Search NASA⌕ Search

SEARCH · Search NASA

Results for “future accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Optimization of transformer ratio and beam loading in a plasma wakefield accelerator with a structure-exploiting algorithm

Plasma-based acceleration has emerged as a promising candidate as an accelerator technology for a future linear collider or a next-generation light source. We consider the plasma wakefield accelerator (PWFA) concept where a plasma wave wake is excited by a particle beam and a trailing beam surfs on the wake. For a linear collider, the energy transfer efficiency from the drive beam to the wake and from the wake to the trailing beam must be large, while the emittance and energy spread of the trailing bunch must be preserved. One way to simultaneously achieve this when accelerating electrons is to use longitudinally shaped bunches and nonlinear wakes. In the linear regime, there is an analytical formalism to obtain the optimal shapes. In the nonlinear regime, however, the optimal shape of the driver to maximize the energy transfer efficiency cannot be precisely obtained because currently no theory describes the wake structure and excitation process for all degrees of nonlinearity. In addition, the ion channel radius is not well defined at the front of the wake where the plasma electrons are not fully blown out by the drive beam. We present results using a novel optimization method to effectively determine a current profile for the drive and trailing beam in PWFA that provides low energy spread, low emittance, and high acceleration efficiency. We parameterize the longitudinal beam current profile as a piecewise-linear function and define optimization objectives. For the trailing beam, the algorithm converges quickly to a nearly inverse trapezoidal trailing beam current profile similar to that predicted by the ultrarelativistic limit of the nonlinear wakefield theory. For the drive beam, the beam profile found by the optimization in the nonlinear regime that maximizes the transformer ratio also resembles that predicted by linear theory. Furthermore, the current profiles found from the optimization method provide higher transformer ratios compared with the linear ramp predicted by the relativistic limit of the nonlinear theory.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

Early Commissioning Experience and Future Plans for the 12 GeV Continuous Electron Beam Accelerator Facility

Jefferson Lab has recently completed the accelerator portion of the 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility. All 52 SRF cryomodules have been commissioned and operated with beam. The initial beam transport goals of demonstrating 2.2 GeV per pass, greater than 6 GeV in 3 passes to an existing experimental facility and greater than 10 GeV in 5-1/2 passes have all been accomplished. These results along with future plans to commission the remaining beamlines and to increase the performance of the accelerator to achieve reliable, robust and efficient operations at 12 GeV are presented.

Spata, Michael F.↗

Jefferson Lab Science: Present and Future

The Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab comprise a unique facility for experimental nuclear physics. Furthermore, this facility is presently being upgraded, which will enable a new experimental program with substantial discovery potential to address important topics in nuclear, hadronic, and electroweak physics. Further in the future, it is envisioned that the Laboratory will evolve into an electron-ion colliding beam facility.

43 PARTICLE ACCELERATORS↗

Analysis of Nb$_3$Sn Accelerator Magnet Training

Nb 3 Sn accelerator magnet technology has made significant progress during the past decades. For the first time, it is planned to be used in a real accelerator. A relatively small number of Nb 3 Sn quadrupoles and dipoles will be installed in the LHC to increase machine luminosity. Although it will prove the possibility of using Nb 3 Sn magnets in real machines, many questions of scaling this technology up remain. One of them is related to slow training of Nb 3 Sn magnets compared to the traditional Nb-Ti accelerator magnets. Since the goal is to operate thousands of Nb 3 Sn magnets in a future post-LHC accelerator, the slow training will affect both the practical design margin and the nominal operation field. Consequently, the cost of the project to reach the design field level is also increased. Furthermore, to improve our understanding of slow magnet training the existing Fermilab data from Nb 3 Sn magnet tests were re-analyzed. A summary of coil training features and correlations with fabrication parameters observed is presented in this paper.

43 PARTICLE ACCELERATORS↗

Modernizing to an AI-Ready Control System

The Accelerator Controls Operations Research Network (ACORN) project will modernize the accelerator control system and upgrade power supplies to enable future operations of the Fermilab Accelerator Complex with megawatt proton beams. By focusing on MLOps, ACORN enables full integration of AI into the control system to allow safe and reliable improvements to accelerator beam operations.

43 PARTICLE ACCELERATORS↗

PIP-II Particle Accelerator

Fermilab’s Proton Improvement Plan II will power the long-term future of the U.S. accelerator-based particle physics program and enable the world’s most powerful high-energy neutrino beamfor the international Deep Underground Neutrino Experiment.

43 PARTICLE ACCELERATORS↗

PIP-II Particle Accelerator

Fermilab’s Proton Improvement Plan II will power the long-term future of the U.S. accelerator-based particle physics program and enable the world’s most powerful high-energy neutrino beam for the international Deep Underground Neutrino Experiment.

43 PARTICLE ACCELERATORS↗

Gradient Limitations in Room Temperature and Superconducting Acceleration Structures

Accelerating gradient is a key parameter of the accelerating structure in large linac facilities, like future Linear Collider. In room temperature accelerating structures the gradient is limited mostly by breakdown phenomena, caused by high surface electric fields or pulse surface heating. High power processing is a necessary procedure to clean surface and improve the gradient. In the best tested X-band structures the achieved gradient is exceed 100 MV/m in of {approx}200 ns pulses for breakdown rate of {approx}10{sup -7}. Gradient limit depends on number of factors and no one theory which can explain all sets of experimental results and predict gradient in new accelerating structure. In paper we briefly overview the recent experimental results of breakdown studies, progress in understanding of gradient limitations and scaling laws. Although superconducting rf technology has been adopted throughout the world for ILC, it has frequently been difficult to reach the predicted performance in these structures due to a number of factors: multipactoring, field emission, Q-slope, thermal breakdown. In paper we are discussing all these phenomena and the ways to increase accelerating gradient in SC cavity, which are a part of worldwide R and D program.

43 PARTICLE ACCELERATORS↗

Evaluation of Data Lake Design for the Accelerator Control System

In this modern world, the user expects faster processing and real-time response to operate accelerator control devices. The existing framework with its infrastructure does not have the ability to satisfy these future needs. Therefore, modernization is required to reach industry standards and develop a modular framework that can provide flexibility and dynamic scalability. The data lake architecture, comprising three layers, ingestion, processing, and data consumption, provides flexibility and scalability to meet current and future demands for the accelerator control system.

Jaikar, Amol [Fermilab]↗

How will PIP-II take Fermilab to the next level?

The PIP-II project (http://pip2.fnal.gov) is an upgrade of Fermilab’s particle accelerator complex and includes the construction of a 215-meter-long linear particle accelerator. PIP-II will become the new heart of the Fermilab accelerator complex. Its high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program. The upgrade will enable Fermilab’s accelerator complex to create the world’s most intense high-energy neutrino beams, which will power the Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). http://www.fnal.gov/dune Want to learn more? Fermilab’s Dr. Don Lincoln tells you all about it.

43 PARTICLE ACCELERATORS↗

PIP-II: the new heart of Fermilab

The PIP-II project http://pip2.fnal.gov is an essential upgrade of Fermilab’s particle accelerator complex and includes the construction of a 215-meter-long linear particle accelerator. It is the first U.S. particle accelerator project with significant contributions from international partners. Research institutions in France, India, Italy and the UK will build major components of the new particle accelerator. PIP-II will become the new heart of the Fermilab accelerator complex. Its high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program. The upgrade will enable Fermilab’s accelerator complex to generate an unprecedented stream of neutrinos—subtle, subatomic particles that could hold the key to understanding the universe’s evolution—by creating the world’s most intense high-energy neutrino beams. This capability positions Fermilab to be the world leader in accelerator-based neutrino research. It enables the scientific program for the international, Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). http://www.fnal.gov/dune

43 PARTICLE ACCELERATORS↗

Jefferson Lab: Present and Future

The Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab (JLab) comprise a unique facility for nuclear physics research whose upgrade is presently underway, with completion expected in 2017. The upgraded facility will accelerate electron beams to 11 GeV for experiments in the existing Halls A, B and C. In addition, a 12 GeV beam can be provided to a new experimental hall, Hall D, to generate a 9 GeV tagged photon beam. This upgrade will enable a new experimental program with substantial discovery potential to address important topics in hadronic, nuclear, and electroweak physics. Further in the future, it is envisioned that the Laboratory will evolve into an electron-ion colliding beam facility (EIC).

Rossi, Patrizia↗

High-brightness picosecond ion beam source based on BNL Terawatt CO 2 laser: Proof-of-principle experiments

Under the continuing DOE support, we have: o assembled the basic experiment setup and then continued expanding it to include diverse diagnostics and to accommodate gas jet targets in addition to metal foils; o conducted an extensive study of our novel laser, significantly enhanced laser beam diagnostics, and improved relevant laser parameters; o turned our experiments into a truly international endeavor with active collaboration of close to 20 researchers in US, UK, and Germany; o conducted the first ever experiments with proton and ion acceleration by lasers interacting with overcritical plasma of gas jets; o for the first time directly observed radiation pressure acceleration of protons, including quasi-monoenergetic spectra promising for future applications; o for the first time directly observed quasi-stable, bubble-like plasma structures that likely evolved from relativistic laser-plasma solitons (post-solitons). Thus, we have confirmed a strong potential of a picosecond TW CO2 laser as a research tool in laser-plasma science and as a promising vehicle for future applications of laser ion acceleration. This has led to apparent increase of the interest in mid-IR laser ion acceleration. In particular, another major research group began extensive proton acceleration experiments with their own CO2 laser at UCLA. As a result, the mechanisms responsible for laser proton acceleration in gas jets have become somewhat clearer. It is also important to note that modest DOE funding played the role of a seed support ensuring the formation of a multinational research team, whose members contributed its time and equipment with value well in excess of that seed amount.

43 PARTICLE ACCELERATORS↗

A nuclear physics program at the Rare Isotope Beams Accelerator Facility in Korea

This paper outlines the new physics possibilities that fall within the field of nuclear structure and astrophysics based on experiments with radioactive ion beams at the future Rare Isotope Beams Accelerator facility in Korea. This ambitious multi-beam facility has both an Isotope Separation On Line (ISOL) and fragmentation capability to produce rare isotopes beams (RIBs) and will be capable of producing and accelerating beams of wide range mass of nuclides with energies of a few to hundreds MeV per nucleon. The large dynamic range of reaccelerated RIBs will allow the optimization in each nuclear reaction case with respect to cross section and channel opening. The low energy RIBs around Coulomb barrier offer nuclear reactions such as elastic resonance scatterings, one or two particle transfers, Coulomb multiple-excitations, fusion-evaporations, and direct capture reactions for the study of the very neutron-rich and proton-rich nuclides. In contrast, the high energy RIBs produced by in-flight fragmentation with reaccelerated ions from the ISOL enable to explore the study of neutron drip lines in intermediate mass regions. The proposed studies aim at investigating the exotic nuclei near and beyond the nucleon drip lines, and to explore how nuclear many-body systems change in such extreme regions by addressing the following topics: the evolution of shell structure in areas of extreme proton to neutron imbalance; the study of the weak interaction in exotic decay schemes such as beta-delayed two-neutron or two-proton emission; the change of isospin symmetry in isobaric mirror nuclei at the drip lines; two protons or two neutrons radioactivity beyond the drip lines; the role of the continuum states including resonant states above the particle-decay threshold in exotic nuclei; and the effects of nuclear reaction rates triggered by the unbound proton-rich nuclei on nuclear astrophysical processes.

43 PARTICLE ACCELERATORS↗

Accelerator challenges in the Fermilab Neutrino Program

In Fermilab's 2022-2023 proton complex run, Fermilab recovered from an unexpected failure in the neutrino focusing horn to achieve a record beam power of 960 kW. For Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, is the ACE Main Injector Ramp and Targetry upgrade, would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, the ACE Booster Replacement, would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The core accelerator challenges, present and future, for operating intense neutrino beams at Fermilab will be highlighted.

43 PARTICLE ACCELERATORS↗