Search NASA⌕ Search

SEARCH · Search NASA

Results for “SERVICE MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Modulation and coding used by a major satellite communications company

Hughes Communications Inc., is a major satellite communications company providing or planning to provide the full spectrum of services available on satellites. All of the current services use conventional modulation and coding techniques that were well known a decade or longer ago. However, the future mobile satellite service will use significantly more advanced techniques. JPL, under NASA sponsorship, has pioneered many of the techniques that will be used.

Renshaw, K. H.↗

The git based ATLAS data acquisition configuration service in LHC Run 3

The ATLAS experiment at the LHC at CERN uses a large, distributed trigger and data acquisition system composed of many computing nodes, networks, and hardware modules. Its configuration service is used to provide descriptions of control, monitoring, diagnostic, recovery, dataflow and data quality configurations, interconnections, and parameters for modules, chips, and channels of various online systems, detectors, and the whole ATLAS experiment. Those descriptions have historically been stored in more than one thousand interconnected XML files, which are updated by various experts many times per day. Maintaining error-free and consistent sets of such files and providing reliable and fast access to current and historical configurations is a major challenge. This paper gives details of the configuration service upgrade on the modern Git version control system backend for LHC Run 3 and its exploitation experience. It may be interesting for developers using human-readable file formats, where consistency of the files, performance, access control, traceability of modifications, and effective archiving are key requirements.

Soloviev, Igor [Univ. of California, Irvine, CA (U↗

Testing for Solar-Array Hotspots

Laboratory procedure developed for evaluting hot-spot endurance of photovoltaic modules under field-service conditions. Procedures used for qualification testing of modules.

Gonzalez, C. C.↗

Repairing a communications satellite on orbit

A review of past failures indicates that module exchange can satisfy most repair requirements of communications satellites. Emphasis is placed on the design of a serviceable communications satellites with 20 modules, on the development of an on-orbit servicer designed to remove failed modules from a body-stabilized spacecraft and to replace them with good modules, and on servicing operations. Benefits of servicing or repair include increased satellite availability, increased reliability, decreased life cycle costs, replacement of worn-out items, installation of updated equipment, and correction of design failures. The use of servicing instead of replacement could result in cost savings in excess of 40 percent. Significant savings are possible when the lifetime of a program is long relative to the satellite lifetime.

Gordon, G. D.↗

Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

Woodcock, G. R.↗

Space construction base support requirements for environmental control and life support systems

A Space Station analysis study is being performed for NASA which identifies cost-effective Space Station options that can provide a space facility capable of performing space construction, space manufacturing, cosmological research, earth services, and other functions. A space construction base concept for the construction of large structures, such as those needed to implement satellite solar power for earth usage, will be used as a basis for discussing requirements that impact the design selection, level of integration, and operation of environmental control and life support systems (ECLSS). The space construction base configuration also provides a basic Space Station facility that can accommodate biological manufacturing modules, ultrapure glasses manufacturing modules, and modules for other services in a building-block fashion. Examples of special problems that could dictate hardware required to augment the basic ECLSS for autonomous modules will be highlighted. Additionally, overall intravehicular (IVA) and extravehicular (EVA) activities and requirements that could impact the basic station ECLSS degree of closure are discussed.

Thiele, R. J.↗

The Manufacturing Process for the NASA Composite Crew Module Demonstration Structure

This paper will describe the approaches and methods selected in fabrication of a carbon composite demonstration structure for the Composite Crew Module (CCM) Program. The program is managed by the NASA Safety and Engineering Center with participants from ten NASA Centers and AFRL. Multiple aerospace contractors are participating in the design development, tooling and fabrication effort as well. The goal of the program is to develop an agency wide design team for composite habitable spacecraft. The specific goals for this development project are: a).To gain hands on experience in design, building and testing a composite crew module. b) To validate key assumptions by resolving composite spacecraft design details through fabrication and testing of hardware. This abstract is based on Preliminary Design data..The final design will continue to evolve through the fall of 2007 with fabrication mostly completed by conference date. From a structures perspective, the.CCM can be viewed as a pressure module with variable pressure time histories and a series of both impact and quasi-static, high intensity point, line, and area distributed loads. The portion of the overall space vehicle being designed and. fabricated by the CCM team is just the pressure module and primary loading points. The heaviest point loads are applied and distributed to the pressure module at.an aluminum Service Module/Alternate Launch Abort System (SM/ALAS) fittings and at Main and Drogue Chute fittings. Significant line loads with metal to metal impact is applied at.the Lids ring. These major external point and line loads as well as pressure impact loads (blast and water landing) are applied to the lobed floor though the reentry shield and crushable materials. The pressure module is divided into upper and lower. shells that mate together with a bonded belly band splice joint to create the completed structural assembly. The benefits of a split CCM far outweigh the risks of a joint. These benefits include lower tooling cost and less manufacturing risk. Assembly of the top and bottom halves of the pressure shell will allow access to the interior of the shell throughout remaining fabrication sequence and can also potentially permit extensive installation of equipment and .crew facilities prior to final assembly of the two shell halves. A Pi pre-form is a woven carbon composite material which is provided in pre-impregnated form and frozen for long term storage. The cross-section shape allows the top of the pi to be bonded to a flat or curved surface with a second flat plate composite section bonded between two upstanding legs of the Pi. One of the regions relying on the merits of the Pi pre-form is the backbone. All connections among plates of the backbone structure, including the upper flanges, and to the lobe base of the pressure shell are currently joined by Pi pre-forms. The intersection of backbone composite plates is formed by application of two Pi pre-forms, top flanges and lobed surfaces are bonded with one Pi pre-form. The process of applying the pre-impregnated pi-preform will be demonstrated to include important steps like surface preparation, forming, application of pressure dams, vacuum bagging for consolidation, and curing techniques. Chopped carbon fiber tooling was selected over other traditional metallic and carbon fiber tooling. The requirement of schedule and cost economy for a moderate reuse cure tool warranted composite tooling options. Composite tooling schedule duration of 18 weeks compared favorably against other metallic tooling including invar tooling. Composite tooling also shows significant cost savings over low CTE metallic options. The composite tooling options were divided into two groups and the final decision was based on the cost, schedule, tolerance, temperature, and reuse requirements.

Pelham, Larry↗

Spacecraft servicing demonstration plan

A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.

Bergonz, F. H.↗

Apollo spacecraft.

Apollo spacecraft hardware, command, service and lunar modules, discussing design factors and tests contributing to spacecraft reliability

Low, G. M.↗

S-band transponder experiment

Apollo 14 command service and lunar module orbital velocity data from radio navigation S-band transponder experiment for lunar gravitation effects

Gottlieb, P.↗

Application of DOT-MORSE coupling to the analysis of three-dimensional SNAP shielding problems

The use of discrete ordinates and Monte Carlo techniques to solve radiation transport problems is discussed. A general discussion of two possible coupling schemes is given for the two methods. The calculation of the reactor radiation scattered from a docked service and command module is used as an example of coupling discrete ordinates (DOT) and Monte Carlo (MORSE) calculations.

Straker, E. A.↗

Roles of the ground and flight crew in Apollo operations.

The functions performed by ground personnel and flight crews of Apollo missions are reviewed, covering vehicle systems operation and management, Saturn launch vehicle, command-service and lunar modules, lunar rover, communication relay unit and ground-commanded TV assembly. Details of the flight path, scientific experiments, photographic equipment and crew health monitoring are also discussed in terms of these functions. The coordinated combination of large numbers of experts and data processing equipment on the ground with the crew's capabilities to operate the spacecraft and exercise on-the-spot judgements is viewed as the backbone of the successful fulfillment of Apollo missions.

Wolfer, B. M.↗

NASA to launch second business communications satellite

The two stage Delta 3910 launch vehicle was chosen to place the second small business satellite (SBS-B) into a transfer orbit with an apogee of 36,619 kilometers and a perigee of 167 km, at an inclination of 27.7 degrees to Earth's equator. The firing and separation sequence and the inertial guidance system are described as well as the payload assist module. Facilities and services for tracking and control by NASA, COMSAT, Intelsat, and SBS are outlined and prelaunch operations are summarized.

Source record↗

SEPAC flight software detailed design specifications, volume 1

The detailed design specifications (as built) for the SEPAC Flight Software are defined. The design includes a description of the total software system and of each individual module within the system. The design specifications describe the decomposition of the software system into its major components. The system structure is expressed in the following forms: the control-flow hierarchy of the system, the data-flow structure of the system, the task hierarchy, the memory structure, and the software to hardware configuration mapping. The component design description includes details on the following elements: register conventions, module (subroutines) invocaton, module functions, interrupt servicing, data definitions, and database structure.

Source record↗

Need, utilization, and configuration of a large, multi-G centrifuge on the Space Station

A large, multi-g centrifuge is required on the Space Station (1) to provide valid 1-g controls for the study of zero-g effects on animals and plants and to study readaptation to 1 g; (2) to store animals at 1 g prior to short-term zero-g experimentation; (3) to permit g-level threshold studies of gravity effects. These requirements can be met by a 13-ft-diam., center-mounted centrifuge, on which up to 48 modular habitats with animals (squirrel monkey, rat, mouse) and plants are attached. The advantages of locating this centrifuge with the vivarium, a common environmental control and life support system, a general-purpose work station and storage of food, water, and supplies in an attached short module, are elaborated. Servicing and operation of the centrifuge, as well as minimizing its impact on other Space Station functions are also considered.

Bonting, Sjoerd L.↗

Addendum to the User Manual for NASGRO Elastic-Plastic Fracture Mechanics Software Module

The elastic-plastic fracture mechanics modules in NASGRO have been enhanced by the addition of of the following: new J-integral solutions based on the reference stress method and finite element solutions; the extension of the critical crack and critical load modules for cracks with two degrees of freedom that tear and failure by ductile instability; the addition of a proof test analysis module that includes safe life analysis, calculates proof loads, and determines the flaw screening 1 capability for a given proof load; the addition of a tear-fatigue module for ductile materials that simultaneously tear and extend by fatigue; and a multiple cycle proof test module for estimating service reliability following a proof test.

Gregg, M. Wayne↗