Preliminary measurements of take-off and landing noise from a new instrumented range
NASA noise-survey instrumentation system - data from F-104, XB-70, and 707-131B aircraft
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
NASA noise-survey instrumentation system - data from F-104, XB-70, and 707-131B aircraft
Status report on sonic-boom phenomena - flight test data, and discussion of effect upon community
Operational practices and load experiences of general aviation aircraft
Space radiation effects on Apollo mission - operational procedures for dose reduction
Gemini program including system and component description, orbital and rendezvous problems, extravehicular operations and controlled reentry
In-orbit operational aspects of Relay I satellite and requirements for satellite command and for real time telemetry data reduction
Operational aspects of proposed lunar surface exploration activities reviewed by astronaut in training
Decision theory application to GEOS A spacecraft operational reliability assessment
Initial value problem solutions to radial heat problem with Laplace operator and singular data
Rankine cycle technology programs noting use of stainless steel bimetallic systems, boiler and condenser problems, turbine operation, etc
Preliminary spacecraft concept for real time operational space environment monitoring system
The Gemini Program was conceived to provide a space system that could furnish answers to many of the problems in operating manned vehicles in space. It was designed to build upon the experience gained from Project Mercury, and to extend and expand this fund of experience in support of the manned lunar landing program and other future manned space-flight programs. The purpose of this paper is to relate some of the results of the Gemini Program to the Apollo Program, and to discuss some of the contributions which have been made. The objectives of the Gemini Program applicable to Apollo are : (1) long-duration flight, (2) rendezvous and docking, (3) post-docking maneuver capability, (4) controlled reentry and landing, (5) flight- and groundcrew proficiency, and (6) extra vehicular capability. The achievement of these objectives has provided operational experience and confirmed much of the technology which will be utilized in future manned programs. These contributions will be discussed in three major areas : launch and flight operations, flight-crew operations and training, and technological development of subsystems and components. While there is obvious interrelation among the three elements, the grouping affords emphasis and order to the discussion.
Atmospheric elements and properties pertinent to design and operations of Space Shuttle
NASA past and future space programs, examining operations analysis problems associated with space missions planning
Redundant data management system solves problem of operating redundant equipment in real time environment where failures are detected, isolated, and switched in simple manner. System consists of quadruply-redundant computer, input/output control units, and data buses. System inherently contains failure detection, isolation, and switching function.
The general features of the GENET system for simulating networks are described. A set of features is presented which are desirable for network simulations and which are expected to be achieved by this system. Among these features are: (1) two level network modeling; and (2) problem oriented operations. Several typical network systems are modeled in GENET framework to illustrate various of the features and to show its applicability.
The analytical comparison of the two candidate Rotor Systems Research Aircraft (RSRA) configurations selected by the Government at the completion of Part 1 of the RSRA Conceptual Predesign Study is presented. The purpose of the comparison was to determine the relative suitability of both vehicles for the RSRA missions described in the Government Statement of Work, and to assess their versatility in the testing of new rotor concepts. The analytical comparison was performed primarily with regard to performance and stability and control. A weights, center-of-gravity, and inertia computation was performed for each iteration in the analysis process. The dynamics investigation was not concerned so much with a comparison of the two vehicles, but explored the dynamic problems attending operation of any RSRA operating with large rotor RPM and diameter ranges over large forward speed ranges. Several means of isolating in- and out-of-plane rotor vibrations were analyzed. An optimum isolation scheme was selected.
The services of mental specialists, such as psychologists, psychiatrists, or psychiatric social workers are required to assure maximum human performance in Government facilities. Contemporary mental health programming covers emotionally generated problems at operational sites to complete disclaiming of the existence of such difficulties among workers. Frequent taking of sick leave or annual leave when work seems demanding or when a promotion does not materialize, chronic or repeated tardiness, requests for frequent transfers, work over-loading, accidental injuries, and alcoholism are all forms of stress responses and indicate a need for emotional counselling.