Intelligent Utility Operator Training Platform
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.
An array of wave energy converter (WEC) devices has variations in power output due to the chaotic nature of the waves. Eliminating or mitigating the power fluctuations is important for reducing the integration impacts of WEC plants in both distribution and transmission grids, and in standalone isolated power systems. Reduced variability of WEC-generated power in combination with energy storage or power management control at each WEC and at the array level will help increasing hosting capacity of distribution feeders for this type of variable renewable generation, and minimization of electric losses. To reduce risks and risk perception, gain key stakeholder acceptance, and enable developers to design effective and compatible energy plants with arrays of WEC devices, it requires the use of modeling tools to simulate the resource environment, device dynamics, utility power system response, as well as the development of an interface for an array controller. The project will create a publicly accessible numerical modeling framework to empower the wave energy sector to design projects of various scales (kW-100s MW), which are optimized on a plant performance basis and are compatible with different power systems and wave conditions. The framework will integrate with WEC-Sim, a wave environment model (SWAN-FUNWAVE), as well as established relevant electrical analysis tools, to model the grid system and interconnection, and optimize power output and power management for the WEC array.
By the late 1990s, the Internet was adequately equipped to move vast amounts of data between HPC (High Performance Computing) systems, and efforts were initiated to link together the national infrastructure of high performance computational and data storage resources together into a general computational utility 'grid', analogous to the national electrical power grid infrastructure. The purpose of the Computational grid is to provide dependable, consistent, pervasive, and inexpensive access to computational resources for the computing community in the form of a computing utility. This paper presents a fully distributed view of Grid usage accounting and a methodology for allocating Grid computational resources for use on a Grid computing system.
The growing adoption of distributed energy resources (DERs) like battery energy storage systems and roof top solar/PV and the rapid penetration of electric vehicles (EVs), the electric grid is undergoing a major transformation with elevated stress on legacy grid assets. Despite a lot of expenditure to address these challenges, both in dollars and manpower, utilities have not been able to receive the value that was promised. The gains have been most visible at the transmission and substation level, especially where the main objective was improving operational and economic efficiency for the utility. Improving visibility and control at a few select points enhances the existing and established paradigm of centralized command and control. With changing load patterns, load types and the overall transition to an “active grid”, the centralized control and coordination paradigm gets challenged. To address the challenges, a new architecture and mechanism is needed, one that supports decentralized control and decision making, extracting value streams at the grid edge, particularly as the changes are fueled by transitions occurring in the distribution system. To address this, a communications and data processing platform, “GAMMA” was developed and demonstrated through the project. At the heart of the platform, are distributed, intelligent edge nodes with sensing and compute capabilities, that can record and analyze information locally. They are embedded in sensors and actuators specific to different distribution system applications. Phase 1 of the project focused on developing novel sensor technology that can be used for monitoring utility pole top distribution transformers. The sensors were designed with the objective of being low-cost, communicating with the GAMMA cloud using novel “delay-tolerant” networking using Bluetooth and a secure mobile application. They were non-intrusive in nature so that they can be installed quickly in the field, resulting in overall low cost of deployment and operations. Following the successful completion of Phase 1, the team manufactured 100 units for a field demonstration in Phase 2. The field demonstration was carried out on two real feeder systems with the local utility partner. In total, 100 sensors were installed and operated over a period of 6 months in the state of Georgia. The platform is operational end to end, with the cloud infrastructure deployed on a distributed, serverless environment that can serve multiple data streams, an analytics engine and a portal to securely view the data from multiple assets. The data collected through the GAMMA Mobile Phone app showcased the viability of the novel delay tolerant networking architecture, and the data processing algorithms developed through the course of the project, were successful in extracting important information about the overall network, improving the utility’s visibility and situational awareness in the distribution feeder.
Review of the FY20 and FY21 progress for the Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC) project. GEMINI-XFC will use first-of-a-kind integrated high-fidelity grid and transport modeling to identify effective pathways for widespread electrification, to design and evaluate integrated vehicle-grid control schemes, and to optimize electric vehicle integration at a full regional scale with individual customer resolution.
Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.
Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.
The electrical distribution landscape is rapidly transforming due to the proliferation of distributed energy resources (DERs) such as solar panels, wind turbines, battery storage systems, combined heat and power units, and electric vehicles, introducing variability and uncontrollability that traditional grid operators are ill-equipped to manage. This transformation is further accelerated by advancements in Information and Communication Technology infrastructure that connects control centers with end devices, demanding automation and a deeper understanding of new technologies by utility personnel. Advanced grid control techniques using system-level optimization, Artificial Intelligence, and Machine Learning at the enterprise level and distributed level are evolving to address these issues. There is also an opportunity to utilize the enormous data created by these new DER technologies in the grid. Advanced Distribution Management Systems (ADMS) and Distributed Energy Resource Management Systems (DERMS) are critical in addressing these challenges by automating grid operations and enhancing reliability. Given the relatively recent development of ADMS and DERMS, and the still relatively low level of ADMS and DERMS deployment in the industry, there is a notable deficiency in the comprehensive understanding of the challenges and benefits associated with these new technologies, especially with their complementary natures and integration architectures. This paper aims to bridge the knowledge gap in ADMS and DERMS integration, presenting three distinct integration architectures currently available, and discussing the challenges and benefits of each architecture to guide utilities, industry professionals, and researchers in optimizing grid management and decision-making processes for a resilient and efficient energy future.
The purpose of this project is to provide a software platform that gives utility companies the capability to seamlessly dispatch legacy devices (at both the distribution and subtransmission levels) and distributed energy resources (DERs) to achieve system-wide performance and reliability targets–such as minimizing loss, reducing voltage violation, and corresponding imbalance–for extreme solar futures with well over 100% (capacity) penetrations.
As the operation of the electric grid continues to become more automated, the associated increase in sensors and systems places increasing demands for fast response, cybersecure communications. This paper presents a review of advances underway in communications and networking technologies that may be implemented to meet these future electric grid requirements.
Reliability and resilience are critical concerns for distributed generation (DG) at the rural electric level. The integration of renewable energy sources, such as small-scale hydroelectric distributed generators (hydro DGs), introduces operational challenges, particularly regarding aging infrastructure and grid stability. Artificial Intelligence (AI)-driven Machine Learning (ML) models and applications of Large Language Models (LLMs) offer promising solutions for optimizing DG operations and enhancing resilience. This paper explores AI-based models for improving efficiency, fault resolution, and outage mitigation in small-scale hydro DGs. Furthermore, it highlights the development of a centralized, AI-powered information portal for rural electric cooperatives and municipalities. The research evaluates hydro DG plant models and discusses the applicability of AI-powered question-answering tools for real-time operations, focusing on statistical data, load flow, voltage regulation, and generation power. The findings demonstrate AI’s potential to transform DG management to ensure greater stability and resilience in rural electric grids.
Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.
The Progressing Analysis of Variable Electric Rates (PAVER) study analyzed the impact of a range of time-varying electric rates on the performance of a regional electric grid and the resulting costs for participating and non-participating customers. This analysis leveraged and extended the work of PNNL’s Distribution System Operator with Transactive (DSO+T) study. Five different rate designs were included: a flat volumetric energy charge, a typical Time of Use (TOU) rate, a dynamic energy (DE) rate (based on wholesale locational marginal prices), a dynamic energy and capacity (DE+C) rate, and, finally, a Block and Swing (B&S) rate that billed customers based on their average load profile at constant pricing, but used the DE+C dynamic price for load deviations from their average profile. These rates were analyzed in a large-scale co-simulation of an entire regional grid with a customer population representative of the current state. A large fraction (80%) of residential and commercial customers were assumed to participate in these time-varying rates with automatically controlled HVAC, water heaters, electric vehicles, and batteries. This study assumed no industrial sector participation. The DE and DE+C rates saw system peak loads reduced by 6-7%, while the large participation in the TOU rate case saw a significant rebound effect and a resulting peak load increase of >5%. The impacts to the annual and peak system demand impacted system wholesale prices and the overall grid operating costs. This cost structure determined the revenue needed to be collected from customers by each rate design. Participating customers on the DE and DE+C rates (located in one of the modeled DSOs) saw reductions in average annual electricity bills of 11-17% with average increases in monthly bill variation of no more than 13%. At such high participation levels, TOU customers saw 10% higher average annual bills (due to system-wide rebound effects) and average increased monthly bill variation of 16%. Residential owners of large flexible loads (such as electric vehicles) saw larger bill savings (17-20%) when on a fully dynamic rate. The presence of on-site generation (such as rooftop solar) did not appear to appreciably change customer outcomes. Customers on the Block and Swing rate did see 6% lower monthly bill variation (as intended) than the flat rate case, but at the expense of appreciable bill savings, which were only 3%, comparable to the savings seen by non-participants. Given this finding we recommend that additional research be conducted into how best various bill protection mechanisms can balance minimizing customer bill variation with providing financial incentives commensurate with the flexibility customers provide. We also recommend that customer outcomes be explored across a range of regions using current actual customer and system cost data.
Insufficiencies in charging facilities limit the broad application of electric vehicles (EVs). In addition, EV can hardly represent a green option if its electricity primarily depends on fossil energy. Considering these two problems, this paper studies a battery swapping-charging system based on wind farms (hereinafter referred to as W-BSCS). In a W-BSCS, the wind farms not only supply electricity to the power grid but also cooperate with a centralized charge station (CCS), which can centrally charge EV batteries and then distribute them to multiple battery swapping stations (BSSs). The operational framework of the W-BSCS is analyzed, and some preprocessing technologies are developed to reduce complexity in modeling. Then, a joint optimal scheduling model involving a wind power generation plan, battery swapping demand, battery charging and discharging, and a vehicle routing problem (VRP) is established. Then a heuristic method based on the exhaustive search and the Genetic Algorithm is employed to solve the formulated NP-hard problem. Numerical results verify the effectiveness of the joint optimal scheduling model, and they also show that the W-BSCS has great potential to promote EVs and wind power.
The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.
The drastic price reduction in variable renewable energy, such as wind and solar, coupled with the ease of use of smart technologies at the consumer level, is driving dramatic changes to the power system that will significantly transform how power is made, delivered, and used. Distributed energy resources (DERs)—which can include solar photovoltaic (PV), fuel cells, microturbines, gensets, distributed energy storage (e.g., batteries, ice storage), and new loads (e.g., electric vehicles (EVs), light-emitting diode (LED) lighting, smart appliances, and electric heat pumps)—are being added to electric grids and causing bidirectional power flows and voltage fluctuations that can impact optimal control and system operation. Residential solar installations, customer battery systems, and EVs are all seeing rapid increases in deployments. With DER seeing such increased use, it is not unreasonable to imagine a residential electricity customer having at least five controllable DERs. In future electric grids, as more DERs are integrated, the number of active control points will be too much for current control approaches to effectively manage.
Both the frequency and intensity of extreme weather events have been trending higher in recent years, leading to significant infrastructure damage in the electric grid. The impact of these extreme weather events is desired to be analyzed and quantified to help transmission and distribution system operators prepare for and prevent significant damage and subsequent loss of power. In this paper, we develop an approach that models the impact of extreme weather on the grid and identifies the worst impact zone using Q-learning (a reinforcement learning approach). The identification results reveal grid vulnerability to weather events and provide insights for system operators to help achieve optimal resource allocation and crew dispatch to minimize the adverse impacts of extreme weather. Simulation studies are conducted on the IEEE 123-node system to demonstrate the performance of the proposed approach.