Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

THE COMPONENT TEST FACILITY – A NATIONAL USER FACILITY FOR TESTING OF HIGH TEMPERATURE GAS-COOLED REACTOR (HTGR) COMPONENTS AND SYSTEMS

The Next Generation Nuclear Plant (NGNP) and other High-Temperature Gas-cooled Reactor (HTGR) Projects require research, development, design, construction, and operation of a nuclear plant intended for both high-efficiency electricity production and high-temperature industrial applications, including hydrogen production. During the life cycle stages of an HTGR, plant systems, structures and components (SSCs) will be developed to support this reactor technology. To mitigate technical, schedule, and project risk associated with development of these SSCs, a large-scale test facility is required to support design verification and qualification prior to operational implementation. As a full-scale helium test facility, the Component Test facility (CTF) will provide prototype testing and qualification of heat transfer system components (e.g., Intermediate Heat Exchanger, valves, hot gas ducts), reactor internals, and hydrogen generation processing. It will perform confirmation tests for large-scale effects, validate component performance requirements, perform transient effects tests, and provide production demonstration of hydrogen and other high-temperature applications. Sponsored wholly or in part by the U.S. Department of Energy, the CTF will support NGNP and will also act as a National User Facility to support worldwide development of High-Temperature Gas-cooled Reactor technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using Systems Analysis to Guide Fuel Cycle Development

Systems Analysis is an important tool for guiding the development of an advanced fuel cycle. The process of nuclear research, development, and demonstration takes a relatively long time, and can require a significant amount of expensive testing. It is beneficial to minimize the amount of testing required, and systems analysis should be used as one of the first steps in downselecting technologies and streamlining the requirements. This paper discusses the application of systems analysis to advanced fuel cycle development, including using it is a tool for initial investigation of sets of technology options, as well for planning timelines for testing and downselection amongst sets of technology options. The use of Technology Readiness Levels (TRLs) in fuel cycle development is explained, together with the connection between TRLs and systems analysis via requirements development. TRLs applied to transmutation fuel development is used as an example; transmutation fuel development, including testing and qualification, is generally considered to be the most time-intensive process, from a technical point of view, in fuel cycle development, and can be the deciding factor in determining the shortest time possible for implementing an advanced fuel cycle. Using systems analysis to inform technology readiness levels provides a disciplined and informed process for advanced fuel cycle development.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The new ECR charge breeder for the Selective Production of Exotic Species project at INFN—Laboratori Nazionali di Legnaro

The Selective Production of Exotic Species (SPES) project is an ISOL facility under construction at Istituto Nazionale di Fisica Nucleare–Laboratori Nationali di Legnaro (INFN-LNL). 1+ radioactive ions, produced and extracted from the target-ion-source system, will be charge bred to high charge states by an ECR charge breeder (SPES-CB): the project will adopt an upgraded version of the PHOENIX charge breeder, developed since about twenty years by the Laboratoire de Physique Subatomique et de Cosmologie (LPSC). The collaboration between LNL and LPSC started in 2010 with charge breeding experiments performed on the LPSC test bench and led, in June 2014, to the signature of a Research Collaboration Agreement for the delivery of a complete charge breeder and ancillaries, satisfying the SPES requirements. Important technological aspects were tackled during the construction phase, as, for example, beam purity issues, electrodes alignment, and vacuum sealing. This phase was completed in spring 2015, after which the qualification tests were carried out at LPSC on the 1+/q+ test stand. This paper describes the characteristics of the SPES-CB, with particular emphasis on the results obtained during the qualification tests: charge breeding of Ar, Xe, Rb, and Cs satisfied the SPES requirements for different intensities of the injected 1+ beam, showing very good performances, some of which are “best ever” for this device.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modeling and Qualification of a Modified Emission Unit for Radioactive Air Emissions Stack Sampling Compliance

A planned laboratory space and exhaust system modification to the Pacific Northwest National Laboratory Material Science and Technology Building indicated a new evaluation of the mixing at the air sampling system location would be required for compliance to ANSI/HPS N13.1-2011. The modified exhaust system would add a third fan thereby increasing the overall exhaust rate out the stack thus voiding the previous mixing study. Prior to modifying the radioactive air emissions exhaust system, a three-dimensional computational fluid dynamics computer model was used to evaluate the mixing at the sampling system location. Modeling of the new original three-fan system indicated that not all mixing criteria could be met. A second modeling effort was conducted with the addition of an air blender downstream of the confluence of the three fans which then showed satisfactory mixing results. The final installation included an air blender, and the exhaust system underwent full-scale tests to verify velocity, cyclonic flow, gas, and particulate uniformity. The modeling results and those of the full-scale tests show agreement between each of the evaluated criteria. The use of a computational fluid dynamics code was an effective aid in the design process and allowed the sampling system to remain in its original location while still meeting the requirements for sampling at a well-mixed location.

atmospheric emissions, air monitoring, environment↗

Radiation Tolerant Electronics and Digital Processing for the Phase-I Trigger Readout Upgrade of the ATLAS Liquid Argon Calorimeters

The high luminosities of L > 10{sup 34} cm{sup -2}s{sup -1} at the Large Hadron Collider (LHC) at CERN produce an intense radiation environment that the detectors and their electronics must withstand. The ATLAS detector is a multi-purpose apparatus constructed to explore the new particle physics regime opened by the LHC. Of the many decay particles observed by the ATLAS detector, the energy of the created electrons and photons is measured by a sampling calorimeter technique that uses Liquid Argon (LAr) as its active medium. The front end (FE) electronic readout of the ATLAS LAr calorimeter located on the detector itself consists of a combined analog and digital processing system. In order to exploit the higher luminosity while keeping the same trigger bandwidth of 100 kHz, higher transverse granularity, higher resolution and longitudinal shower shape information will be provided from the LAr calorimeter to the Level-l trigger processors. New trigger readout electronics have been designed for this purpose, which will withstand the radiation dose levels expected for an integrated luminosity of 3000 fb{sup -1} during the high luminosity LHC (HL-LHC), which is well above the original LHC design qualifications. (authors)

43 PARTICLE ACCELERATORS↗

Oak Ridge National Laboratory Official TM Cover: Development and Qualification of Tungsten Reference Materials for LA-ICP-MS

Reference materials have been developed to provide areal density measurements of tungsten that is deposited on graphite when using laser ablation inductively coupled plasma mass spectrometry (LA-ICP-MS). Several reference materials of varying areal densities have been produced using a magnetron sputtering, thin film deposition technique. With multiple reference materials that have varying areal densities, a calibration curve has been developed for translating the detector response of an ICP-MS into a quantitative measurement. These results provide the opportunity to make calibrated comparisons across graphite samples that were exposed to tungsten transport experiments for nuclear fusion research. In addition, these methods may be applied to provide individual areal density measurements for the five unique isotopes of tungsten. It is found that areal density measurements via LA-ICP-MS agree with characterization for the same samples when using the more traditional Rutherford backscattering ion beam technique. Qualification of these reference materials was completed using ion beam laboratories at the University of Tennessee, Knoxville and Massachusetts Institute of Technology, and Sandia National Laboratory.

36 MATERIALS SCIENCE↗

Orbiter OMS and RCS technology

Orbiter Orbital Maneuver Subsystem (OMS) and Reaction Control Subsystem (RCS) tankage has proved to be highly successful in shuttle flights on-orbit propellant transfer tests were done. Tank qualification tests along with flight demonstrations were carried out future uses of storable propellants are cited.

Boudreaux, R. A.↗

The high temperature superconductivity space experiment

The history and the current status of the high temperature superconductivity space experiment (HTSSE) initiated in 1988 are briefly reviewed. The goal of the HTSSE program is to demonstrate the feasibility of incorporating high temperature superconductivity (HTS) technology into space systems. The anticipated payoffs include the development of high temperature superconductor devices for space systems; preparation and space qualification of a cryogenically cooled experimental package containing HTS devices and components; and acquisition of data for future space experiments using more complex HTS devices and subsystems. The principal HTSSE systems and devices are described.

Webb, Denis C.↗

Pure Water From a Pure Genius

Ammonium perchlorate is widely used throughout the aerospace, munitions, and pyrotechnics industries as a primary ingredient in solid rocket and missile propellants, fireworks, and explosive charges. This highly soluble salt has tainted soils and water sources all over the world, and is believed to be an endocrine disrupter, adversely affecting the growth patterns of a fetus or a young child. UMPQUA Research Company (URC), once a small drinking water testing laboratory and a research and development contractor for NASA's manned spaceflight applications, has evolved to become a leader in water purification and analysis. With a total of 11 patents issued for new technologies created by URC under NASA SBIR contracts and a 25-year commitment to water recycling, the company clearly possessed the qualifications necessary to tackle the presence of perchlorate in water. An SBIR contract with NASA's Marshall Space Flight Center that concentrated on the stringent water quality requirements of long-term, manned spaceflight was the source for URC's process and catalyst to facilitate the destruction of perchlorate and nitrate in water. URC licensed the rights of its unique reduction reaction process to Calgon Carbon Corporation for use with the company's perchlorate/nitrate remediation process, otherwise known as ISEP(R).

Source record↗

COBRA Main Engine Project

The COBRA (CO-Optimized Booster for Reusable Applications) project include the following: 1. COBRA main engine project team. 2. COBRA and RLX cycles selected. 3. COBRA proto-type engine approach enables mission success. 4. COBRA provides quick, low cost demo of cycle and technologies. 5. COBRA cycle I risk reduction supports. 6. Achieving engine safety. 6. RLX cycle I risk reduction supports. 7. Flight qualification. 9. Life extension engine testing.

Snoddy, Jim↗

Development, Qualification and Integration of the Optical Fiber Array Assemblies for the Lunar Reconnaissance Orbiter

The NASA Goddard Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufacturing at GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and LIDAR. Described here is an account of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO.

Ott, Melanie N.↗

Pre-Demonstration Development of Controlled-Release Corrosion Inhibitors and Healing Agents as Alternatives to Hexavalent Chromium

This Limited Scope Study was directed to achieve the following objectives: (1) Scale-up of materials that can meet MIL-PRF-23377 (solvent-based primer). (2) Provide evidence of resistance to aircraft alkaline cleaners and de-icing fluids. (3) Provide formulation for initial ecological and toxicity screening. (4) Submit an interim report that will provide the basis for a future ESTCP (the Dept. of Defense's (DoD's) Environmental Security Technology Certification Program) demonstration effort.The encapsulation procedure for two corrosion inhibitors was scaled up from lab scale to 2.0 kilograms. This scale will accommodate high volume production of coatings with encapsulated corrosion inhibitors for large surface areas during a follow-on ESTCP demonstration effort. Test results provided evidence of resistance to alkaline cleaners and aircraft de-icing fluids and compliance with MIL-PRF-23377. All the MIL-PRF-23377 requirements were met with the exception of the adhesion requirement, in top coated panels, and the flexibility requirement. Work on solving these two problems will be done prior to validation and demonstration of the technology. An initial ecological and toxicity screening identified several factors that were not critical to the acceptance of the encapsulated corrosion inhibitor. This new technology will lead to environmentally friendly alternatives to hexavalent chromium that will enable DoD to protect its assets. Field demonstration, licensing, qualification, and commercialization will allow its real world utilization. Abstract for Appendix A. Toxicology Report: Corrosion controls a significant problem for military equipment. Many surface treatment materials currently in use on items of military or aerospace materiel contain chromium (VI) as a component, a source of significant human health and environmental hazard. The formulation under evaluation contains no chromium. Most of the proposed components are low to moderate toxicity and are not a significant concern. Two of the formulation components are associated with some cancer hazard - 2-mercaptobenzothiazole and formaldehyde, but both find widespread use in industry and additional investigation is not required for this project.

Calle, Luz Marina↗

Pre-demonstration Development of Controlled-Release Corrosion Inhibitors and Healing Agents as Alternatives to Hexavalent Chromium

This Limited Scope Study was directed to achieve the following objectives:(1) Scale-up of materials that can meet MIL-PRF-23377 (solvent-based primer).(2) Provide evidence of resistance to aircraft alkaline cleaners and deicing fluids.(3) Provide formulation for initial ecological and toxicity screening.(4) Submit an interim report that will provide the basis for a future ESTCP demonstration effort.The encapsulation procedure for two corrosion inhibitors was scaled up from lab scale to 2.0 kg. This scale will accommodate high volume production of coatings with encapsulated corrosion inhibitors for large surface areas during a follow on ESTCP demonstration effort.Test results provided evidence of resistance to alkaline cleaners and aircraft deicing fluids and compliance with MIL-PRF-23377. All the MIL-PRF-23377 requirements were met with the exception of the adhesion requirement, in top coated panels, and the flexibility requirement. Work on solving these two problems will be done prior to validation and demonstration of the technology. An initial ecological and toxicity screening identified several factors that were not critical to the acceptance of the encapsulated corrosion inhibitor. This new technology will lead to environmentally friendly alternatives to hexavalent chromium that will enable DoD to protect its assets. Field demonstration, licensing, qualification, and commercialization will allow its real world utilization.

Calle, L. M.↗

Pre-Demonstration Development of Controlled-Release Corrosion Inhibitors and Healing Agents as Alternatives to Hexavalent Chromium

This Limited Scope Study was directed to achieve the following objectives: (1) Scale-up of materials that can meet MIL-PRF-23377 (solvent-based primer). (2) Provide evidence of resistance to aircraft alkaline cleaners and deicing fluids. (3) Provide formulation for initial ecological and toxicity screening. (4) Submit an interim report that will provide the basis for a future ESTCP demonstration effort. The encapsulation procedure for two corrosion inhibitors was scaled up from lab scale to 2.0 kg. This scale will accommodate high volume production of coatings with encapsulated corrosion inhibitors for large surface areas during a follow on ESTCP demonstration effort. Test results provided evidence of resistance to alkaline cleaners and aircraft deicing fluids and compliance with MIL-PRF-23377. All the MIL-PRF-23377 requirements were met with the exception of the adhesion requirement, in top coated panels, and the flexibility requirement. Work on solving these two problems will be done prior to validation and demonstration of the technology. An initial ecological and toxicity screening identified several factors that were not critical to the acceptance of the encapsulated corrosion inhibitor. This new technology will lead to environmentally friendly alternatives to hexavalent chromium that will enable DoD to protect its assets. Field demonstration, licensing, qualification, and commercialization will allow its real world utilization.

Alternatives to Hexavalent Chromium↗

Pre-Demonstration Development of Controlled-Release Corrosion Inhibitors and Healing Agents as Alternatives to Hexavalent Chromium

This Limited Scope Study was directed to achieve the following objectives: (1) Scale-up of materials that can meet MIL-PRF-23377 (solvent-based primer). (2) Provide evidence of resistance to aircraft alkaline cleaners and deicing fluids. (3) Provide formulation for initial ecological and toxicity screening. (4) Submit an interim report that will provide the basis for a future ESTCP demonstration effort. The encapsulation procedure for two corrosion inhibitors was scaled up from lab scale to 2.0 kg. This scale will accommodate high volume production of coatings with encapsulated corrosion inhibitors for large surface areas during a follow on ESTCP demonstration effort. Test results provided evidence of resistance to alkaline cleaners and aircraft deicing fluids and compliance with MIL-PRF-23377. All the MIL-PRF-23377 requirements were met with the exception of the adhesion requirement, in top coated panels, and the flexibility requirement. Work on solving these two problems will be done prior to validation and demonstration of the technology. An initial ecological and toxicity screening identified several factors that were not critical to the acceptance of the encapsulated corrosion inhibitor. This new technology will lead to environmentally friendly alternatives to hexavalent chromium that will enable DoD to protect its assets. Field demonstration, licensing, qualification, and commercialization will allow its real world utilization.

Alternatives to Hexavalent Chromium, Controlled Re↗

On the extension of modern best-estimate plus uncertainy methodologies to future fast reactor and advanced fuel licensing - initial evaluation of issues

Closing the fuel cycle is the major technical challenge to expanding nuclear energy to meet the world's need for benign, environmentally safe electrical power. Closing the fuel cycle means getting the maximum amount of energy possible out of uranium fuel while in turn minimizing the amount of high-level waste that must be stored. DOE's Advance Fuel Cycle Initiative (AFCI) program addresses this challenge by recycling the transuranic (TRU) isotopes contained in spent nuclear fuel; recycling, in turn, minimizes the amount of high-level waste that would require storage in repositories. Developing new fuels and the plants that burn them is a lengthy and expensive process, typically spanning a period of two decades from concept to final licensing. A unique challenge to meeting the AFCI objectives in this area is that the experimental database is seriously incomplete. As such, using a traditional, heavily empirical approach to develop and qualify fuels and plant operation over the operational conditions of a AFCI plant will be very challenging, if not impossible, within the expected schedule and budgetary constraints. To address this concern AFCI has launched an advanced modeling and simulation (M&S) approach to revolutionize fuel development and fast reactor design. This new approach is predicated upon transferring the recent advances in computational sciences and computer technologies into the development of these program elements. The licensing process that has historically been used by the NRC for fuels qualification is based upon using a large body of experimental work to qualify and license a new fuel. If a modeling and simulation approach with more directed experimentation is to be considered as an alternative approach for licensing, then a framework needs to be developed that can be agreed to with the NRC early in the developmental process. The use of modeling and simulation as a means of demonstrating that a design can meet NRC requirements is not new and has precedence in the NRC. The method is generically referred to as a 'Best Estimate plus Uncertainty' approach (BE+U), since the goal of the methodology is to compare the model value (best estimate) plus any uncertainty to a figure of merit like cladding temperature. The challenges for extending the BE+U (1) method for fuel qualification for an Advanced Reactor Fuel are driven by: schedule, the need for data, the data sufficiency, the identification of important phenomenon, the process of validation (with focus on the multi-scale model), and the need to produce and extended best estimate plus uncertainty methodology. This paper examines these issues an offers up a proposed set of methods that extend the current BE+U methodology address most if not all of these challenges.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AREVA Steam Cycle High Temperature Gas-Cooled Reactor Development and Deployment Plan - 18684

The development and deployment timeline for the AREVA SC-HTGR is among the shortest of all Generation IV reactor technologies. Once demonstrated, the SC-HTGR enters an expanding marketplace beyond electricity generation. This enables industrial growth that is today solely captive to fossil fuels, primarily natural gas supply. The SC-HTGR plant will be a hedge that insulates a wide range of process industries from fossil fuel price and supply volatility in coming decades when the SC-HTGR plant design is ready for deployment. Similar to existing light water reactors, the SC-HTGR is largely immune to fuel price swings for its expected 60 year operating life cycle. Approximately 70% of the SCHTGR plant energy cost is driven by the initial capital investment with fuel being less than 20%. This is entirely the opposite of natural gas fueled power plants where about 70% of the energy cost is directly tied to the cost and availability of fuel and the potential volatility this brings with it over a plant life cycle that could span several decades. This paper details the development and deployment strategy envisioned by AREVA for the SC-HTGR plant. The development phase includes completion of the full scale reactor module design and licensing, build and demonstrate the first commercial scale module, get design certification, and launch the commercial fleet deployment. The development plan takes full advantage of a) a large body of successful pre-application licensing interactions with the NRC under the DOE NGNP project, b) ongoing experiments and test results accumulated through the TRISO particle fuel qualification and nuclear grade graphite characterization R and D activities conducted in the U.S. and internationally, and c) operation of several small scale technology demonstration facilities and large scale commercial design projects. The abundance of the historic HTGR reactor technology demonstration projects provides a high degree of confidence that sufficient technical information is available to begin FOAK plant engineering and licensing followed by commercial demonstration of the first reactor module within a next decade. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Postoptimality Analysis in the Selection of Technology Portfolios

This slide presentation reviews a process of postoptimally analysing the selection of technology portfolios. The rationale for the analysis stems from the need for consistent, transparent and auditable decision making processes and tools. The methodology is used to assure that project investments are selected through an optimization of net mission value. The main intent of the analysis is to gauge the degree of confidence in the optimal solution and to provide the decision maker with an array of viable selection alternatives which take into account input uncertainties and possibly satisfy non-technical constraints. A few examples of the analysis are reviewed. The goal of the postoptimality study is to enhance and improve the decision-making process by providing additional qualifications and substitutes to the optimal solution.

prioritization↗