Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Competitiveness Improvement Project 2020 Informational Workshop

These presentations from the Dec. 8, 2020, Competitiveness Improvement Project (CIP) workshop provide an overview of the CIP process, evaluation criteria, certification requirements, and NREL's technical support opportunities for those interested in applying to CIP solicitations.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Fiscal Year 2020 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

U.S. Department of Energy Standard DOE-STD-5002-2017, “Disposal Authorization Statement and Tank Closure Documentation,” requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2020 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Easy and Enticing: How a Collaborative Approach to Emerging Technology Adoption in the Commercial Building Sector Has Made Its Mark

In 2012, the U.S. Department of Energy (DOE), in collaboration with interested partners (e.g., applicable trade groups), initiated a novel market transformation approach, technology adoption campaigns, to speed the adoption of new technologies that save energy and money in buildings—first with lighting and later with other building technologies. This approach couples technical performance evaluation, guidance, data tracking and technical assistance with recognition for exemplary performance and best practices. Campaigns can be designed around emerging technologies that have significant, cost-effective national energy savings potential and where there is strong public- and private-sector interest in sharing performance criteria and outcomes. Participants in the campaigns share project data with the national laboratories and DOE, benefit from technical support and assistance from objective experts, and highly value recognition for their accomplishments. DOE and its campaign partners benefit from accelerated adoption of new energy-saving technologies and engagement with manufacturers and end users that allows for data collection and insights into technology research needs. This paper documents the success, challenges, lessons learned, and energy and cost savings of lighting campaigns, and in many cases compares these findings with other campaign efforts. This paper also presents recommendations for how other programs of various sizes can employ this model.

Myer, Michael↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Milestone 1.2.9: Radiolytic Gas Generation Measurements from Helium Backfilled Samples of AA1100 and AA6061 Coupons

Nearly 18 metric tons of aluminum-clad spent nuclear fuel (ASNF) is safely managed by the U.S. Department of Energy (DOE). These assemblies are currently in interim storage, with the intention of extended storage (>50 years) until final disposal. Strategies for the continued safe storage of this material are under evaluation, of which a key criterion is the extent of molecular hydrogen gas (H2) formation from the radiolysis of hydrated (oxy)hydroxide aluminum corrosion layers arising from in-reactor and wet storage conditions. Radiation-induced H2 formation has the potential to compromise cladding and storage canister integrity, in addition to promoting the formation of unfavorable gaseous environments. Consequently, understanding this radiation-induced phenomenon is essential for the development of predictive modeling capabilities to support technical considerations and the identification of radiation related challenges for the extended storage of ASNF. Here, we report radiolytic H2 yields (G-values, G(H2)) from the gamma irradiation of ‘pristine’ and pre-corroded aluminum coupons in helium (He) environments as a function of alloy composition (AA1100 and AA6061), relative humidity, and absorbed gamma dose. Measured yields were lower than corresponding values reported for argon environments, a positive result for proposed extended dry storage strategies that would employ helium as a backfill gas. Interestingly, the presented G(H2)He values are comparable to those previously measured in nitrogen environments, suggesting a He mediated H2 inhibition process, attributed here to Penning ionization.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Risk-Informed Approach for Regulatory Approval of Microreactor Transport

Pacific Northwest National Laboratory (PNNL) is addressing the challenges associated with safe transport of microreactors including the development and evaluation of regulatory options. PNNL developed a risk-informed regulatory framework for the licensing of the transportation of microreactors in which irradiated nuclear fuel is part microreactor transportation package. The framework lays out a viable regulatory pathway, including decision points for regulatory options and the supporting technical evaluations for those options in phases from near to long term. A microreactor and its contents will likely not be able to meet all the federal regulatory requirements as a Type B or fissile material transportation package under 10 CFR Part 71 (“Packaging and Transportation of Radioactive Material”). However, the regulatory framework developed by PNNL lays out a viable risk-informed licensing options that are safe and feasible. Risk assessment such as probabilistic risk assessment (PRA) can be used to show comparable safety to that provided by a Type B or fissile material package for surface transport. The framework includes guidance on applicable regulations and discusses historical precedence in using risk information for transportation licensing. The framework includes guidance for performing a microreactor transportation PRA, use and development of risk evaluation criteria, and factors such of defense-in-depth and safety margin concepts. Key advantages of using the approach are (1) increasing the likelihood of successfully obtaining regulatory transportation package approval, (2) informing the design on the relative risk significance of microreactor containment and shielding, and (3) informing the need for transportation compensatory measures. This paper focuses on two primary elements of the framework which are development of a transportation PRA for microreactor packages and development of the risk acceptance guidelines to assess the results of the PRA for regulatory decision-making.

microreactor, micro nuclear power plant, MNPP, ris↗

GMLC Technical Assistance to States

This presentation provides an overview of the U.S. Department of Energy's Grid Modernization Laboratory Consortium (GMLC) efforts to provide customized technical support specific to state public utility commissions (PUCs), specifically on the integration of distributed energy resources (DERs). The goals are to increase awareness of existing materials and support to help state PUCs move forward on DER interconnection activities, to help participants make connections to colleagues with similar challenges (and solutions), and to help the GMLC/National Renewable Energy Laboratory project team understand context and implementation challenges.

DER↗

Application of Data Quality Objectives in Decommissioning Plans

The Data Quality Objectives (DQOs) are applicable and relevant in the design of measurements that provide data for good, effective decision-making. The DQOs provide criteria for the design of measurements and provide a target for assessing the level of data quality that is considered acceptable for effective decision-making. Such targets in the design of measurements help eliminate the acquisition of unnecessary, duplicative or overly precise data. They help provide more efficient use of limited measurement resources. With the application of DQOs, D and D program decisions are identified, DQOs are established, and measurements are designed to provide data that meet the DQOs for each decision point. Since the Historical Site Assessment (HSA), Scoping, Characterization, and Remedial Action Surveys provide data and information to all D and D program decision-making, an integrated approach should be taken where all input requirements are considered, in the design of each survey. The decision points and their linkages form a network of decisions referred to as a decision framework. Since distinct D and D program functions are linked by their decisions, programs proceed through the decision framework, in a uniform fashion, to one endpoint, the decision to release the site. The decision to release the site is based on the ability to pass the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). Therefore, D and D planning has a primary aim, to integrate D and D program efforts in a manner that will allow D and D decision-making to reach one end point, effective MARSSIM decision-making. The Decision Framework is best represented, schematically, by a decision tree. The decision tree is based on 3- decision points and represents a decision in each of the Remediation, Dose Assessment and MARSSIM program functions. The decisions address the extent of excavation, dose modeling approach, and sampling for the MARSSIM Final Status Survey (FSS). The simplified decision rule established for each decision point relies on the questions: deep excavation or not; site-specific modeling or not; and high number of samples or not. For these decision rules, the basic outcomes are yes or no to the questions. As decision-makers proceed through the decision tree, there are 8 different paths available based on the theoretical relationship 2N, where N=3. All the paths lead to the one-end point, MARSSIM decision-making. Data and information from pre-release surveys provide input to each decision (although not illustrated in the decision tree schematic). Here MARSSIM represents a legitimate D and D program with decision-making functions. Since D and D decisions are connected to MARSSIM decisions, as illustrated in the decision tree, D and D decision-making can be captured in the MARSSIM context and the decision tree included in the MARSSIM report. These weighted options were selected because they represent 3-alternate plans (strategies) that could be implemented with equivalent total resources (costs). Hypothetical costing for each D and D program function is indicated at each section of the paths in terms of normalized values 10 and 1, in arbitrary units. Option 1 describes a path where Deep Excavation, Site specific Modeling, and a Low Number of Samples for the FSS are the bases. Option 2 describes a path where Deep Excavation, Screening Values, and a High Number of Samples are the bases. Option 3 utilizes Shallow Excavation, Site-specific Modeling, and a High Number of Samples in the FSS design. Since the 3-options are equivalent in costs, the selection of the best D and D option or MARSSIM Plan for the site could be determined by other factors such as Waste Management, Health and Safety, or Regulatory Compliance. For example, a site with Health and Safety issues may want to utilize Option 3, so that cleanup worker exposure is minimized during excavation. A small site, that has limited technical support, may want to use tables of screening values for dose assessments, and therefore Option 2 may be an appropriate MARSSIM Plan. Another example would be a case for the use of Option 1 where the D and D manager may want to minimize difficulties with getting pass MARSSIM tests. By conducting extensive cleanup and calculating more realistic (less conservative) dose values, more flexibility in MARSSIM is obtained. for any decision framework, there are a number of reasonable paths to be considered in D and D decision-making and that these paths can be viewed as a family of MARSSIM Plans. Optimization of MARSSIM decision-making can occur by selecting, from this family of MARSSIM Plans, the most appropriate plan for the conditions at a specific site. This approach represents a more comprehensive evaluation of D and D options and strategies that regulators and stakeholders would most likely appreciate in the MARSSIM Final Report. In an era of information management, it would be prudent to take advantage of opportunities offered by the application of DQOs and the utilization of its decision-framework. The example utilized of a decision framework, is an overly simplified (N=3) model and is presented for illustrative purposes. A typical D and D project would have many more decision points to consider in formulating the decision framework and its decision tree, and the use of high level computing would be needed.

99 GENERAL AND MISCELLANEOUS↗

Risk-Based Information to Support the Evaluation of Management Options for Cesium and Strontium Capsules at the Hanford Site

Evaluations are under way to support U.S. Department of Energy decisions on how to manage cesium and strontium capsules currently in storage at the Hanford site. Health-based exposure limits for drinking water, oral toxicity data, and environmental fate information were combined in an initial evaluation to frame performance targets for managing chemicals and radionuclides that could leach from the capsules and migrate to groundwater over time. More than 50 relevant benchmarks were identified for 15 of the 17 contaminants in the study set. Of those multiple benchmarks, EPA limits for drinking water served as the main basis for the leachate performance targets. For the remaining two contaminants, stable cesium and zirconium, preliminary indicators were derived from a limited review of toxicity data. Thus, preliminary candidate concentrations were identified for the full study set to support the ongoing evaluation of capsule management options. In summary: In an earlier scoping study, three radionuclides and eight chemicals were identified as contaminants of interest for leachate from cesium and strontium capsules stored at the Hanford site. To frame management options for these capsules, it is assumed that contaminants will leach to groundwater and serve as a drinking water source in the long-term future. Before developing performance targets for the initial set of contaminants, a combined fate and toxicity evaluation was conducted to determine if any others should be added to account for decay or fate products and chemical toxicity. From this review, the list was expanded to produce a final study set of 17 contaminants. Established exposure limits and toxicity data were then reviewed and integrated to develop candidate health-based concentrations to frame performance targets for assessing options for long-term capsule management. This review of more than a dozen different benchmarks and toxicity sources translated to hundreds of individual data checks to support the identification of these target concentrations. In most cases, an EPA drinking water standard served as the key basis for the suggested target. Exceptions were warranted when the drinking water standard reflects dated information and more recent studies suggest a different concentration. Thus, for contaminants with older limits (such as Sr-90), the drinking water standard is identified and an alternate value is also provided that reflects more recent scientific knowledge. Although multiple limits or guidelines exist for most study chemicals, no benchmarks were found for stable cesium or zirconium. Thus, the preliminary target concentrations for these two metals were based on an initial limited review of toxicity data from the scientific literature. In conclusion, fate and toxicity information can be effectively integrated to develop target concentrations for managing contaminated materials at cleanup sites. These targets are simply intended to serve as guides, not as part of a formal compliance review process. For this reason, to the extent possible, it is useful to incorporate current health-based information relevant to the given application. For the Hanford application, it is expected that the preliminary targets will be refined to reflect evolving knowledge. That knowledge may extend from additional characterization of the capsules and their disposition options, and further context for setting-related conditions, to the refinement of benchmarks and underlying models, and further toxicity assessments. The overall goal is to support technical risk analyses for Hanford with current scientific knowledge and practice, to assure health protection into the long term. (authors)

54 ENVIRONMENTAL SCIENCES↗

IRSN working program status on tools for evaluation of SFR cores static neutronics safety parameters

As technical support of the French Nuclear Safety Authority, IRSN will be in charge of safety assessment of any future project of Sodium Fast Reactor (SFR) that could be built in France. One of the main safety topics will deal with reactivity control. Since the design and safety assessment of the last two SFR plants in France (Phenix and Superphenix, more than thirty years ago), methods, codes and safety objectives have evolved. That is why a working program on core neutronic simulations has been launched in order to be able to evaluate accuracy of future core characteristics computations. The first step consists in getting experienced with the ERANOS well-known deterministic code used in the past for Phenix and Superphenix. Then Monte-Carlo codes have been tested to help in the interpretation of ERANOS results and to define what place this kind of codes can have in a new SFR safety demonstration. This experience is based on open benchmark computations. Different cases are chosen to cover a wide range of configurations. The paper shows, as an example, criticality results obtained with ERANOS, SCALE and MORET, and the first conclusions based on these results. In the future, this work will be extended to other safety parameters such as sodium void and Doppler effects, kinetic parameters or flux distributions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Refurbishment program of HANARO control computer system

HANARO, an open-tank-in-pool type research reactor with 30 MW thermal power, achieved its first criticality in 1995. The programmable controller system MLC (Multi Loop Controller) manufactured by MOORE has been used to control and regulate HANARO since 1995. We made a plan to replace the control computer because the system supplier no longer provided technical support and thus no spare parts were available. Aged and obsolete equipment and the shortage of spare parts supply could have caused great problems. The first consideration for a replacement of the control computer dates back to 2007. The supplier did not produce the components of MLC so that this system would no longer be guaranteed. We established the upgrade and refurbishment program in 2009 so as to keep HANARO up to date in terms of safety. We designed the new control computer system that would replace MLC. The new computer system is HCCS (HANARO Control Computer System). The refurbishing activity is in progress and will finish in 2013. The goal of the refurbishment program is a functional replacement of the reactor control system in consideration of suitable interfaces, compliance with no special outage for installation and commissioning, and no change of the well-proved operation philosophy. HCCS is a DCS (Discrete Control System) using PLC manufactured by RTP. To enhance the reliability, we adapt a triple processor system, double I/O system and hot swapping function. This paper describes the refurbishment program of the HANARO control system including the design requirements of HCCS. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Calculation of the Phenix end-of-life test 'Control Rod Withdrawal' with the ERANOS code

The Inst. of Radiological Protection and Nuclear Safety (IRSN) acts as technical support to French public authorities. As such, IRSN is in charge of safety assessment of operating and under construction reactors, as well as future projects. In this framework, one current objective of IRSN is to evaluate the ability and accuracy of numerical tools to foresee consequences of accidents. Neutronic studies step in the safety assessment from different points of view among which the core design and its protection system. They are necessary to evaluate the core behavior in case of accident in order to assess the integrity of the first barrier and the absence of a prompt criticality risk. To reach this objective one main physical quantity has to be evaluated accurately: the neutronic power distribution in core during whole reactor lifetime. Phenix end of life tests, carried out in 2009, aim at increasing the experience feedback on sodium cooled fast reactors. These experiments have been done in the framework of the development of the 4. generation of nuclear reactors. Ten tests have been carried out: 6 on neutronic and fuel aspects, 2 on thermal hydraulics and 2 for the emergency shutdown. Two of them have been chosen for an international exercise on thermal hydraulics and neutronics in the frame of an IAEA Coordinated Research Project. Concerning neutronics, the Control Rod Withdrawal test is relevant for safety because it allows evaluating the capability of calculation tools to compute the radial power distribution on fast reactors core configurations in which the flux field is very deformed. IRSN participated to this benchmark with the ERANOS code developed by CEA for fast reactors studies. This paper presents the results obtained in the framework of the benchmark activity. A relatively good agreement was found with available measures considering the approximations done in the modeling. The work underlines the importance of burn-up calculations in order to have a fine core concentrations mesh for the calculation of the power distribution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Calculation of the Phenix end-of-life test in natural circulation with the CATHARE code

The Inst. of Radiological Protection and Nuclear Safety (IRSN) acts as technical support to French public authorities. As such, IRSN is in charge of safety assessment of operating and under construction reactors, as well as future projects. In this framework, one current objective of IRSN is to evaluate the ability and accuracy of numerical tools to foresee consequences of accidents. One of the advantages pointed up for fast reactors cooled by heavy liquid metal is the possibility of decay heat removal based on natural convection. The promotion of this passive cooling mode in future safety demonstrations will involve the use of adapted and validated numerical codes. After the final shutdown of the Phenix sodium cooled fast reactor in 2009, a set of tests covering different areas was conducted for code validation, including a natural circulation test in the primary circuit. Experimental data were issued by CEA to organize a benchmark exercise in the frame of an IAEA Coordinated Research Project (CRP), with the objective to assess the system-codes capability in simulating the thermal-hydraulics behavior of sodium cooled fast reactors in such accidental conditions. IRSN participated to this benchmark with the CATHARE code. This code, co-developed by CEA, EDF, AREVA and IRSN and widely used for PWR safety studies, was recently extended for sodium applications. This paper presents the CATHARE modeling of the Phenix primary circuit and the results obtained. A relatively good agreement was found with available measurements considering the experimental uncertainties. This work stressed the local aspects of phenomena occurring during the natural convection establishment and the limits of a 0D/1D approach. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Multi-scale, Geo-data Science Method for Assessing Unconventional Critical Mineral Resources

Critical minerals (CM) supply raw materials that constitute many of our essential infrastructure, defense, technology, and electrification needs. Currently, production and refinement of these materials from conventional sources is limited to few regions globally, which makes supply of these resources particularly venerable to disruption. To help overcome these risks and meet growing demand, attention has focused on identifying and developing resource potential of unconventional geologic CM sources, such as rare-earth elements in sedimentary systems. However, the unconventional nature of these types of sources means they are often poorly characterized and/or under-explored with respect to conventional counterparts. We present a regional case study for an Unconventional Rare-earth and Critical minerals (URC) assessment method for predicting and identifying REE resource potential and occurrence in unconventional systems in the Central Appalachian Basin (CAB). The method utilizes a geologic and geospatial data-driven approach, informed and guided by knowledge of REE enrichment processes, to systematically predict and identify areas of higher enrichment. Results from the test case indicate locations with potential for different types of coal-REE deposits, demonstrating its utility for reducing the area of exploration and identifying sites for more detailed investigation. Building upon the regional scale assessment capability, ongoing science-based enhancements to the method will allow for finer-scale (e.g., mine-scale) predictions required to support technical and economic assessments.

Creason, Christopher↗

Environmental Radiation Monitoring at the Areas of the Former Military Technical Bases at the Russian Far East - 12445

After termination of operation at the serviced facilities of the nuclear fleet of the former Soviet Union, the Military Technical Base in Sysoeva Bay has been reorganized to the site for SNF and RW temporary storage (STS). The main activities of STS are receipt, storage and transmission to radioactive waste reprocessing. Establishment of the RW management regional centre in the Far-Eastern region at the STS in Sysoeva Bay implies intensification of SNF and RW management in this region that can result in increasing ecological load to the adjacent areas and settlements. Regulatory supervision of the radiation safety at the areas of the Former Military Technical Bases at the Russian Far East is one of the regulatory functions of the Federal Medical Biological Agency (FMBA of Russia). To regulate SNF an RW management and provide the effective response to changing radiation situation, the environmental radiation monitoring system is arranged. For this purpose, wide range of environmental media examinations at the Sysoeva Bay STS was performed by Burnasyan Federal Medical Biophysical Centre - a technical support organization of FMBA of Russia in collaboration with the Federal State Geological Enterprise 'Hydrospecgeology' (Federal Agency for Entrails). Regulation during the RW and SNF management is continuous process, which the FMBA of Russia implements in close cooperation with other Russian responsible authorities - the State Atomic Energy Corporation 'Rosatom' and Federal Agency for Entrails. The Environmental radiation monitoring findings served as a basis for the associated databank arrangement. The radio ecological monitoring system was arranged at the facilities under inspection for the purpose of the dynamic control of the radiation situation. It presupposes regular radiometry inspections in-situ, their analysis and assessment of the radiation situation forecast in the course of the STS remediation main stages. Some new data on the radiation situation at the facilities will appear in future and the prognostic assessment will become more precise. The mentioned natural, practical and theoretical works is a base for the development of the set of regulatory documents to assure radiation protection and safety of workers, public and environment, as well as development of documents to regulate SNF and RW management at the STS facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic D and D: Smart robots - 15093

Project' managers continually seek an ever-greater optimization of time between remote handling operations and those carried out manually; therefore, new technological solutions must be deployed. Robotics offers a great opportunity in this new field of technology to carry out, for example, samplings or remediation in hostile, cluttered surroundings. Teams in charge of dismantling at the CEA have therefore first defined robotizable functions. These functions have been assembled from existing technological blocks to arrive at robots which are operating today [RICAIII, patent: FR 2925702]. Lessons learned, particularly from experience with the RICA robot, have enabled the operating technical specifications to be fine-tuned. A new study phase has been launched applying the same principle of adapting existing, proven means. The growing role of robotics today is unquestioned. Led by research and the academic world; robots such as those equipped with wheels, tracks, feet or even helicopter rotors, are today accessible to the general public, particularly via broadening of the 'open source' concept. Added to these we need tools able to manage large component deconstruction systems, like MAESTRO. Industrialization of such high-potential technological solutions has been aided by: - Easy use, - Increasing reliability, - Flexibility of 'open source' solutions, - Widening skill networks, and therefore greater technical support - Lower costs. Decontamination and dismantling (D and D) projects must be able to meet a number of special demands, increasing the number of unit designs, their costs and delivery times. The complexity of dismantling works sites mean that each is a special case to be dealt with almost independently. Such a way of approaching these projects is not on the same wavelength as industry, with tool and method standardization. The answer to the challenge of operations in difficult environments is an eco-system of functions, performed by a set of inter-connected robots. The first step towards the construction of such robot teams is devoted to functions where strength is not necessary: investigating and clean-up in hostile environments. With this in mind, the CEA Marcoule teams have been given the objective of merging the strengthening commercial robotic world with the needs of D and D, and thus to improve the transversal use of the systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Immediate Dismantling of a Large Fleet of LWR NPPs: Consequences for Spent Fuel and Waste Management - 16027

The experience feedback shows that the complete dismantling of one Light Water Reactor (LWR) unit is an activity now globally well under control (reactor pressure vessel and its internals removal and cutting included). However some specific industrial difficulties may arise in view of the dismantling of numerous LWR units simultaneously. Indeed more than 300 LWR units are currently operated worldwide, which have been commissioned these last 50 years. So in some countries, many units may be permanently shut down over a period of few years in the next decades. Such a situation addresses the issue of the overall management of large quantities of spent nuclear fuel (SNF) and decommissioning waste for the concerned units. For example, in France, the legislative and regulatory framework for the nuclear facilities favors their dismantling 'as soon as possible' after their permanent shutdown which implies as well to limit the duration of the transition period from operation to decommissioning. Furthermore 58 LWR units have been commissioned between 1977 and 1999 in France - on average more than 2 units per year. In this context, the operator (Electricite de France - EDF) plans to remove quickly the SNF then to perform dismantling actions immediately after the permanent shutdown of the LWR units. One issue is to remove the SNF from all the relevant units, even if this removal is simultaneous in many units (permanently shut down or still under operation). Similar issue has to be taken into account regarding the management of the radioactive waste (RW) produced by the dismantling and clean-up actions, notably the RW that cannot be disposed of in a near surface repository. One method followed by the French technical support organization (Institut de Radioprotection et de Surete Nucleaire - IRSN) to analyze these issues is the use of estimates of flows of SNF and RW. These estimates are based notably on a phasing-scenario and a planning template defined for the decommissioning of the units of one nuclear power plant (NPP) and coupled to an overall schedule for phase out all the units of the fleet. The estimates relative to the next decades can be compared to the current experience feedback of flows of SNF and RW for units under operation, in order to identify risks when facing decommissioning. The risks highlighted are driven by key parameters (as duration of the main dismantling actions) of the estimates which can be adapted to minimize their impact. On this basis, it is possible to identify the key-factors to dismantle each unit of NPPs and phase out the fleet regarding SNF and RW management. It is noteworthy that this work needs to be done in any case upstream the studies and the implementation of dismantling actions. Finally it can be underlined that another issue is the human resources (staff, skills and knowledge) necessary to perform all the decommissioning actions, but this aspect is not addressed in the present paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗