Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch separation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Accelerance Decoupling: An Approach for Removing the Influence of the Test Stand from the Integrated Modal Test

The main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (post pad separation). However, given the size of most LV systems, free-free testing is a challenge and often not feasible. With this, a test stand, typically the launch pad itself, is introduced as the means of support. This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the integrated system modal test. The Space Launch System (SLS) is no exception where the mobile launcher (ML) is used to support the vehicle for the integrated modal test (IMT). For the IMT, it is well understood from pre-test analysis with finite element models (FEMs) of the SLS and SLS coupled to ML that the ML has a significant influence on the SLS modal properties especially in the lower frequency range where the primary SLS bending modes exist. An accelerance decoupling (AD) method has been formulated for the purpose of “subtracting out” the influence of the ML from the IMT results. With AD, the SLS decoupled frequency response functions (FRFs) are directly extracted from the IMT FRFs. The subject approach is aimed to utilize measured data only and achieve a robust FRF decoupling scheme. AD is derived from a widely used coupling technique called “Receptance Coupling” (RC). The AD core equation reverses the RC process and utilizes a pair of auxiliary equations that enable the core equation to be resolved based on measured data only. In AD, the decoupled component FRFs are extracted from the coupled system FRFs with a transformation to remove the contribution of the “subtractive component”. This paper addresses the AD’s operational flexibility to resolve SLS free-free modal properties from coupled system measured data but also the possibility to include data from FEM if there is enough confidence in the FEM or if it is asserted that the effect to the final outcome is reasonable.

Accelerance decoupling↗

Accelerance Decoupling: An Approach for Removing the Influence of the Test Stand from the Integrated Modal Test

The main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (post pad separation). However, given the size of most LV systems, free-free testing is a challenge and often not feasible. With this, a test stand, typically the launch pad itself, is introduced as the means of support. This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the integrated system modal test. The Space Launch System (SLS) is no exception where the mobile launcher (ML) is used to support the vehicle for the integrated modal test (IMT). For the IMT, it is well understood from pre-test analysis with finite element models (FEMs) of the SLS and SLS coupled to ML that the ML has a significant influence on the SLS modal properties especially in the lower frequency range where the primary SLS bending modes exist. An accelerance decoupling (AD) method has been formulated for the purpose of “subtracting out” the influence of the ML from the IMT results. With AD, the SLS decoupled frequency response functions (FRFs) are directly extracted from the IMT FRFs. The subject approach is aimed to utilize measured data only and achieve a robust FRF decoupling scheme. AD is derived from a widely used coupling technique called “Receptance Coupling” (RC). The AD core equation reverses the RC process and utilizes a pair of auxiliary equations that enable the core equation to be resolved based on measured data only. In AD, the decoupled component FRFs are extracted from the coupled system FRFs with a transformation to remove the contribution of the “subtractive component”. This paper addresses the AD’s operational flexibility to resolve SLS free-free modal properties from coupled system measured data but also the possibility to include data from FEM if there is enough confidence in the FEM or if it is asserted that the effect to the final outcome is reasonable.

Accelerance decoupling↗

Atlas/Centaur-SOHO Pre-Launch News Conference

Live coverage of a pre-launch news conference on the Atlas/Centaur SOHO mission is presented. George Diller, NASA Public Affairs, introduces the panel. Floyd Curington, NASA Launch Manager, Kennedy Space Center, presents countdown activities. Pat Symons, Launch Vehicle Manager, NASA Lewis Research Center, analyzes the time duration from liftoff to spacecraft separation. Fabrizio Felici, SOHO Mission Director European Space Agency (ESA), explains the important features of SOHO, which includes a payload of 650 kilos and 12 major instruments with multisensors. Ken Sizemore, International Solar Terrestrial Physics (ISTP) Project Manager Goddard Space Flight Center (GSFC), talks about the successful international collaboration between the ESA and NASA. Joel Tumbiolo, Launch Weather Officer United States Air Force (USAF, presented the weather forecast. SOHO was launched aboard an Atlas II rocket on November 23, 1995. The news conference ends with a brief question and answer period.

Source record↗

Estimating the Life Cycle Cost of Space Systems

A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.

Life cycle cost↗

A liquid/gas phase separator for He-I and He-II

A liquid/gas phase separator has been developed which separates both liquid He-I and He-II from their vapor. The phase separator was designed for the Superfluid Helium On Orbit Transfer (SHOOT) Flight Demonstration both to cool the liquid He after launch (at temperatures between 2.8 and 4.3 K) to the operating temperature of 1.4 K and as a low rate vent on orbit to maintain operating temperature. The phase separator is made of high-purity copper disks held apart by 6 micron Kevlar fibers. It works on the principle of conducting heat from within the dewar to vaporize liquid as it is throttled in the slits to efficiently cool the remaining liquid. Laboratory tests have demonstrated perfect phase separation for both He at its saturated vapor pressure from 1.2 to 4.3 K and for He-II at 2.13 K at pressures from 4.6 to 112 kPa. The performance of this phase separator during lab testing as well as expected performance in space is discussed.

Shirron, P. J.↗

Saturn S-2 problem resolution history report

A summary of S-2 Program problems and the solutions that were implemented is presented. The problems occurred during a period starting with the initial design concepts and continuing through the launch of the tenth S-2 flight stage information is from nine separate disciplines: design, facilities, logistics, manufacturing, material, program management, quality assurance, safety, and tests.

Virgil, F. W.↗

Experiments on the dynamic stability of the space shuttle

Some dynamic stability experiments on the space shuttle using a half-model oscillatory technique are discussed. Resulting information from the experiments is presented and includes: (1) dynamic pitching characteristics of both the orbiter and the booster alone as well as of the two models mated into a single launch configuration; (2) the static and dynamic interference effects during an abort separation maneuver; and (3) the dynamic plume interference effect.

Orlik-Rueckermann, K. J.↗

Corvid meteoroids are not ejecta from the Giordano Bruno impact

The study points out three difficulties with the hypothesis of Hartung (1993) that the Corvid meteor system, observed only once in 1937, may be the return of the clump of ejecta from the formation of a lunar crater, specifically, an event recorded in the chronicles of Gervase of Canterbury on June 25, 1178, which Hartung (1976) previously suggested may be an eyewitness account of the formation of the lunar crater Giordano Bruno. On the basis of this, he predicts that another Corvid shower may be observed in 2003 or 2006. This hypothesis is rejected on the contention that it is implausible that a clump of ejecta could be launched into heliocentric orbit with a low enough dispersion in velocity among separate pieces that it would produce a meteor shower in just one year and not others. Subsequent perturbations by the earth on parts of the clump passing near the earth but not impacting would destroy the coherence of the clump on a time scale much shorter than the 759-yr interval proposed. There are so many orbits that could yield a shower after 759 yr that it is unlikely that a prediction of a return in a specific year would be correct.

Harris, A. W.↗

Space Flight Qualification Program for the AMS-2 Commercial Cryocoolers

The Alpha Magnetic Spectrometer-02 (AMS-02) experiment is a state-of-the-art particle physics detector containing a large superfluid helium-cooled superconducting magnet. Highly sensitive detector plates inside the magnet measure a particle's speed, momentum, charge, and path. The AMS-02 experiment will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. AMS-02 will be installed on the International Space Station on Utilization Flight-4. The experiment will be run for at least three years. To extend the life of the stored cryogen and minimize temperature gradients around the magnet, four Stirling-cycle Sunpower M87N cryocoolers will be integrated with AMS-02. The cryocooler cold tip will be connected via a flexible strap to the outer vapor cooled shield of the dewar. Initial thermal analysis shows the lifetime of the experiment is increased by a factor of 2.8 with the use of the cryocooler. The AMS-02 project selected the Sunpower M87 cryocoolers and has asked NASA Goddard to qualify the cryocoolers for space flight use. This paper describes the interfaces with the cryocoolers and presents data collected during testing of the two engineering model cryocoolers. Tests include thermal performance characterization and launch vibration testing. Magnetic field compatibility testing will be presented in a separate paper at the conference.

Shirey, K. A.↗

A Summary of the Space Shuttle Columbia Tragedy and the Use of LS Dyna in the Accident Investigation and Return to Flight Efforts

On February 1, 2003, the Space Shuttle Columbia broke apart during reentry resulting in loss of 7 crewmembers and craft. For the next several months an extensive investigation of the accident ensued involving a nationwide team of experts from NASA, industry, and academia, spanning dozens of technical disciplines. The Columbia Accident Investigation Board (CAIB), a group of experts assembled to conduct an investigation independent of NASA concluded in August, 2003 that the cause of the loss of Columbia and its crew was a breach in the left wing leading edge Reinforced Carbon-Carbon (RCC) thermal protection system initiated by the impact of thermal insulating foam that had separated from the orbiters external fuel tank 81 seconds into the missions launch. During reentry, this breach allowed superheated air to penetrate behind the leading edge and erode the aluminum structure of left wing which ultimately led to the breakup of the orbiter. In order to gain a better understanding the foam impact on the orbiters RCC wing leading edge, a multi-center team of NASA and Boeing impact experts was formed to characterize the foam and RCC materials for impact analysis using LS Dyna. Dyna predictions were validated with sub-component and full scale tests. LS Dyna proved to be a valuable asset in supporting both the Columbia Accident Investigation and NASA s return to flight efforts. This paper summarizes Columbia Accident and the nearly seven month long investigation that followed. The use of LS-DYNA in this effort is highlighted. Contributions to the investigation and return to flight efforts of the multicenter team consisting of members from NASA Glenn, NASA Langley, and Boeing Philadelphia are introduced and covered in detail in papers to follow in these proceedings.

Melis, Matthew↗

Rollable Thin-Shell Nanolaminate Mirrors

A class of lightweight, deployable, thin-shell, curved mirrors with built-in precise-shape-control actuators is being developed for high-resolution scientific imaging. This technology incorporates a combination of advanced design concepts in actuation and membrane optics that, heretofore, have been considered as separate innovations. These mirrors are conceived to be stowed compactly in a launch shroud and transported aboard spacecraft, then deployed in outer space to required precise shapes at much larger dimensions (diameters of the order of meters or tens of meters). A typical shell rollable mirror structure would include: (1) a flexible single- or multiple-layer face sheet that would include an integrated reflective surface layer that would constitute the mirror; (2) structural supports in the form of stiffeners made of a shape-memory alloy (SMA); and (3) piezoelectric actuators. The actuators, together with an electronic control subsystem, would implement a concept of hierarchical distributed control, in which (1) the SMA actuators would be used for global shape control and would generate the large deformations needed for the deployment process and (2) the piezoelectric actuators would generate smaller deformations and would be used primarily to effect fine local control of the shape of the mirror.

Hickey, Gregory↗

CFD Assessment of Forward Booster Separation Motor Ignition Overpressure on ET XT 718 Ice/Frost Ramp

Computational fluid dynamics assessment of the forward booster separation motor ignition over-pressure was performed on the space shuttle external tank X(sub T) 718 ice/frost ramp using the flow solver OVERFLOW. The main objective of this study was the investigation of the over-pressure during solid rocket booster separation and its affect on the local pressure and air-load environments. Delta pressure and plume impingement were investigated as a possible contributing factor to the cause of the debris loss on shuttle missions STS-125 and STS-127. A simplified computational model of the Space Shuttle Launch Vehicle was developed consisting of just the external tank and the solid rocket boosters with separation motor nozzles and plumes. The simplified model was validated by comparison to full fidelity computational model of the Space Shuttle without the separation motors. Quasi steady-state plume solutions were used to calibrate the thrust of the separation motors. Time-accurate simulations of the firing of the booster-separation motors were performed. Parametric studies of the time-step size and the number of sub-iterations were used to find the best converged solution. The computed solutions were compared to previous OVERFLOW steady-state runs of the separation motors with reaction control system jets and to ground test data. The results indicated that delta pressure from the overpressure was small and within design limits, and thus was unlikely to have contributed to the foam losses.

Tejnil, Edward↗

Evolution of Orion Mission Design for Exploration Mission 1 and 2

The evolving mission design and concepts of NASA's next steps have shaped Orion into the spacecraft that it is today. Since the initial inception of Orion, through the Constellation Program, and now in the Exploration Mission frame-work with the Space Launch System (SLS), each mission design concept and program goal have left Orion with a set of capabilities that can be utilized in many different mission types. Exploration Missions 1 and 2 (EM-1 and EM-2) have now been at the forefront of the mission design focus for the last several years. During that time, different Design Reference Missions (DRMs) were built, analyzed, and modified to solve or mitigate enterprise level design trades to ensure a viable mission from launch to landing. The resulting DRMs for EM-1 and EM-2 were then expanded into multi-year trajectory scans to characterize vehicle performance and Earth-Moon geometry trends. This provides Orion's subsystems with stressing reference trajectories to help design their system. Now that Orion has progressed through the Preliminary and Critical Design Re-views (PDR and CDR) there is a general shift in the focus of mission design from aiding the vehicle design to providing mission specific products needed for pre-flight and real time operations. Some of the mission specific products need-ed include analysis of steering law performance, inputs into navigational accura-cy assessments, abort options at any point in the mission for each valid trajecto-ry in the launch window, recontact avoidance between the upper stage and Orion post nominal separation, etc.

Gutkowski, Jeffrey P.↗

Building Booster Separation Aerodynamic Databases for Artemis II

NASA’s Artemis II mission will mark the return of humans to near-lunar space for the first time since Apollo. Shortly after launch on the Space Launch System (SLS), a critical phase of ascent occurs when 16 small rockets fire to push the boosters away from the core. Minimizing the risk of failure during separation requires the construction of multiple 13-dimensional databases, including perturbations in position, flight conditions, and engine thrust. The SLS Computational Fluid Dynamics team used NASA’s FUN3D flow solver on the Pleiades and Electra supercomputers to run 5,780 simulations at nominal conditions and over 8,000 simulations with a core stage engine failure to generate the databases needed to verify the booster separation system for Artemis II.

Meeroff, Jamie G.↗

Optimization of the Lunar Icecube Trajectory Using Stochastic Global Search and Multi-Point Shooting

Lunar IceCube is a 6U cubesat that will launch on NASA’s Artemis 1 mission in 2021. Lunar IceCube will separate from Artemis 1 shortly after trans-lunar injection (TLI) and travel to its science orbit about the moon using its Busek Ion Thruster 3 (BIT-3) propulsion system. This paper describes a technique to rapidly design Lunar IceCube trajectories using the monotonic basin hopping (MBH) stochastic global search algorithm, along with low- and high-fidelity multi-point shooting transcriptions. This technique allows the Lunar IceCube team to rapidly adapt to changing initial conditions, spacecraft properties, and operational constraints.

optimization↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗

Controlling Triboelectrification Effects on Spacecraft Ethernet Cabling

Triboelectric charging of a spacecraft and launch vehicles on ascent may occur due to the process of contact and separation between the vehicle skin and aerosols, dust, ice, water droplets, smoke, and other particulates encountered in the flight path. Depending on characteristics at the atomic and molecular levels of the vehicle skin’s surface and the substances and particulates encountered, electrical charge will transfer between the vehicle and the encountered substances, resulting in an accumulation of electrical charge on the vehicle skin. If the vehicle skin is conductive and electrically bonded such that in its entirety it presents an equipotential surface, then the accumulated electrical charge will spread in a nearly uniform manner leaving all regions with a nearly equal potential with respect to each other and the surrounding environment. Regions that are not electrically bonded as described, or surfaces that have resistivity values, can reach different potentials than the surrounding surfaces. When this happens, the differing potentials may grow to very large magnitudes, leading to electrostatic discharge events between the regions. As the vehicle rises in altitude, the breakdown potential between these regions of differing potential decreases commensurate with decreases in atmospheric density and pressure. If the potential differences between surfaces of the vehicle become equal to or exceed the breakdown potential, one or more discharge events may occur, each of them generating voltage and current transients that can easily damage or interfere with the designed operation of on-board electrical, avionic, and communications and navigation systems. This lesson learned discusses an in-flight anomaly caused by triboelectric discharge events and exacerbated by the lack of adequate cable shielding that affected flight computer communication links. Also discussed are mitigations to prevent this occurrence.

Ethernet↗

Space observations of the variability of solar irradiance in the near and far ultraviolet

Satellite observations of the ultraviolet solar irradiance in selected wavelength bands between 1200 and 3000 a were made continuously by photometers consisting of broad-band sensors operated on Numbus 3 and 4 which were launched in April 1969 and 1970. In addition, spectrophotometer measurements of the solar irradiance were made with a dispersive instrument at 12 selected wavelengths from 2550 to 3400 a with a 10 a bandpass on Nimbus 4. Variations of the solar irradiance associated with the solar rotational period were observed since the launch of Nimbus 3. These variations are apparently associated with two source regions separated by about 180 deg in solar longitude. The change in irradiance with solar rotation was found to increase with decreasing wavelengths. Different types of the observed variations in uv solar irradiance can be classified in accordance with characteristics times, e.g. in the order of increasing periods as follows: (1)flare associated enhancements (2) 27-day variations due to solar rotation; (3) a possible biennial effect; and (4) long term variations associated with the 11-year solar cycle.

Heath, D. F.↗