Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Development of a Cryogenic Thermal Distortion Measurement Facility for Testing the James Webb Space Telescope Instrument Support Integration Module 2-D Test Assemblies

The James Webb Space Telescope Instrument Support Integration Module (ISIM) is being designed and developed at the Goddard Space Flight Center. The ISM Thermal Distortion Testing (ITDT) program was started with the primary objective to validate the ISM mechanical design process. The ITDT effort seeks to establish confidence and demonstrate the ability to predict thermal distortion in composite structures at cryogenic temperatures using solid element models. This-program's goal is to better ensure that ISIM meets all the mechanical and structural requirements by using test results to verify or improve structural modeling techniques. The first step to accomplish the ITDT objectives was to design, and then construct solid element models of a series 2-D test assemblies that represent critical building blocks of the ISIM structure. Second, the actual test assemblies consisting of composite tubes and invar end fittings were fabricated and tested for thermal distortion. This paper presents the development of the GSFC Cryo Distortion Measurement Facility (CDMF) to meet the requirements of the ISIM 2-D test. assemblies, and other future ISIM testing needs. The CDMF provides efficient cooling with both a single, and two-stage cryo-cooler. Temperature uniformity of the test assemblies during thermal transients and at steady state is accomplished by using sapphire windows for all of the optical ports on the radiation shields and by using .thermal straps to cool the test assemblies. Numerical thermal models of the test assemblies were used to predict the temperature uniformity of the parts during cooldown and at steady state. Results of these models are compared to actual temperature data from the tests. Temperature sensors with a 0.25K precision were used to insure that test assembly gradients did not exceed 2K lateral, and 4K axially. The thermal distortions of two assemblies were measured during six thermal cycles from 320K to 35K using laser interferometers. The standard deviation for all of the distortion measurements is less than 0.5 microns, which falls within the ISIM requirement of 3 microns.

Miller, Franklin↗

Capability 9.3 Assembly and Deployment

Large space systems are required for a range of operational, commercial and scientific missions objectives however, current launch vehicle capacities substantially limit the size of space systems (on-orbit or planetary). Assembly and Deployment is the process of constructing a spacecraft or system from modules which may in turn have been constructed from sub-modules in a hierarchical fashion. In-situ assembly of space exploration vehicles and systems will require a broad range of operational capabilities, including: Component transfer and storage, fluid handling, construction and assembly, test and verification. Efficient execution of these functions will require supporting infrastructure, that can: Receive, store and protect (materials, components, etc.); hold and secure; position, align and control; deploy; connect/disconnect; construct; join; assemble/disassemble; dock/undock; and mate/demate.

Dorsey, John↗

Using the International Space Station (ISS) Oxygen Generation Assembly (OGA) Is Not Feasible for Mars Transit

A review of two papers on improving the International Space Station (ISS) Oxygen Generation Assembly (OGA) shows that it would not save substantial mass on a Mars transit. The ISS OGA requires redesign for satisfactory operation, even for the ISS. The planned improvements of the OGA for ISS would not be sufficient to make it suitable for Mars, because Mars transit life support has significantly different requirements than ISS. The OGA for Mars should have lower mass, better reliability and maintainability, greater safety, radiation hardening, and capability for quiescent operation. NASA's methodical, disciplined systems engineering process should be used to develop the appropriate system.

Space station↗

Emergency egress requirements for caution and warning, logistics, maintenance, and assembly stage MB-6 of Space Station Freedom

The safety and survival of the crewmembers has been the prime concern of NASA. Previous studies have been conducted mainly for emergencies occurring during the operating mode of the fully assembled Station. The present study was conducted to evaluate the emergency requirements for the caution and warning, logistics, maintenance, and assembly stage MB-6 of the Station in space. Effective caution and warning is essential to achieve safe egress in emergencies. In order to survive a long period in space, the safety and emergency requirements for maintenance, logistics, and extravehicular assembly operation in space must be met.

Ray, Paul S.↗

Maneuverable Automated Tethered Space Tug Simulator

This TIP will develop autonomous capabilities for the space tugs in the Flat Floor Robotics Laboratory (FFRL) for use in support of In-Space Servicing, Assembly, and Manufacturing (ISAM) and future vehicles in the FFRL. The space tugs would be housed on larger spacecraft, such as ISS or Gateway, and deployed for various ISAM activities. When these activities are complete, the space tug can be reeled back to its host spacecraft.

Flat Floor Robotics Lab↗

Design of a resistojet for Space Station Freedom

In the mid 1990's, NASA will begin assembly of Space Station Freedom, a permanent outpost in a low-earth orbit. For the station to remain in that orbit, an altitude control system must be developed to resist the effects of atmospheric drag. One system being considered by NASA is called a resistojet, and it uses highly pressurized waste gases heated by electrical resistance to provide thrust on the order of 1 Newton. An additional function of the resistojet is to vent waste gases used by the station and its inhabitants. This report focuses on resolving the issues of system performance, flow and heater control, and materials selection and designing test procedures to resolve, by experimentation, any remaining issues. The conceptual model of the resistojet consists of a shell wrapped by a resistive coil with gases flowing internally through the tube with additional components such as regulators, transducers, and thermocouples. For system performance, the major parameters were calculated from the desired thrust range, the pressure within the resistojet and the cold flow mode of operation; waste gases were analyzed at 100 percent capacity and between 58.95 kPa and 552 kPa. The design team found that any ventilation under all conditions would produce thrust, and therefore, it was decided to limit the design of the ventilation function. The design team proceeded with a simplified model to determine the nozzle throat diameter and chamber diameter.

Garza, Jose↗

Systems, methods, and compositions for purifying water

Systems for removing one or more contaminants from water are provided that can include a hydrate formation chamber assembly; a contaminated water diffusion assembly within the hydrate formation chamber assembly; a space between a wall of the hydrate formation chamber assembly and the diffusion assembly; and a guest compound conduit configured to provide a guest compound within the space and form a hydrate comprising water and the guest compound. Methods for removing one or more contaminants from water are provided that can include providing a contaminated water mixture and one or more guest compounds; forming a hydrate complex comprising water and the one or more guest compounds; and separating the water from the guest compounds to provide water with less contaminant. Mixtures are also provided that can include a liquid component comprising water and at least one contaminant, and a solid component comprising a hydrate complex. One embodiment of the system provides methods for production of excess electric power as a byproduct of the desalination process.

McGrail, Bernard P.↗

LANDO: Developing Autonomous Payload Offloading Capabilities for Lunar Surface Operations

Introduction: The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative selected for funding by NASA Space Technology Mission Directorate. LANDO is developing a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that will be validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface [Fig. 1], sized for a Commercial Lunar Pay-load Services (CLPS) mission). The autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous excavation and construction operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the In-Space Servicing, Assembly and Manufacturing national strategy. LSMS: The LSMS is a tension actuated robotic agent that is scalable (reach and lifting capacity in different gravity environments), versatile (types of surface operations), and reusable. Compared to serial arms, the LSMS provides significantly higher structural efficiency and mechanical advantage, enabling a greater payload lift capacity at a lower system mass. The LSMS is envisioned to be a crucial part of the excavation and construction portfolio, capable of supporting a variety of activities on the lunar surface. Autonomous payload handling is one of the first activities the LSMS can support that develops capabilities that are extensible to other surface operations. Payload handling is required to: remove payloads from a lander; place payloads on mobile agents for transport from a lander to construction site/assembly point; emplace payloads in their operational configuration, and aggregate components to create an asset. As an example of this critical gap, manifested CLPS missions do not currently have a ubiquitous payload offloading capability; payloads (excluding rovers) are designed to remain on the lander. Why Autonomy? Autonomous robotic systems capable of carrying out excavation and construction operations are a fundamental and critical capability required for realizing the NASA Artemis program vision to “emplace and build the infrastructure, systems, and robotic missions that can enable a sustained lunar surface presence.” While teleoperation is still feasible for lunar surface operations, increased latency at Mars will require validated supervised autonomous technologies capable of operating with minimal human involvement (human-on-the-loop) unless an unexpected event occurs requiring human intervention. Autonomy reduces operator burden, allows operations to continue during uncrewed periods, in-creases the safety of operations by automatically detecting and handling faults, and allows operating in high latency environments. Development Activities: LANDO is extending critical autonomous operations to the manipulation domain and creating an integrated system, based on reusable software modules, that is capable of planning and executing payload handling and autonomous surface operations without requiring hu-man intervention beyond a supervisory role. The priority features under development are 1) autonomously offload payloads from a tilted lander deck without buckling the LSMS; 2) sensing whether a payload is safe to lift and handle; and 3) integrate with Astrobotic’s CLPS lander. The poster presentation will highlight current development activities over the past year on LSMS-L35 prototype hard-ware design, and autonomy software.

in-space assembly↗

Advanced space engine powerhead breadboard assembly system study

The objective of this study was to establish a preliminary design of a Powerhead Breadboard Assembly (PBA) for an 88 964-Newton (20,000-pound) thrust oxygen/hydrogen staged combustion cycle engine for use in orbital transfer vehicle propulsion. Existing turbopump, preburner, and thrust chamber components were integrated with interconnecting ducting, a heat exchanger, and a control system to complete the PBA design. Cycle studies were conducted to define starting transients and steady-state balances for the completed design. Specifications were developed for all valve applications and the conditions required for the control system integration with the facility for system test were defined.

Campbell, R. G.↗

Onsite Fabrication of Trusses and Structures

Tribeam truss that is strong and light made at site where used. Reinforced plastic members are fabricated by beam-making machine and assembled by assembly and welding machines. Although proposed for space-platform assembly, concept may be useful in terrestrial applications in remote or inaccessible places.

Bodle, J. G.↗

Structural latches for modular assembly of spacecraft and space mechanisms

Latching techniques are changing from early approaches due to the advent of berthing technology. Latch selection for a given interface may be conducted by evaluating candidate capabilities which meet functional interface requirements. A judgment criteria system is presented along with an example of its use in choosing the Rollerscrew Structural Latch (RSL) for the NASA Flat Plate Interface Prototype (FPIP). Details are given on Rollerscrew operation, design, and development difficulties. A test plan is also outlined for the RSL and FPIP.

Mccown, William↗

Robotics program at the NASA Goddard Space Flight Center

The NASA Goddard telerobotic program is structured to increase the scope and efficiency of what man can accomplish in space through the use of robotics. The main focus is to service Space Station Freedom and its payloads, but robotic assembly of Space Station Freedom and platforms is also anticipated. The approach being taken to achieve this by telerobotics, where manipulators can be controlled by human operators or computer programs. The Goddard Space Flight Center (GSFC) has the responsability to develop the Flight Telerobotic Servicer (FTS) for Space Station Freedom. The current plan at GSFC in support of telerobotics for Space Station Freedom and the in-orbit servicing of platforms are reviewed. Plans for ground demonstrations involving the use of an engineering test bed and an operational facility are discussed.

Ollendorf, Stanford↗

Program Helps To Optimize Assembly Sequences

FAST project-management software tool designed to optimize sequence of assembly of Space Station Freedom. Assesses effects of detailed changes upon system and produces output metrics identifying preferred assembly sequences. Incorporates Space-Shuttle integration, Space-Station hardware, on-orbit operations, and governing programmatic considerations as either precedence relations or numerical data. Written in C language.

Borden, Chester S.↗

On-orbit assembly operations and in-space infrastructure

The paper describes the development of a set of top-level system requirements for an in-space infrastructure which will accommodate the vehicles proposed for the Space Exploration Initiative (SEI). Issues considered include the current SEI mission strategy, the launch capability, the role of Space Station Freedom (SSF), the on-orbit assembly operations, and the manned tended versus robotic capability. Current SEI mission strategy coupled with SSF planning led to the conclusion that an independent assembly servicing facility (ASF) will best meet the requirements of the SEI program, and an analysis was performed to define the functions required at an ASF. It is shown that the ASF functions can be performed by telerobotic operations.

Cockrell, Charles E.↗

Development of Stable, Low Resistance Solder Joints for a Space-Flight HTS Lead Assemblies

The solder joints in spaceflight high temperature superconductor (HTS) lead assemblies for certain astrophysics missions have strict constraints on size and power dissipation. In addition, the joints must tolerate years of storage at room temperature, many thermal cycles, and several vibration tests between their manufacture and their final operation on orbit. As reported previously, solder joints between REBCO coated conductors and normal metal traces for the Astro-H mission showed low temperature joint resistance that grew approximately as log time over the course of months. Although the assemblies worked without issue in orbit, for the upcoming X-ray Astrophysics Recovery Mission we are attempting to improve our solder process to give lower, more stable, and more consistent joint resistance. We produce numerous sample joints and measure time- and thermal cycle-dependent resistance, and characterize the joints using x-ray and other analysis tools. For a subset of the joints, we use SEMEDS to try to understand the physical and chemical processes that effect joint behavior.

high temperature superconductivity↗

Upgrades to the International Space Station Urine Processor Assembly

The ISS Urine Processor Assembly (UPA) began operations in November 2008. Though the UPA has successfully generated distillate from crew urine, several modifications and upgrades have been implemented to improve overall system performance throughout the years. Current and future upgrades to the UPA will continue to focus on improved system performance and reliability, focusing primarily on the Distillation Assembly and upgrades to the UPA vacuum pump. Work towards a flight demonstration experiment of a vacuum pump utilizing scroll pump technologies has also continued forward. The following paper discusses progress on these various concepts, including the implementation of a more reliable drive belt, improved methods for managing condensate in the stationary bowl of the Distillation Assembly, installation of improved centrifuge bearings, implementation of a liquid level sensor, and upgrades to the UPA vacuum pump.

Williamson, Jill P.↗