Search NASA⌕ Search

SEARCH · Search NASA

Results for “configuration management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Continuous Test and Transition Infrastructure for Quantum Networking for Science Complex

We propose a network architecture with a separate quantum dataplane and a conventional control plane: (a) Quantum Data Plane: The Quantum Data plane consists of links of dark fibers connecting quantum switches and repeaters, which in turn, connect to quantum computers, memory and sensors. Since the current reach is limited to local areas, it will begin as a collection of site networks at laboratories, (b) Conventional Control Plane: The Control plane provides management access to quantum devices for configuration and provisioning via control nodes with firewall and encryption capabilities. Continuous Test and Transition Infrastructure: We propose an infrastructure with a control plane connecting multiple sites via encrypted tunnels over conventional networks consisting of the following: (a) Site Quantum Networks: Individual site networks supported by their fiber plants connect laboratories that house and connect to their quantum devices for testing and interoperability.(b) Site Control Planes: Sites are connected over individual control planes with control hosts with Software Defined Networking capabilities, which can be peered with other networks via ESnet.(c) Progressive Expansion: Initially, sites will develop individual data planes with their specific quantum devices and fiber connections, and mechanisms to interface with conventional networks. They progressively expand and interconnect, under a wide-area ecosystem of peered control planes for device testing, interoperability development and roll off into production environments.

Rao, Nageswara S.↗

Techniques for controlling charging and/or discharging of batteries using a tanks-in-series model

In some embodiments, a battery management system is provided. The battery management system comprises a connector for electrically coupling a battery to the battery management system, at least one sensor configured to detect a battery state, a programmable chip configured to control at least one of charging and discharging of the battery, and a controller device. The controller device is configured to receive at least one battery state from the at least one sensor; provide the at least one battery state as input to a tanks-in-series model that represents the battery; and provide at least one output of the tanks-in-series model to the programmable chip for controlling at least one of charging and discharging of the battery.

25 ENERGY STORAGE↗

Evolutionary Space Station Guidance Navigation and Control (GN/C) study

The guidance, navigation, and control (GN&C) techniques and equipment to support evolutionary space station concepts were analyzed. Simulations of the evolutionary space station configurations and operational concepts were conducted to analyze the attitude control, reboost, and traffic management accommodation requirements. A summary of the mission concepts, space station configurations, simulation results, and the impact on the baseline GN&C systems are presented.

Kennedy, Jerry↗

Predictive valve control system

A pressure control system may include a plurality of inflatable objects, each of the inflatable objects having a respective pressure sensor and a respective inflation valve, wherein each of the inflation valves has a behavior profile predictive of an amount of current used by the valve when operated. A valve controller of the system may have a pressure management circuit that receives information from the pressure sensors and is configured to automatically maintain a respective selected pressure in each of the inflatable objects by issuing commands to operate the inflation valves. An electrical current management circuit of the valve controller may be configured to predict, based on the valve behavior profiles, what effect the command would have on a total current usage, when executed, and automatically prevent any command that would cause the total current usage to exceed a maximum allowable current.

Piraner, Alexander↗

sUAS Ground Control Station Capabilities Impact on Fleet Management

Future Small Uncrewed Aerial Systems (sUAS) missions will require multiple operators to collaborate and manage large fleets of highly automated vehicles. It is critical that these operators maintain the necessary situational awareness to modify vehicle missions if/when unexpected situations arise in the operating environment. It has been suggested that highly automated vehicle capabilities can lead to reducing the capabilities given to operators to modify/direct vehicle missions. This paper explores various Ground Control Station (GCS) capabilities configurations and their impact on sUAS fleet management. Results show that a GCS with a combination of manual and automated capabilities allowed participants to make more effective decisions while maintaining workload and response times similar to that of a GCS with only automated capabilities.

sUAS↗

Let your fingers do the walking: The projects most invaluable tool

The barrage of information pertaining to the software being developed for a project can be overwhelming. Current status information, as well as the statistics and history of software releases, should be 'at the fingertips' of project management and key technical personnel. This paper discusses the development, configuration, capabilities, and operation of a relational database, the System Engineering Database (SEDB) which was designed to assist management in monitoring of the tasks performed by the Network Control Center (NCC) Project. This database has proven to be an invaluable project tool and is utilized daily to support all project personnel.

Zirk, Deborah A.↗

SSFF Health Management Analysis Report. Part 2: Proof of Concept

In this Proof of Concept analysis on SSFF Health Management the following area was described: the Gas Distribution Subsystem (GDS) was studied and evaluated utilizing the PDR Configuration and with respect to the design features encompassing Health Management (HM) aspects outlined in the Generic Handbook. From the results of this study, it was found that there is a definite need for coordinating measurements within and between the subsystems that will ensure that Functional Failures are properly revealed and substantiated as valid by other measurements, even those from other interfacing subsystems.

Wilson, L.↗

A feasibility study: California Department of Forestry and Fire Protection utilization of infrared technologies for wildland fire suppression and management

NASA's JPL has completed a feasibility study using infrared technologies for wildland fire suppression and management. The study surveyed user needs, examined available technologies, matched the user needs with technologies, and defined an integrated infrared wildland fire mapping concept system configuration. System component trade-offs were presented for evaluation in the concept system configuration. The economic benefits of using infrared technologies in fire suppression and management were examined. Follow-on concept system configuration development and implementation were proposed.

Nichols, J. D.↗