Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component Testing Supporting SHINE Medical Technologies

SHINE is going to be implementing a tritium gas processing system to support their Mo-99 work. They have requested that the Hydrogen Process Group of SRNL does some required testing on the system components before startup. The lab plans on conducting both seismic and valve testing. Test Plan: - Testing 10 1C valves 750,000 cycles or until failure; - Testing intervals will be every couple thousand; - 1C valves will have metal stem tips instead of Polymer due to being in a tritium prone area; - Hope that the valves will still have enough force to create a sufficient seal with metal stem tips; - Goal is for a more cost and space efficient alternative to the 5C valves. Status: - Received half the parts, waiting on the other half due to long procurement times; - Waiting on the LabVIEW program which will perform the testing. Path Forward: - R and DE to change out the stem tips (July 2018); - Assemble Manifold (July 2018); - Perform Testing (August 2018); - Report (September 2018). Since SRNL does not own a shaker table, the test will be conducted at a facility like the NTS Facility in Huntsville, Alabama. Test Plans: - Leak Testing; - Use LabVIEW to monitor for leaks before, during and after seismic testing with an Electronic Pressure Transducer; - If leak is detected, sniff for location using Helium Leak Detector; - Connector Testing; - Use LabVIEW to test for electrical continuity before, during and after seismic testing; - If a connectors continuity is interrupted, further testing will be performed; - Each Pin in faulty connector will be testing to determine specific location of disruption. Path Forward: - Pick a Qualified Vender for testing (July 2018); - Procure the connector plugs (July 2018); - Send components and test plan to facility for testing (August 2018); - Perform Testing (August-September 2018); - Report Results (September 2018)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Addressing embedded digital devices in safety-related systems of nuclear power plants - 307

The purpose of this paper is to provide an overview of the development of the approach to addressing embedded digital devices (EDD) in safety-related systems of nuclear power plants in the U.S. and around the world. In April, 2016, the U.S. Nuclear Regulatory Commission (US NRC) issued RIS 2016-05 to heighten awareness that EDDs might exist in procured equipment used in safety-related systems without the devices having been explicitly identified in procurement documentation. Inadequate consideration of these devices in digital technology system upgrades, component replacements, and new equipment applications could lead to an adverse safety consequence. The US NRC request was for addressees to implement early efforts to identify these devices. An area where this is being addressed is in regard to the performance of Diversity and Defense-In-Depth (D3) analyses, as addressed in US NRC Branch Technical Position 7-19. Nuclear facilities have increased their use and reliance on digital technology in systems and equipment (e.g., I and C, electrical systems, and fluid systems). In addition to digital instrumentation and control (I and C) systems, examples of safety-related equipment that may use digital technology include emergency diesel generators, pumps, valve actuators, motor control centers, breakers, priority logic modules, time-delay relays, and uninterruptible power sources. In the U.S. and around the world, engineering and licensing activities in standards and guidance have been, and are being developed to address this important consideration in protecting safety-related systems. This paper addresses development of an extended approach to evaluating common-cause failure vulnerability and mitigation in regard to equipment with an EDD. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site – 25078

Westinghouse Savannah River Company, the SRS Management and Operations Contractor at the time, procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support the layup of the F Canyon at SRS. F Canyon was one of two full-scale hardened radiochemical separations facilities built at SRS in the 1950s as part of the initial construction of the Site. F Canyon and H Canyon provided actinide separations capabilities for SRS through the end of the Cold War. Following the end of the Cold War era, the decision was eventually made that only one of these radiochemical separations facilities at SRS would still be needed moving forward. As H Canyon was considered better suited for ongoing SRS missions, F Canyon was placed into a layup state in the first decade of the 21st Century, with F Area deactivation completing in 2006. This process resulted in the creation of excess, radioactively contaminated solutions, which required disposition. These solutions included contaminated organic solutions as well as DU-bearing aqueous solutions. The six portable tanks were procured to support the transportation of these solutions.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

BESS Digital Assurance, Supply Chain Risk Management, and Emerging Regulation Session Two

The TADA BESS Supply Chain Workshops are designed to equip participants with the knowledge and tools necessary to address the evolving challenges at the intersection of battery energy storage systems (BESS), cybersecurity, and supply chain vulnerabilities. The workshops emphasize the application of Cyber-Informed Engineering (CIE) principles using INL’s procurement guide and the CIE-BAT tool. Attendees will develop risk-based security strategies and actionable compliance roadmaps tailored to their BESS projects. Additionally, the program fosters a collaborative network of practitioners and provides guidance on navigating emerging regulatory requirements, including FEOC rules under the OBBB framework, to assess and enhance organizational readiness. A comprehensive exploration of BESS cybersecurity supply chain risks, systematic vendor risk assessment through the BESS Procurement Guide, and practical application of the INL SCRM Chatbot for enhanced supply chain resilience. This is Session 2 of 3. (Full Version)

25 - ENERGY STORAGE↗

SPC-2918 Rev 0 MARVEL Test Loop Flowmeters

This specification contains the requirements for the design, manufacture, testing, and delivery of magnetic flowmeters to be installed on the MARVEL Primary Coolant Apparatus Test (PCAT) system. The PCAT system is a heated test loop which will be used to simulate the coolant system of a proposed sodium or NaK cooled microreactor. The system has four identical cooling loops. Installation of flowmeters on all four loops is anticipated at this time, however, the number of flowmeters may be reduced by the Project. Note that the number of flowmeters described herein is not a commitment to a particular number of procured units. The number of flowmeter units procured shall be identified on the purchase order. The MARVEL reactor is still under design, so the PCAT flowmeter design may not be directly transferrable to the reactor. It is intended that the design and development effort for the PCAT flowmeters be leveraged to the extent practical for the reactor flowmeter design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70486 Rev 0 Stirling Engine Prototype Performance Specification

Idaho National Laboratory (INL) is developing a small microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. The purpose of this performance specification is to define requirements to build and test the Stirling Engine prototype, including interfacing with Kinnetech in the development/test of the engines. This specification includes prototyping components only and are not for use in the reactor. Prototype testing is a preliminary test to be conducted with conceptual equipment from which a final design will be developed. The results of the testing defined herein will not be used as a qualification test. The Stirling Engines have an engine controller module (QEC). Currently, the QEC doesn’t have a means to stop the engine. An analog controlled engine braking system must be developed and tested with the engine prototype. Any conflict between this specification and any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Bunch by Bunch Profiling with a Rotating X-ray Mask

It is desirable to monitor the cross sections of each positron bunch in the Low Energy Ring (LER) storage rings of the Positron Electron Project II (PEP-II) located at the Stanford Linear Accelerator Center. One method is to pass the x-rays given off by each bunch through a scintillator, thereby studying a visible image. A rotating x-ray mask with three slots scans the beam image in three different orientations, allowing us to mechanically collect data to characterize and profile each image. Progress was made in designing the x-ray mask, researching and procuring parts, as well as advancing project plans. However, due to time constraints and difficulties in procuring special parts, the full system was not completed. A simpler setup was built to test the hardware as well as the feasibility of characterizing a circular image with a rotating mask. A blinking green light emitting diode (LED) simulated a single positron bunch stored in the LER ring. The selected hardware handled this simulation setup well and produced data that led to a reasonable estimation of the LED image diameter.

43 PARTICLE ACCELERATORS↗

Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method

The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.

42 - ENGINEERING↗

Determinants of contract duration: further evidence from coal-fired power plants

Transactions cost theory predicts that the availability of alternatives is one of the determinants of contract duration. Over the last 20 years, the coal market has seen many regulatory changes that have generally increased the number of alternatives in the process of procuring coal. In this paper data from long-term coal contracts for electricity generation signed before 1999 are used to estimate the effect of increasing alternatives on contract duration. Empirical results tend to match transactions cost theory that increased alternatives reduces contract duration.

01 COAL, LIGNITE, AND PEAT↗

Efficient and Reliable Reactive Power Supply and Consumption --Insights from an Integrated Program of Engineering and EconomicResearch

In 2005, the Federal Energy Regulatory Commission (FERC) began discussing regulatory policy for reactive-power procurement and pricing in competitive electricity markets. This paper summarizes findings from a unique, interdisciplinary program of public-interest research that lays a formal foundation for evaluating aspects of FERC staff recommendations and offers early insights that should be useful in guiding policy implementation, specifically by: (1) clarifying the consumers and economic characteristics of reactive power as a basis for creating incentives to appropriately price it, (2) defining specific challenges in creating a competitive market for reactive power as well as new tools needed to help ensure such a market functions efficiently, and (3) demonstrating the importance of accounting for the physical characteristics of the transmission network in planning for reactive power and avoiding the exercise of market power by suppliers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Buy versus build: a survey of state policies

Integrated resource planning has reemerged as the primary means through which new generation will be developed in much of the U.S. Where this is the case, regulators will need to address the manner and extent to which independent power producers are allowed to compete to supply a utility's incremental resource needs. This article reports the results of a survey of state policies with respect to competitive procurement. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The enduring role of contracts for difference in risk management and market creation for renewables

Governments procure renewables through a variety of mechanisms. Contracts for difference (CfDs) have been used for more than 50% of the global offshore wind supply. The payments awarded through CfDs are sometimes labelled subsidies, suggesting that they support uneconomic activity. Here, in this study, we argue that the primary role of CfDs is rather risk management by creating a market for electricity supply at stable long-term prices. Similar to its use in other sectors of the economy, this contract type transforms a variable to a fixed price to reallocate volatility risks. Such long-term contracts are often necessary for renewables financing due to limited hedging options in existing markets. Our perspective could imply a shift in perception towards CfDs as a fundamental and lasting market feature. We hope to stimulate a timely discussion about the impact of greater CfD diffusion on electricity market mechanisms, risk allocation and the potential for combining fragmented streams of energy finance, market and policy research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ITER Construction--Plant System Integration

This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The ESIF-HPC-2 Benchmark Suite

We describe the development of the ESIF-HPC-2 benchmark suite, a collection of kernel and application benchmark codes for measuring computational and I/O performance from single nodes to full HPC systems that was used for acceptance testing in our recent HPC procurement. The configurations of the benchmarks used for our system is presented. We also describe a set of "dimensions" that can be used to classify benchmarks and assess coverage of a suite systematically. The collection is offered cost-free as a GitHub repository for general usage and further development.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of New Transportation/Storage Cask System for Use by DOE Russian Research Reactor Fuel Return Program

The United States, the Russian Federation, and the International Atomic Energy Agency (IAEA) have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program. The purpose of this program is to return Soviet or Russian supplied high-enriched uranium (HEU) fuel currently stored at Russian-designed research reactors throughout the world to Russia. To accommodate transport of the HEU spent nuclear fuel (SNF), a new large-capacity transport/storage cask system was specially designed for handling and operations under the unique conditions for these research reactor facilities. This new cask system is named the ŠKODA VPVR/M cask. The design, licensing, testing, and delivery of this new cask system are the results of a significant international cooperative effort by several countries and involved numerous private and governmental organizations. This paper contains the following sections: (1) Introduction/Background; (2) VPVR/M Cask Description; (3) Ancillary Equipment, (4) Cask Licensing; (5) Cask Demonstration and Operations; (6) IAEA Procurement, Quality Assurance Inspections, Fabrication, and Delivery; and, (7) Summary and Conclusions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗