At least 487 records · Page 27

First Beam and High-Gradient Cryomodule Commissioning Results of the Advanced Superconducting Test Accelerator at Fermilab

The advanced superconducting test accelerator at Fermilab has accelerated electrons to 20 MeV and, separately, the International Linear Collider (ILC) style 8-cavity cryomodule has achieved the ILC performance milestone of 31.5 MV/m per cavity. When fully completed, the accelerator will consist of a photoinjector, one ILC-type cryomodule, multiple accelerator R&D beamlines, and a downstream beamline to inject 300 MeV electrons into the Integrable Optics Test Accelerator (IOTA). We report on the results of first beam, the achievement of our cryomodule to ILC gradient specifications, and near-term future plans for the facility.

43 PARTICLE ACCELERATORS↗

Generation High-Charge of Flat Beams at the Argonne Wakefield Accelerator

Beams with large transverse emittance ratios (flat beams) have received renewed interest for their possible applications in future linear colliders and advanced accelerators. A flat beam can be produced by generating a magnetized beam and then repartitioning its emittance using three skew quadrupoles. In this paper, we report on the experimental generation of ~1nC flat beams at the Argonne WakefieldAccelerator (AWA). The emittance ratio of the flat beam is demonstrated to be continuously variable by adjusting the magnetic field on the cathode.

43 PARTICLE ACCELERATORS↗

Study of Conduction-Cooled Superconducting Quadrupole Magnets Combined with Dipole Correctors for the ILC Main Linac

A superconducting rf (SRF) cryomodule for International Linear Collider(ILC) Main Linac equips focus/steering magnets. The magnets are "superferric" magnets with four superconducting (SC) race track coils conductively cooled from the cryomodule LHe supply pipe. The quadrupole field gradient and dipole field are 40 T/m and 0.1 T, respectively. The magnet length and iron-pole radius are 1 m and 0.045 m, respectively. It is known that dark current is generated at SRF cavities and accelerated through the following linac string. The dark current reaches and heats the SC magnets. It is estimated that the power deposition in the magnet may reach more than a few watts and temperature of the SC coils may locally reach to critical temperature of NbTi. It is important to make the magnet not reach quench with sufficient conduction cooling. We aim to realize the SC magnet which can stably operate under such condition. We plan to develop test coils made of three types of SC materials, NbTi, Nb₃Sn, and MgB₂ and study thermal characteristics and stability . We will develop a short model magnet, based on the test coil results. Here, we will present the magnet design study and the R&D plan.

43 PARTICLE ACCELERATORS↗

CHARACTERIZATION OF RADIATION DAMAGES TO POSITRON SOURCE MATERIALS

The secondary beam production target at future positron sources at the Continuous Electron Beam Accelerator Facility (CEBAF), the International Linear Collider (ILC) or the Future Circular Collider (FCC), features unprecedented mechanical and thermal stresses which may compromise sustainable and reliable operation. Candidate materials are required to possess high melting temperature together with excellent thermal conductivity, elasticity and radiation hardness properties. In order to substantiate the material choice for the CEBAF and ILC positron sources, the response of candidate materials such as titanium alloys, tungsten, and tantalum to electron beam irradiation was experimentally investigated. CEBAF and ILC expected operating conditions were mimicked using the 3.5 MeV electron beam of the MAMI facility injector. The material degradations were precisely analyzed via high energy X-ray diffraction at the HEMS beamline operated by the Helmholtz-Zentrum Hereon at the PETRA III synchrotron facility. This work reports the results of these measurements and their interpretation.

Lengler, T.↗

Status Of the ILC Main Linac Design

International Linear collider (ILC) is a proposed accelerator facility which is primarily based on two 11-km long superconducting main linacs. In this paper we present recent updates on the main linac design and discuss changes made in order to meet specification outlined in the technical design report (TDR).

43 PARTICLE ACCELERATORS↗

Transverse Stability in an Alternating Symmetry Planar Dielectric Wakefield Structure

Dielectric Wakefield Acceleration (DWA) is a promising technique for realizing the next generation of linear colliders. It provides access to significantly higher accelerating gradients than traditional radio-frequency cavities. One impediment to realizing a DWA-powered accelerator is the issue of the transverse stability of the beams within the dielectric structure due to short-range wakefields. These short-range wakefields have a tendency to induce a phenomenon known as single-bunch beam breakup, which acts as its name implies and destroys the relevant beam. We attempt to solve this issue by leveraging the quadrupole mode excited in a planar dielectric structure and then alternating the orientation of said structure to turn an unstable system into a stable one. We examine this issue computationally to determine the limits of stability and based on those simulations describe a future experimental realization of this strategy.

43 PARTICLE ACCELERATORS↗

SEM Grid Testing at NLCTA in BeamNetUS Program

We report on the performance of a secondary electron monitor (SEM) grid used to measure the transverse profile of an MeV range electron beam at SLAC National Accelerator Laboratory’s Next Linear Collider Test Accelerator (NLCTA) facility. When inserted into the path of the electron beam, secondary electron emission results in a measurable current on the wires that make up the grid. We present measurements using this technique to reconstruct the beam profile. The SEM grid was designed and manufactured by a team of undergraduate students at Harvey Mudd College (HMC) and was tested at SLAC’s NLCTA facility in collaboration with NCLTA staff as part of the BeamNetUS program. Developed for real-time diagnostics of MeV-range electron beams, this SEM grid has potential applications in both industrial and medical contexts.

43 PARTICLE ACCELERATORS↗

Crab Cavities for ILC

For the 14 mrad crossing angle proposed, crab cavity systems are fundamentally anticipated for the viable operation of the International Linear Collider (ILC), in order to maximise its luminosity performance. Since 2021, a specialist development team have been defining optimum crab cavity technologies which can fulfil the operational requirements for ILC, both for its baseline centre-of-mass energy of 250 GeV, but also extending those requirements out to higher beam collision intensities. Five design teams have established crab cavity technology solutions, which have the capability to also operate up to 1 TeV centre-of-mass. This presentation showcases the key performance capabilities of these designs and their associated benefits for both manufacture and integration into the ILC Interaction Region. The recommended outcome of the recently conducted crab cavity technology down-selection, will also be highlighted.

43 PARTICLE ACCELERATORS↗

Pair production of charged IDM scalars at high energy CLIC

The Compact Linear Collider (CLIC) was proposed as the next energy-frontier infrastructure at CERN, to study e ^+ + e ^- − collisions at three centre-of-mass energy stages: 380,GeV, 1.5,TeV and 3,TeV. The main goal of its high-energy stages is to search for the new physics beyond the Standard Model (SM). The Inert Doublet Model (IDM) is one of the simplest SM extensions and introduces four new scalar particles: H ^\pm ± , A and H; the lightest, H, is stable and hence a natural dark matter (DM) candidate. A set of benchmark points is considered, which are consistent with current theoretical and experimental constraints and promise detectable signals at future colliders. Prospects for observing pair-production of the IDM scalars at CLIC were previously studied using signatures with two leptons in the final state. In the current study, discovery reach for the IDM charged scalar pair-production is considered for the semi-leptonic final state at the two high-energy CLIC stages. Full simulation analysis, based on the current CLIC detector model, is presented for five selected IDM scenarios. Results are then extended to the larger set of benchmarks using the Delphes fast simulation framework. The CLIC detector model for Delphes has been modified to take pile-up contribution from the beam-induced \gamma\gamma γ γ interactions into account, which is crucial for the presented analysis. Results of the study indicate that heavy, charged IDM scalars can be discovered at CLIC for most of the proposed benchmark scenarios, with very high statistical significance.

Klamka, Jan↗

Beam Pipe HOM Absorber for 750 MHz RF Cavity Systems

This joint project of Muons, Inc., Cornell University and SLAC was supported by a Phase I and Phase II grant monitored by the SBIR Office of Science of the DOE. Beam line HOM absorbers are a critical part of future linear colliders. The use of lossy materials at cryogenic temperatures has been incorporated in several systems. The design in beam pipes requires cylinders of lossy material mechanically confined in such a way as to absorb the microwave energy from the higher-order modes and remove the heat generated in the lossy material. Furthermore, the potential for charge build-up on the surface of the lossy material requires the conductivity of the material to remain consistent from room temperature to cryogenic temperatures. In this program a mechanical design was developed that solved several design constraints: a) fitting into the existing Cornell load vacuum component, b) allowing the use of different material compositions, c) a thermal design that relied upon the compression of the lossy ceramic material without adding stress. Coating experiments were performed that indicated the design constraints needed to fully implement this approach for solving the charge build-up problem inherent in using lossy ceramics. In addition, the ACE3P program, used to calculate the performance of lossy cylinders in beam pipes in general, was supported by this project. Code development and documentation to allow for the more wide spread use of the program was a direct result of this project was well.

43 PARTICLE ACCELERATORS↗

Development of Interconnect Technologies for Particle Detectors

This final report covers the three years of this grant, for the funding period 9/1/2010 - 8/31/2013. The project consisted of generic detector R&D work at UC Davis, with an emphasis on developing interconnect technologies for applications in HEP. Much of the work is done at our Facility for Interconnect Technologies (FIT) at UC Davis. FIT was established using ARRA funds, with further studies supported by this grant. Besides generic R&D work at UC Davis, FIT is engaged in providing bump bonding help to several DOE supported detector R&D efforts. Some of the developmental work was also supported by funding from other sources: continuing CMS project funds and the Linear Collider R&D funds. The latter program is now terminated. The three year program saw a good deal of progress on several fronts, which are reported here.

43 PARTICLE ACCELERATORS↗

Research in Elementary Particle Physics

This report details the accomplishments and research results for the High Energy Physics Group at the University of Texas at Arlington at the Energy and Intensity Frontiers. For the Energy Frontier we have made fundamental contributions in the search for supersymmetric particles, proposed to explain the stabilization of the mass of the Higgs Boson – the agent giving mass to all known particles. We have also made major contributions to the search for additional Higgs Bosons and to the planning for future searches. This work has been carried out in the context of the ATLAS Experiment at CERN (European Nuclear Research Laboratory) and for which we have made major contributions to computing and data distribution and processing, and have worked to calibrate the detector and prepare upgraded electronics for the future. Our other contribution to the Energy Frontier has been to the International Linear Collider (ILC) project, potentially hosted by Japan, and to the Silicon Detector Concept (SiD) in particular. We have lead the development of the SiD Concept and have worked on a new form of precise energy measurement for particles from the high energy collisions of electrons and positrons at the ILC. For the Intensity Frontier, we have worked to develop the concept of Long Baseline Neutrino Experiment(s) (LBNE) at the Fermi National Accelerator Laboratory. Our contributions to detector development, neutrino beam studies, particle identification, software development will facilitate future studies of the oscillation of one type of neutrino into other type(s), establish the order of the neutrino masses, and, through an innovative new idea, allow us to create a beam of dark matter particles.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ILC Operating Scenarios: ILC Parameters Joint Working Group

The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

43 PARTICLE ACCELERATORS↗

CLIC Drive Beam Gun

The Compact Linear Collider (CLIC) is a proposed future electron-positron collider, designed to perform collisions at energies from 0.5 to 5 TeV, with a nominal design optimized for 3 TeV (Dannheim, 2012). CLIC generates three beams: the drive beam, the main electron beam and the positron beam. The drive beam is a high current electron beam that is accelerated in an S-band linac and then decelerated in 12 GHz structures to generate the RF for accelerating the colliding main electron and positron beams. The drive beam employs a high current thermionic DC electron gun. This report explores the optimal anode – cathode geometry as well as analyzes the mechanical and electrical integrity of the gun structure designed by CERN.

43 PARTICLE ACCELERATORS↗

A hybrid approach for generating ultra-short bunches for advanced accelerator applications

Generation of electron beams with high phase-space density, short bunch length and high peak current is an essential requirement for future linear colliders and bright electron beam sources. Unfortunately, such bunches cannot be produced directly from the source since forces from the mutual repulsion of electrons would destroy the brilliance of the beam within a short distance. Here, we detail a beam dynamics study of an innovative two-stage compression scheme that can generate ultra-short bunches without degrading the beam quality. In the first stage, the beam is compressed with an advanced velocity bunching technique in which the longitudinal phase space is rotated so that electrons on the bunch tail become faster than electrons in the bunch head. In the second stage, the beam is further compressed with a conventional magnetic chicane. With the aid of numerical simulations we show that our two-staged scheme is capable to increase the current of a 50 pC bunch to a notable factor of 100 while the emittance growth can be suppressed to 1% with appropriate tailoring of the initial beam distribution.

43 PARTICLE ACCELERATORS↗

Conceptual Design for CLIC Gun Pulser

The Compact Linear Collider (CLIC) is a proposed future electron-positron collider, designed to perform collisions at energies from 0.5 to 5 TeV, with a nominal design optimized for 3 TeV (Dannheim, 2012). The Drive Beam Accelerator consists of a thermionic DC gun, bunching section and an accelerating section. The thermionic gun needs deliver a long (~143us) pulse of current into the buncher. A pulser is needed to drive grid of the gun to generate a stable current output. This report explores the requirements of the gun pulser and potential solutions to regulate grid current.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Staging For Wakefield Acceleration Experiment Hardware Development: Fast Kicker and High Power RF Delay Section

This project pursues demonstration of the complete staging of high gradient wakefield acceleration at Argonne Wakefield Accelerator (AWA) facility, which is well aligned with the core mission of AWA and the roadmap laid out for the dielectric wakefield accelerator technology toward future linear colliders. During the project, we have successfully demonstrated the feasibility of the staged short pulse TBA (C. Jing, et al, Nucl. Instrum. Meth. A., 898, 72-76, 2018). We have successfully performed the first over 100MW dielectric power extractor. As the last task, one of the key elements for the drive beam distribution system, the fast kicker, has been built and successfully demonstrated this year too. The staging technology demonstrated in this project is crucial for the 500MeV Demonstrator that is planned at AWA in the next five years. The plan is to use two staged meter long dielectric disk accelerators to achieve 500MeV energy gain within ~10 meter long experimental space. While this SBIR project is closed, we plan to continue to investigate the dielectric accelerator technologies under Euclid's general scientific and commercial interests.

43 PARTICLE ACCELERATORS↗