Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Station Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Managing Complexity - Developing the Node Control Software For The International Space Station

On December 4th, 1998 at 3:36 AM STS-88 (the space shuttle Endeavor) was launched with the "Node 1 Unity Module" in its payload bay. After working on the Space Station program for a very long time, that launch was one of the most beautiful sights I had ever seen! As the Shuttle proceeded to rendezvous with the Russian American module know as Zarya, I returned to Houston quickly to start monitoring the activation of the software I had spent the last 3 years working on. The FGB module (also known as "Zarya"), was grappled by the shuttle robotic arm, and connected to the Unity module. Crewmembers then hooked up the power and data connections between Zarya and Unity. On December 7th, 1998 at 9:49 PM CST the Node Control Software was activated. On December 15th, 1998, the Node-l/Zarya "cornerstone" of the International Space Station was left on-orbit. The Node Control Software (NCS) is the first software flown by NASA for the International Space Station (ISS). The ISS Program is considered the most complex international engineering effort ever undertaken. At last count some 18 countries are active partners in this global venture. NCS has performed all of its intended functions on orbit, over 200 miles above us. I'll be describing how we built the NCS software.

Wood, Donald B.↗

Design Study Conducted of a Stirred and Perfused Specimen Chamber for Culturing Suspended Cells on the International Space Station

A tightly knit numerical/experimental collaboration among the NASA Ames Research Center, NASA Glenn Research Center, and Payload Systems, Inc., was formed to analyze cell culturing systems for the International Space Station. The Cell Culture Unit is a facility scheduled for deployment on the space station by the Cell Culture Unit team at Ames. The facility houses multiple cell specimen chambers (CSCs), all of which have inlets and outlets to allow for replenishment of nutrients and for waste removal. For improved uniformity of nutrient and waste concentrations, each chamber has a pair of counterrotating stir bars as well. Although the CSC can be used to grow a wide variety of organic cells, the current study uses yeast as a model cell. Previous work identified groundbased protocols for perfusion and stirring to achieve yeast growth within the CSC that is comparable to that for yeast cultures grown in a shaken Ehrlenmeyer flask.

Nelson, Emily S.↗

Winged cargo return vehicle. Volume 1: Conceptual design

The Advanced Design Project (ADP) allows an opportunity for students to work in conjunction with NASA and other aerospace companies on NASA Advanced Design Projects. The following volumes represent the design report: Volume 1 Conceptual Design; Volume 2 Wind Tunnel Tests; Volume 3 Structural Analysis; and Volume 4 Water Tunnel Tests. The project chosen by the University of Minnesota in conjunction with NASA Marshall Space Flight Center for this year is a Cargo Return Vehicle (CRV) to support the Space Station Freedom. The vehicle is the third generation of vehicles to be built by NASA, the first two being the Apollo program, and the Space Shuttle program. The CRV is to work in conjunction with a personnel launch system (PLS) to further subdivide and specialize the vehicles that NASA will operate in the year 2000. The cargo return vehicle will carry payload to and from the Space Station Freedom (SSF).

Source record↗

Foldable self-erecting joint

The invention relates to a foldable self erecting joint which may be used to deploy the tetratruss frame of the proposed shuttle launched triangular space station. The frame must be folded into the payload bay of the space shuttle orbiter. To deploy the frame the tubes are automatically unfolded and once in position should remain safely. A pair of hinged, tubular members in which the hinging is located at corresponding portions of the members are used. The opposite edge portions are connected by spring-based toggle links which in the unfolded position of the members are nested against one of the members in substantial alignment and over-center for securely locking the joint in the unfolded position.

Pelischek, T. E.↗

Programmable Thermostats for MPLM Shell Heater Control ULF1: Thermal Performances - 1

The Multi-Purpose Logistics Module (MPLM) is the primary carrier for "pressurized" logistics to and from the International Space Station (ISS). The MPLM is transported in the payload bay of the Space Shuttle and is docked to the ISS for unloading, and reloading, of contents within the ISS shirt sleeve environment. Foil heaters, controlled originally with bi-metallic thermostats, are distributed across the outside of the MPLM structure and are utilized to provide energy to the structure to avoid exposure to cold temperatures and prevent condensation. The existing bi-metallic, fixed temperature set point thermostats have been replaced with Programmable Thermostats Modules (PTMs) in the Passive Thermal Control Subsystem (PTCS) 28Vdc shell heater circuits. The goal of using the PTM thermostat is to improve operational efficiency of the MPLM on-orbit shell heaters by providing better shell temperature control via feedback control capability. Each heater circuit contains a programmable thermostat connected to an external temperature sensor, a Resistive Temperature Device (RTD), which is used to provide continuous temperature monitoring capability. Each thermostat has programmable temperature set points and control spans. The data acquisition system uses a standard RS-485 serial interface communications cable to provide digital control capability. The PTM system was designed by MSFC, relying upon ALTEC support for their integration within the MPLM system design, while KSC performed the installation and ground checkout testing of the thermostat and RS-485 communication cable on the MPLM FM1 flight module. The PTMs were used for the first time during the STS-121/ULF1.1 mission. This paper will describe the design, development and verification of the PTM system, as well as the PTM flight performance and comparisons with SINDA thermal model predictions.

Glasgow, Shaun↗

Space Station crew workload - Station operations and customer accommodations

The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

Shinkle, G. L.↗

Passive Thermal Design Approach for the Space Communications and Navigation (SCaN) Testbed Experiment on the International Space Station (ISS)

The Space Communications and Navigation (SCaN) Program Office at NASA Headquarters oversees all of NASAs space communications activities. SCaN manages and directs the ground-based facilities and services provided by the Deep Space Network (DSN), Near Earth Network (NEN), and the Space Network (SN). Through the SCaN Program Office, NASA GRC developed a Software Defined Radio (SDR) testbed experiment (SCaN testbed experiment) for use on the International Space Station (ISS). It is comprised of three different SDR radios, the Jet Propulsion Laboratory (JPL) radio, Harris Corporation radio, and the General Dynamics Corporation radio. The SCaN testbed experiment provides an on-orbit, adaptable, SDR Space Telecommunications Radio System (STRS) - based facility to conduct a suite of experiments to advance the Software Defined Radio, Space Telecommunications Radio Systems (STRS) standards, reduce risk (Technology Readiness Level (TRL) advancement) for candidate Constellation future space flight hardware software, and demonstrate space communication links critical to future NASA exploration missions. The SCaN testbed project provides NASA, industry, other Government agencies, and academic partners the opportunity to develop and field communications, navigation, and networking technologies in the laboratory and space environment based on reconfigurable, software defined radio platforms and the STRS Architecture.The SCaN testbed is resident on the P3 Express Logistics Carrier (ELC) on the exterior truss of the International Space Station (ISS). The SCaN testbed payload launched on the Japanese Aerospace Exploration Agency (JAXA) H-II Transfer Vehicle (HTV) and was installed on the ISS P3 ELC located on the inboard RAM P3 site. The daily operations and testing are managed out of NASA GRC in the Telescience Support Center (TSC).

Passive Thermal Design↗

Advanced Technology for Isolating Payloads in Microgravity

One presumption of scientific microgravity research is that while in space disturbances are minimized and experiments can be conducted in the absence of gravity. The problem with this assumption is that numerous disturbances actually occur in the space environment. Scientists must consider all disturbances when planning microgravity experiments. Although small disturbances, such as a human sneeze, do not cause most researchers on earth much concern, in space, these minuscule disturbances can be detrimental to the success or failure of an experiment. Therefore, a need exists to isolate experiments and provide a quiescent microgravity environment. The objective of microgravity isolation is to quantify all possible disturbances or vibrations and then attenuate the transmission of the disturbance to the experiment. Some well-defined vibration sources are: experiment operations, pumps, fans, antenna movements, ventilation systems and robotic manipulators. In some cases, it is possible to isolate the source using simple vibration dampers, shock absorbers and other isolation devices. The problem with simple isolation systems is that not all vibration frequencies are attenuated, especially frequencies less than 0.1 Hz. Therefore, some disturbances are actually emitted into the environment. Sometimes vibration sources are not well defined, or cannot be controlled. These include thermal "creak," random acoustic vibrations, aerodynamic drag, crew activities, and other similar disturbances. On some "microgravity missions," such as the United States Microgravity Laboratory (USML) and the International Microgravity Laboratory (IML) missions, the goal was to create extended quiescent times and limit crew activity during these times. This might be possible for short periods, but for extended durations it is impossible due to the nature of the space environment. On the International Space Station (ISS), vehicle attitude readjustments are required to keep the vehicle in a minimum torque orientation and other experimental activities will occur continually, both inside and outside the station. Since all vibration sources cannot be controlled, the task of attenuating the disturbances is the only realistic alternative. Several groups have independently developed technology to isolate payloads from the space environment. Since 1970, Honeywell's Satellite Systems Division has designed several payload isolation systems and vibration attenuators. From 1987 to 1992, NASA's Lewis Research Center (LeRC) performed research on isolation technology and developed a 6 degree-of-freedom (DOF) isolator and tested the system during 70 low gravity aircraft flight trajectories. Beginning in early 1995, NASA's Marshall Space Flight Center (MSFC) and McDonnell Douglas Aerospace (MDA) jointly developed the STABLE (Suppression of Transient Accelerations By Levitation Evaluation) isolation system. This 5 month accelerated effort produced the first flight of an active microgravity vibration isolation system on STS-73/USML-02 in late October 1995. The Canadian Space Agency developed the Microgravity Vibration Isolation Mount (MIM) for isolating microgravity payloads and this system began operating on the Russian Mir Space Station in May 1996. The Boeing Defense & Space Group, Missiles & Space Division developed the Active Rack Isolation System (ARIS) for isolating payloads in a standard payload rack. ARIS was tested in September 1996 during the STS-79 mission to Mir. Although these isolation systems differ in their technological approach, the objective is to isolate payloads from disturbances. The following sections describe the technologies behind these systems and the different types of hardware used to perform isolation. The purpose of these descriptions is not to detail the inner workings of the hardware but to give the reader an idea of the technology and uses of the hardware components. Also included in the component descriptions is a paragraph detailing some of the advances in isolation technology for that particular component. The final section presents some concluding thoughts and a summary of anticipated advances in research and development for isolating microgravity experiments.

Alhorn, Dean C.↗

The power and efficiency of advanced software and parallel processing

Real-time simulation of flexible and articulating systems is difficult because of the computational burden of the time varying calculations. The mobile servicing system of the NASA Space Station Freedom will handle heavy payloads by local arm manipulations and by translating along the spline of the Station, it is crucial to have real-time simulation available. To enable such a simulation to be of high fidelity and to be able to be hosted on a modest computer, special care must be made in formulating the structural dynamics. Frontal solution algorithms save considerable time in performing these calculations. In addition, it is necessary to take advantage of parallel processing be compatible to take full advantage of both. An approach is offered which will result in high fidelity, real-time simulation for flexible, articulating systems such as the space Station remote servicing system.

Singh, Ramen P.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

The Impact of Flight Hardware Scavenging on Space Logistics

For a given fixed launch vehicle capacity the logistics payload delivered to the moon may be only roughly 20 percent of the payload delivered to the International Space Station (ISS). This is compounded by the much lower flight frequency to the moon and thus low availability of spares for maintenance. This implies that lunar hardware is much more scarce and more costly per kilogram than ISS and thus there is much more incentive to preserve hardware. The Constellation Lunar Surface System (LSS) program is considering ways of utilizing hardware scavenged from vehicles including the Altair lunar lander. In general, the hardware will have only had a matter of hours of operation yet there may be years of operational life remaining. By scavenging this hardware the program, in effect, is treating vehicle hardware as part of the payload. Flight hardware may provide logistics spares for system maintenance and reduce the overall logistics footprint. This hardware has a wide array of potential applications including expanding the power infrastructure, and exploiting in-situ resources. Scavenging can also be seen as a way of recovering the value of, literally, billions of dollars worth of hardware that would normally be discarded. Scavenging flight hardware adds operational complexity and steps must be taken to augment the crew s capability with robotics, capabilities embedded in flight hardware itself, and external processes. New embedded technologies are needed to make hardware more serviceable and scavengable. Process technologies are needed to extract hardware, evaluate hardware, reconfigure or repair hardware, and reintegrate it into new applications. This paper also illustrates how scavenging can be used to drive down the cost of the overall program by exploiting the intrinsic value of otherwise discarded flight hardware.

Oeftering, Richard C.↗

Multivariable control of the Space Shuttle Remote Manipulator System using linearization by state feedback

This paper demonstrates an approach to nonlinear control system design that uses linearization by state feedback to allow faster maneuvering of payloads by the Shuttle Remote Manipulator System (SRMS). A nonlinear feedback law is defined to cancel the nonlinear plant dynamics so that a linear controller can be designed for the SRMS. First a nonlinear design model was generated via SIMULINK. This design model included nonlinear arm dynamics derived from the Lagrangian approach, linearized servo model, and linearized gearbox model. The current SRMS position hold controller was implemented on this system. Next, a trajectory was defined using a rigid body kinematics SRMS tool, KRMS. The maneuver was simulated. Finally, higher bandwidth controllers were developed. Results of the new controllers were compared with the existing SRMS automatic control modes for the Space Station Freedom Mission Build 4 Payload extended on the SRMS.

Gettman, Chang-Ching L.↗

Coupled loads analysis for Space Shuttle payloads

Described here is a method for determining the transient response of, and the resultant loads in, a system exposed to predicted external forces. In this case, the system consists of four racks mounted on the inside of a space station resource node module (SSRNMO) which is mounted in the payload bay of the space shuttle. The predicted external forces are forcing functions which envelope worst case forces applied to the shuttle during liftoff and landing. This analysis, called a coupled loads analysis, is used to couple the payload and shuttle models together, determine the transient response of the system, and then recover payload loads, payload accelerations, and payload to shuttle interface forces.

Eldridge, J.↗

Tracking the Relative Motion of Four Space Payloads Launched from a Sub-Orbital NASA Rocket

One problem, which is comparatively new in the field of GPS (Global Positioning System) applications, is the determination of the relative trajectories of space vehicles. Applications include the docking of spacecraft, collision avoidance in the area of space stations, and trajectory reconstruction of multiple payloads. The required precision in any of these applications will vary, according to the requirements of the task and abilities of GPS to cope with the environment and the dynamics. This paper describes the post-mission reconstruction of the relative trajectories of four GPS receivers attached to four payloads jettisoned from a Black Brant XII rocket. This vehicle was launched by the National Aeronautics and Space Administration (NASA) in January 1999 from the Poker Flats Research Range near Fairbanks, Alaska. The Black Brant XII is a sub-orbital rocket designed to carry payloads of 100 to 500 kg into the upper atmosphere. Flight time is generally in the order of 10 - 20 minutes.

Bull, Barton↗

A strategy for Space Station user integration

An approach for the development of a flexible end-to-end user integration process for the Space Station is proposed. Users are assigned to an integration class based on the integration complexity of their payloads. The user, user sponsor, and payload accomodations manager develop an integration timeline for the user. The development of techniques to manage multiple payloads and increments over the life of the Space Station, while minimizing interactions between the integration flows of individual users is considered. The integration classes are defined and the strategic, tactical, and execution planning phases of the process are described.

Levitt, Paul A.↗

Access Accommodation Study

A new mission payload concept for the International Space Station (ISS) called ACCESS (Advanced Cosmic-ray Composition Experiment for Space Station) has undergone a preliminary study which is now complete, and its results are published here. The mission holds the promise for answering many of the outstanding astrophysical questions associated with Galactic cosmic rays and their role in our Galaxy. ACCESS science goals include measurement of the rare ultra-high energy and ultra-heavy components of cosmic radiation which have not been analyzed previously above the Earth's atmosphere. The critical resource made available by the ISS is collection factor (area x exposure time), as much as 10,000 square meters-sr-days for a four-year stay on-orbit. This will allow ACCESS to go beyond balloon-borne detectors and take the science of cosmic-ray observation to the threshold of space. The ACCESS instrument, consisting of a charge module, a transition radiation detector, and a calorimeter, should make valuable measurements of nuclei throughout the periodic table up to 1015 eV. The concept, options, mission plan, and accommodation issues for such an ISS payload are summarized. This includes the carrier, ISS Site, mass, thermal control, power, data and operations. The study demonstrates that the ISS, as a stable science platform at the threshold of space, makes improved cosmic-ray ACCESS possible at the turn of the century.

Wilson, Thomas L.↗

Optical Communications Systems for NASA's Human Space Flight Missions

The Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) office at Goddard Space Flight Center (GSFC) manages two NASA optical communication related projects, the Orion EM-2 Optical Communications Terminal (O2O) and the Integrated Laser Communications Relay Demonstration (LCRD) Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) projects. The main goal of LEMNOS is the advancement and implementation of optical communications systems and technologies for NASA missions. The O2O mission is sponsored by NASA's Human Exploration and Operations (HEO) Mission Directorate. The O2O project will provide optical communications capability to the Orion series of spacecraft, starting with the demonstration of operational utility on EM-2. It will be the first time a human exploration mission will rely on optical communications for its high-bandwidth link. ILLUMA-T is sponsored by the Space Communications and Navigation (SCaN) Program Office. It is destined for the International Space Station (ISS) as an external payload attached to the Japanese Experiment Module - Exposed Facility (JEM-EF). The ILLUMA-T project is developing an optical communications user terminal to demonstrate high bandwidth data transfer between LEO and the ground through the geosynchronous LCRD relay. ILLUMA-T will be the first demonstration of a LEO user of the LCRD system, pointing and tracking from a moving spacecraft at LEO to GEO satellite and vice versa, end-to-end operational utility of optical communications, and 51 Mbps forward link to ISS from ground. Both projects are collaborations between GSFC, Massachusetts Institute of Technology â€" Lincoln Laboratory (MIT-LL), and a number of contractors.

Lasercom↗