Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Tribal Colleges and Universities/Advanced Manufacturing Network Initiative (Q4 FY2020 Progress Report)

The National Nuclear Security Agency (NNSA) initiated the Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants, and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new consortium in early FY17 focused on Tribal Colleges and Universities (TCUs) known as the Advanced Manufacturing Network Initiative (AMNI). This consortium has been extended for FY20 and FY21. The following report summarizes the status update during this quarter.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Tribal Colleges and Universities/Advanced Manufacturing Network Initiative (Phase II) (Q1 FY2021 Progress Report)

The National Nuclear Security Agency (NNSA) initiated the Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants, and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new consortium in early FY17 focused on Tribal Colleges and Universities (TCUs) known as the Advanced Manufacturing Network Initiative (AMNI). This consortium has been extended for FY20 and FY21. The following report summarizes the status update during this quarter.

42 ENGINEERING↗

Tribal Colleges and Universities/Advanced Manufacturing Network Initiative Phase II Sandia Technical Assistance (Q2 FY2021 Progress Report)

The National Nuclear Security Agency (NNSA) initiated the Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants, and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new consortium in early FY17 focused on Tribal Colleges and Universities (TCUs) known as the Advanced Manufacturing Network Initiative (AMNI). This consortium has been extended for FY20 and FY21. The following report summarizes the status update during this quarter.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tribal Colleges and Universities/Advanced Manufacturing Network Initiative Phase II Sandia Technical Assistance FY21 Q3 Progress Report

The National Nuclear Security Agency (NNSA) initiated the Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants, and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new consortium in early FY17 focused on Tribal Colleges and Universities (TCUs) known as the Advanced Manufacturing Network Initiative (AMNI). This consortium has been extended for FY20 and FY21. The following report summarizes the status update during this quarter.

42 ENGINEERING↗

Tribal Colleges and Universities/Advanced Manufacturing Network Initiative: Phase II Sandia Technical Assistance (FY21 Q4 Progress Report)

The National Nuclear Security Agency (NNSA) initiated the Minority Serving Institution Partnership Plan (MSIPP) 1) to align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants, and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new consortium in early FY17 focused on Tribal Colleges and Universities (TCUs) known as the Advanced Manufacturing Network Initiative (AMNI). This consortium has been extended for FY20 and FY21. The following report summarizes the status update during this quarter.

42 ENGINEERING↗

Coordinating Council. Sixth Meeting: Who Are Our Key Users?

This NASA Scientific and Technical Information Program Coordinating Council meeting deals with the topic 'Who are our key users?' Presentations were made on the following subtopics: Key users: Who uses the system the most, Who orders the most documents, Users: What do we know about them?, NASA/DOD Aerospace Knowledge Diffusion research project on 'Potential key users', How we meet the user's needs, and STI Council user requirements update. Summaries of discussions after the presentations are included along with visuals for the presentations.

Source record↗

Airborne Wind Shear Detection and Warning Systems: Fourth Combined Manufacturers' and Technologists' Conference, part 1

The purpose of the meeting was to transfer significant ongoing results of the NASA/FAA joint Airborne Wind Shear Program to the technical industry and to pose problems of current concern to the combined group. It also provided a forum for manufacturers to review forward-look technology concepts and for technologists to gain an understanding of the problems encountered by the manufacturers during the development of airborne equipment and the FAA certification requirements. The present document was compiled to record the essence of the technology updates and discussions which follow each.

Vicroy, Dan D.↗

Astrobee: Improving Capabilities for Free Flying Robotic Technology Demonstrations

The Astrobee Project has completed three years operating inside the ISS. Three Astrobee Free Flyers reached the ISS in April 2019 and are currently hosting a variety of users. During this time, Astrobee has advanced the state of the art in free-flying robots on ISS, operated over 100 sessions, logged over 750 hours of free-flyer operation, and made several capability improvements. Astrobee’s primary objective is to provide a highly flexible and capable free-flying robotic research platform to enable future guest scientist investigations. However, Astrobee is also demonstrating the feasibility of intra-vehicular robots (IVR) for performing key caretaking functions within exploration vehicles as part of NASA’s Moon-to-Mars exploration strategy. IVR capabilities will be especially vital during uncrewed mission phases. For example, current plans call for the lunar Gateway to be uncrewed >85% of the time. Astrobee’s baseline implementation supports free-flying camera and sensor survey use cases. Astrobee guest scientists can deploy software updates and hardware payloads to extend its capabilities. Astrobee is continuously improving its navigation robustness, general flight software maturity, and ISS interior maps, both through the baseline Astrobee operations and with the help of the ISAAC project. Astrobee began with mapping, localization, and operations in the Japanese Experiment Module (JEM), and has expanded to mapping in Node 2 and the US Lab. Astrobee has improved localization and operational robustness through improved mapping processes, algorithm updates (Soussan 2022) that reduce the occurrences of lost localization as well as developed recovery techniques to return to a good localization fix when loss of localization does occur. Future guest science experiments currently in development could demonstrate cargo transfer, fault isolation, free flyer and stationary robot collaboration, microgravity fluid transfer, and new docking mechanisms, among others. This presentation will focus on 1) Astrobee technical capabilities 2) What Astrobee can provide to a guest science experiment 3) Astrobee’s recent improvements 4) Possibilities for using Astrobee for future investigations. Soussan, R., Kumar, V., Coltin, B. and Smith, T. (2022) AstroLoc: An Efficient and Robust Localizer for a Free-flying Robot, Proc. Int. Conf. Rob. Autom. (ICRA) [to appear]

Astrobee↗

Airborne Wind Shear Detection and Warning Systems. Fourth Combined Manufacturers' and Technologists' Conference, part 2

The Fourth Combined Manufacturers' and Technologists' Conference was hosted jointly by NASA Langley Research Center (LaRC) and the Federal Aviation Administration (FAA) in Williamsburg, Virginia, on April 14-16, 1992. The meeting was co-chaired by Dr. Roland Bowles of LaRC and Bob Passman of the FAA. The purpose of the meeting was to transfer significant ongoing results of the NASA/FAA Joint Airborne Wind Shear Program to the technical industry and to pose problems of current concern to the combined group. It also provided a forum for manufacturers to review forward-look technology concepts and for technologists to gain an understanding of the problems encountered by the manufacturers during the development of airborne equipment and the FAA certification requirements. The present document has been compiled to record the essence of the technology updates and discussions which follow each.

Vicroy, Dan D.↗

Advanced Technology Composite Fuselage: Program Overview

The Advanced Technology Composite Aircraft Structures (ATCAS) program has studied transport fuselage structure with a large potential reduction in the total direct operating costs for wide-body commercial transports. The baseline fuselage section was divided into four 'quadrants', crown, keel, and sides, gaining the manufacturing cost advantage possible with larger panels. Key processes found to have savings potential include (1) skins laminated by automatic fiber placement, (2) braided frames using resin transfer molding, and (3) panel bond technology that minimized mechanical fastening. The cost and weight of the baseline fuselage barrel was updated to complete Phase B of the program. An assessment of the former, which included labor, material, and tooling costs, was performed with the help of design cost models. Crown, keel, and side quadrant cost distributions illustrate the importance of panel design configuration, area, and other structural details. Composite sandwich panel designs were found to have the greatest cost savings potential for most quadrants. Key technical findings are summarized as an introduction to the other contractor reports documenting Phase A and B work completed in functional areas. The current program status in resolving critical technical issues is also highlighted.

Ilcewicz, L. B.↗

Observations on the State of NASA's GN&C Engineering Discipline: Results of an Independent Non-Advocate Study

The NASA Technical Fellows periodically conduct State-of-the-Discipline assessments. The GN&C Technical Fellow contracted Harlan Brown & Company in 2007 and 2009 to conduct independent, third party studies to gain unbiased insight and understanding into the attitudes and beliefs of NASA's GN&C Community of Practice (CoP). The paper first outlines the background, objectives and methodology of the studies. The paper then summarizes key study results of the 2007 baseline study, as well as the 2009 update. The update was then used to track and monitor perceptions, identify performance trends, identify areas where further improvement needs to be made in NASA's GN&C discipline. It also generated feedback on the recently developed GN&C CoP online knowledge capture and learning site.

Pawlikowski, Gerald J.↗

Technical Report on Adjoint Waveform Tomography of East Asia for Improved Waveform Prediction

We present a preliminary version of the East Asia Tomography (EAT) model, an adjoint waveform tomography model of East and Southeast Asia. We used SPiRaL (Simmons et al., 2021) as our starting model and source parameters for 250 earthquakes from the Global Centroid Moment Tensor catalogue (Ekström et al., 2012). Over 198 iterations, we have iterated the EAT model down to a minimum period of 35 seconds. We plan on continuing our iteration technique down to 30 seconds period before updating our misfit function to use a normalized cross correlation-based misfit functions (e.g., Tao et al., 2018) to better constrain Earth structure. We hope to iterate the current extent of the model to 25 seconds minimum period before iterating to shorter periods for a smaller subregion of the full model.

58 GEOSCIENCES↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Exploration Medical Capability Systems Engineering Overview and Update

Long duration Lunar and Martian missions will change the way NASA currently practices medicine. The missions will require more autonomous capability compared to current low Earth orbit operations. For the medical system, lack of consumable resupply, evacuation opportunities, and real-time ground support are key drivers toward greater autonomy. Recognition of the limited mission and vehicle resources available to carry out exploration missions motivates the Exploration Medical Capability (ExMC) Element’s approach to enabling the necessary autonomy. The ExMC Systems Engineering (SE) team’s mission is to “Define, develop, validate, and manage the technical system design needed to implement exploration medical capabilities for Mars and test the design in a progression of proving grounds.” The Element’s work must integrate with the overall exploration mission and vehicle design efforts to successfully provide exploration medical capabilities. ExMC is using Model-Based System Engineering (MBSE) to accomplish its integrative goals. The MBSE approach to medical system design offers a paradigm shift toward greater integration between the vehicle and the medical system, and directly supports the transition of Earth-reliant ISS operations to the Earth-independent operations envisioned for Mars. This talk will provide a high-level overview of what the ExMC SE team has accomplished since the last IWS and what they are focusing on for the upcoming year.

Kerry McGuire↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015 and 2016, completing hardware and testing that brings NASA closer to a new era of deep space exploration. Programmatically, SLS completed Critical Design Review (CDR) in 2015. A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just five years after program start, every major element has amassed development and flight hardware and completed key tests that will lead to an accelerated pace of manufacturing and testing in 2016 and 2017. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The existing fleet of RS-25 engines is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with a fifth propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major 2015-2016 accomplishments were two booster qualification hotfire tests, a series of RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the completion of welding for all qualification and flight EM-1 core stage components and testing of flight avionics, completion of core stage structural test stands, casting of the EM-1 solid rocket motors, additional testing of RS-25 engines and flight engine controllers This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Transfer functions for Q A /Q B international regulatory limits for the safe transport of radioactive materials

This paper presents a proposed revision of the International Atomic Energy Agency transport regulations, related to the A 1 and A 2 limit values used to determine the radioactive transport classification. Based on the 'Q system', a novel methodology was introduced to derive Q A and Q B values related to scenarios involving external exposure from a distant source. These values are key parameters that respectively represent the total effective dose and total equivalent dose to the skin, from all primary and secondary particles contributing to radiation exposure. The International Working Group (WG A 1 /A 2 ) is established and associated with the TRANSSC Technical Expert Group on Radiation Protection. A review of the A 1 and A 2 values is performed in response to identified limitations within the existing Q system. The followed approach is based on Monte Carlo simulations that enabled the development of transfer functions aimed at reducing computational time and increasing the flexibility of dose evaluations for any radionuclide with known particle emission spectra. This method allows updating the Q A and Q B values to account for future data evolutions (decay data, fluence-to-dose conversion coefficients) and standardizing the calculation of regulation limits across all referenced radionuclides and scenarios related to external exposure. The transfer functions are established using three Monte Carlo simulation codes—FLUKA, Geant4, and MCNP—and address the previous limitations of the 'Q system', reflecting the latest International Commission for Radiation Protection recommendations and improvements in calculation techniques. The results of the WG show consistent agreement across the codes, with minor discrepancies observed at low primary energies due to statistical uncertainties and different handling of stopping power for electrons/positrons in the codes. This revised approach aligns with current standards and recommendations, ensuring that the radiological consequences of transport accidents are acceptable for the new A 1 and A 2 limits from a radiological protection perspective.

61 RADIATION PROTECTION AND DOSIMETRY↗

Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels (2019 State of Technology)

Each year, the DOE Bioenergy Technologies Office (BETO) assesses progress in their research and development efforts toward sustainable production of renewable fuels. Technical and cost targets were previously established for the wet waste hydrothermal liquefaction and biocrude upgrading pathway and summarized in a design report. The present report summarizes the research and associated techno-economic analysis (TEA) in support of the 2019 state of technology (SOT) assessment for this pathway. Data from Pacific Northwest National Laboratory’s Conversion hydrothermal liquefaction (HTL) program for wet waste was used to update the pathway techno-economic analysis (TEA) for the fiscal year 2019 State of Technology (2019 SOT). An overview of the current process model, experimental data and plant economics for the SOT is presented.

09 BIOMASS FUELS↗