraft name, country, launch date, epoch date, orbit type, apoapsis, periapsis and inclination period. The functions and responsibilities of the World Data Center and the areas of scientific interest at the seven subcenters are defined. An alphabetical listing of experimenters using the sounding rockets is also provided.

Vostreys, R. W.↗

WESTAR-V launch on delta

The WESTAR-V, the second in a series of second-generation, large, 24-transponder communications satellites developed for the Space Communications Company is discussed. It is scheduled to be launched on a Delta vehicle from the Eastern Space and Missile Center no earlier than June 8, 1982. The launch support for this mission will be provided by NASA, on a reimbursable basis, to the Space Communications Company for a fixed price of $25.OM. The launch vehicle for the WESTAR-V mission will be the Delta 3910 configuration which incorporates an extended long tank Thor booster, nine Castor IV strap-on motors, a TR-201 second stage, and an 8-foot fairing. The Delta launch vehicle will place the spacecraft along a suborbital trajectory. The PAM-D stage will then thrust it to a synchronous transfer orbit. Three days after launch, the spacecraft apogee kick motor will be fired to circularize its orbit at geosynchronous altitude of 19,300 NM above the equator at approxmately 75 degrees west longitude.

Source record↗

Environmental noise assessment STS-1 Columbia launch

An environmental noise assessement of the initial launch of the Space Transportation System, STS-1 Columbia was conducted. The principal objective of the environmental noise assessment was to measure the noise generated during the initial launch of the space shuttle to ascertain the validity of the levels predicted in the 1979 environmental impact statement. In the 1979 study information obtained for expendable launch vehicles, Titan, Saturn and Atlas was used to predict the noise levels that would be generated by the simultaneous firing of the two solid rocket boosters and the three space shuttle main engines. Fifteen monitoring sites were established in accessable areas located from 4,953 to 23,640 meters from the launch pad. Precision sound level meters were used to capture the peak level during the launch. Data obtained was compared to the predicted levels and were also compared to the identified levels, standards and criteria established by the federal agencies with noise abatement and control responsibilities.

Putnicki, G. J.↗