Search NASA⌕ Search

SEARCH · Search NASA

Results for “spacecraft simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

PV Theories For Planetary Atmospheric Circulations

Potential vorticity (or PV) has become an important tool for the diagnosis and modeling of the Earth's atmospheric and oceanic circulations. More recently, the application of PV thinking to numerical simulations and spacecraft observations of other atmospheres, including those of Mars, Venus, and Titan, has encouraged the hope for a unified understanding of planetary circulation regimes encompassing a wide range of rotation, stratification, and forcing parameters. Specifically, the accumulated evidence suggests that zonal-mean winds and temperatures at upper tropospheric levels approximate a state of zero potential vorticity within the bounding latitudes of the westerly jets, while the poleward regions of cyclonic shear conform to a PV state that is well mixed with respect to its polar limit. This review of the prospects for conceptual planetary circulation models will explore the possibility that the zonal-mean state of an atmosphere can be calculated in terms of a simple link between the latitudinal PV and potential temperature variation at an upper baroclinic steering level.

Allison, Michael↗

Space Station Freedom crew training

The nature of the Space Station Freedom Program presents an array of new and enhanced challenges which need to be addressed en route to developing an effective and affordable infrastructure for crew training. Such an infrastructure is essential for the safety and success of the program. The three major challenges that affect crew training are the long lifetime of the program (thirty years), the interdependence of successive increments, and the participation of the three International Partners (Canada, European Space Agency, and Japan) and a myriad of experimenters. This paper addresses these major challenges as they drive the development of a crew training capability and the actual conduct of crew training.

Space Flight/education/organization & administrati↗

A survey of ground operations tools developed to simulate the pointing of space telescopes and the design for WISE

WISE, the Wide Field Infrared Survey Explorer, is scheduled for launch in June 2010. The mission operations system for WISE requires a software modeling tool to help plan, integrate and simulate all spacecraft pointing and verify that no attitude constraints are violated. In the course of developing the requirements for this tool, an investigation was conducted into the design of similar tools for other space-based telescopes. This paper summarizes the ground software and processes used to plan and validate pointing for a selection of space telescopes; with this information as background, the design for WISE is presented.

ground system↗

Large Field Photogrammetry Techniques in Aircraft and Spacecraft Impact Testing

The Landing and Impact Research Facility (LandIR) at NASA Langley Research Center is a 240 ft. high A-frame structure which is used for full-scale crash testing of aircraft and rotorcraft vehicles. Because the LandIR provides a unique capability to introduce impact velocities in the forward and vertical directions, it is also serving as the facility for landing tests on full-scale and sub-scale Orion spacecraft mass simulators. Recently, a three-dimensional photogrammetry system was acquired to assist with the gathering of vehicle flight data before, throughout and after the impact. This data provides the basis for the post-test analysis and data reduction. Experimental setups for pendulum swing tests on vehicles having both forward and vertical velocities can extend to 50 x 50 x 50 foot cubes, while weather, vehicle geometry, and other constraints make each experimental setup unique to each test. This paper will discuss the specific calibration techniques for large fields of views, camera and lens selection, data processing, as well as best practice techniques learned from using the large field of view photogrammetry on a multitude of crash and landing test scenarios unique to the LandIR.

Littell, Justin D.↗

Foot Pedals for Spacecraft Manual Control

Fifty years ago, NASA decided that the cockpit controls in spacecraft should be like the ones in airplanes. But controls based on the stick and rudder may not be best way to manually control a vehicle in space. A different method is based on submersible vehicles controlled with foot pedals. A new pilot can learn the sub's control scheme in minutes and drive it hands-free. We are building a pair of foot pedals for spacecraft control, and will test them in a spacecraft flight simulator.

Love, Stanley G.↗

L2-Charged Particle Environment (L2-CPE)Low Energy Radiation Fluence Model

The L2 Charged Particle Environment (L2-CPE) model provides estimates of number flux and fluence for the low energy electron, proton, and alpha particle populations in the near Earth solar wind and the Earth’s distant magnetosheath and magnetotail. The model is an engineering tool for specifying radiation environments over an energy range from a few eV to a few MeV of importance to surface dose and radiation damage to thin space exposed materials and is intended for use in space system design applications. Mission fluences are obtained by simulating a spacecraft flight trajectory through time-dependent bow shock and magnetopause boundaries with dimensions and orientations driven by solar wind parameters. Monte Carlo sampling of flux environments within individual plasma regimes and/or fluence accumulated along a fight trajectory through multiple regimes is used to determine statistical variations (means and extremes) of the differential number flux and fluence environments for each of the three charged particle species. Model output is differential (in energy) number fluence and flux for the three particle species in units of particles/cm2-keV and particles/cm2-sec-keV, respectively. Users can select the energy range of interest but the current version of the code (L2-CPE Version 1.4.2d) is limited to an energy range of 1 eV to 10 MeV. Flux is integrated over angle to give flux and fluence to surfaces in the ±XGSE, ±YGSE, and/or ±ZGSE directions. Figure 1 shows the opening screen from the L2-CPE graphical user interface (GUI) with options for flux, fluence, plotting model output. The flux scene generate is not currently implemented in the GUI.

Joseph I Minow↗

Hybrid Guidance Control for a Hypervelocity Small Size Asteroid Interceptor Vehicle

Near-Earth Objects (NEOs) are comets and/or asteroids that have orbits in proximity with Earth's own orbit. NEOs have collided with the Earth in the past, which can be seen at such places as Chicxulub crater, Barringer crater, and Manson crater, and will continue in the future with potentially significant and devastating results. Fortunately such NEO collisions with Earth are infrequent, but can happen at any time. Therefore it is necessary to develop and validate techniques as well as technologies necessary to prevent them. One approach to mitigate future NEO impacts is the concept of high-speed interceptor. This concept is to alter the NEO's trajectory via momentum exchange by using kinetic impactors as well as nuclear penetration devices. The interceptor has to hit a target NEO at relative velocity which imparts a sufficient change in NEO velocity. NASA's Deep Impact mission has demonstrated this scenario by intercepting Comet Temple 1, 5 km in diameter, with an impact relative speed of approximately 10 km/s. This paper focuses on the development of hybrid guidance navigation and control (GNC) algorithms for precision hypervelocity intercept of small sized NEOs. The spacecraft's hypervelocity and the NEO's small size are critical challenges for a successful mission as the NEO will not fill the field of view until a few seconds before intercept. The investigation needs to consider the error sources modeled in the navigation simulation such as spacecraft initial state uncertainties in position and velocity. Furthermore, the paper presents three selected spacecraft guidance algorithms for asteroid intercept and rendezvous missions. The selected algorithms are classical Proportional Navigation (PN) based guidance that use a first order difference to compute the derivatives, Three Plane Proportional Navigation (TPPN), and the Kinematic Impulse (KI). A manipulated Bennu orbit that has been changed to impact Earth will be used as a demonstrative example to compare the three methods. In addition, a hybrid approach that is a combination between proportional navigation and kinematic impulse will be investigated to find an effective, error tolerant, and power saving approach. A 3-dimension mission scenario for both the asteroid and the interceptor spacecraft software simulator is developed for testing of the controllers. The current result demonstrates that a miss distance magnitude of less than 10m is found using the PN and TPPN guidance laws for small asteroid in the presence of error in the spacecraft states. Moreover, the paper presents these results and also the hybrid control approach simulation results.

asteroid↗

Estimation of Timing Performance with Pulsed Laser Links for Small Satellite PNT

Satellite constellations are growing in size and in utility for applications as diverse as providing reliable, low-latency internet service to rural areas orEarth science missions.This expansion of satellite constellations brings attention to the need for responsive and reliable satellite communication.Current research in the PrecisionSpace Systems Laboratory at the University of Florida focuses on using pulsed laser communications as the method of relaying time signals instead of the radio frequency (RF)signals.The upcoming CLICK (CubeSat Laser Infrared CrosslinK) missions (Massachusetts Institute of Technology, University of Florida, NASA Ames Research Center) will demonstrate a spacecraft-to-spacecraft laser communication link and time-transfer.For pre-flight technology assessment of missions such as CLICK, a simulation of a spacecraft constellation in Earth orbit has been created to estimate clock synchronization and precision orbit determination based on measured instrumentation performance.We have developed a novel MATLAB-based numerical simulator to model spacecraft-to-spacecraft laser time-transfer and estimate the offset between the spacecraft clocks over time.This simulation includes timing errors associated with laser pulse generation and detection, as well as non-Gaussian clock drift models.The two on-board clocks modeled are a cesium-based Chip-Scale Atomic Clock (CSAC) and a rubidium-based Miniature Atomic Clock (MAC), both produced by Microchip.An example case of two spacecraft in a circular, low-Earth orbit receiving GPS position, GPS timing, and laser pulse time-of-flight measurements is simulated.The positions and velocities of the two spacecraft at a reference epoch and the constant clock model coefficients are estimated.Polynomial models of different orders were used as clock models. The effect of clock model order on the root-mean-square (RMS) of the clock error is apparent in the case using GPS and lasing measurements, showing that the clock model improves with increasing clock model order. Results compare the estimated clock model of a mission operation that only uses GPS measurements and a mission operation that uses both GPS and laser pulse time-of-flight measurements between spacecraft referenced to their on-board CSACs or on-board MACs. Including lasing measurements reduces the RMS clock model error by approximately 80% of the RMS of the cases with only GPS measurements.This simulation tool can be used to optimize the lasing operations schedule based on mission timing performance objectives. During this presentation, I will discuss the details of the simulation and clock model estimation, as well as discuss the results.I will compare the results of incorporating lasing timing measurements to using only GPS measurements and the outcomes of using different orders of polynomials.

Timing Performance↗

Spacecraft applications of advanced global positioning system technology

This is the final report on the Texas Instruments Incorporated (TI) simulations study of Spacecraft Application of Advanced Global Positioning System (GPS) Technology. This work was conducted for the NASA Johnson Space Center (JSC) under contract NAS9-17781. GPS, in addition to its baselined capability as a highly accurate spacecraft navigation system, can provide traffic control, attitude control, structural control, and uniform time base. In Phase 1 of this program, another contractor investigated the potential of GPS in these four areas and compared GPS to other techniques. This contract was for the Phase 2 effort, to study the performance of GPS for these spacecraft applications through computer simulations. TI had previously developed simulation programs for GPS differential navigation and attitude measurement. These programs were adapted for these specific spacecraft applications. In addition, TI has extensive expertise in the design and production of advanced GPS receivers, including space-qualified GPS receivers. We have drawn on this background to augment the simulation results in the system level overview, which is Section 2 of this report.

Source record↗

A passively controlled appendage deployment system for the San Marco D/L spacecraft

The analytical simulation of deployment dynamics of these two axis concepts as well as the evolution of practical designs for the add on deployable inertia boom units is described. With the boom free to swing back in response to Coriolis forces as well as outwards in response to centrifugal forces, the kinematics of motion are complex but admit the possibility of absorbing deployment energy in frictional or other damping devices about the radial axis, where large amplitude motions can occur and where the design envelope allows more available volume. An acceptable range is defined for frictional damping for any given spin rate. Inadequate damping allows boom motions which strike the spacecraft; excessive damping causes the boom to swing out and latch with damaging violence. The acceptable range is a design parameter and must accommodate spin rate tolerance and also the tolerance and repeatability of the damping mechanisms.

Lang, W. E.↗

Leak Rate Performance of Silicone Elastomer O-Rings Contaminated with JSC-1A Lunar Regolith Simulant

Contamination of spacecraft components with planetary and foreign object debris is a growing concern. Face seals separating the spacecraft cabin from the debris filled environment are particularly susceptible; if the seal becomes contaminated there is potential for decreased performance, mission failure, or catastrophe. In this study, silicone elastomer O-rings were contaminated with JSC- 1A lunar regolith and their leak rate performance was evaluated. The leak rate values of contaminated O-rings at four levels of seal compression were compared to those of as-received, uncontaminated, O-rings. The results showed a drastic increase in leak rate after contamination. JSC-1A contaminated O-rings lead to immeasurably high leak rate values for all levels of compression except complete closure. Additionally, a mechanical method of simulant removal was examined. In general, this method returned the leak rate to as-received values.

leak rate↗

Juno Mission Simulation

The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.

space vehicles↗

A Prototyping Effort for the Integrated Spacecraft Analysis System

Computer modeling and simulation has recently become an essential technique for predicting and validating spacecraft performance. However, most computer models only examine spacecraft subsystems, and the independent nature of the models creates integration problems, which lowers the possibilities of simulating a spacecraft as an integrated unit despite a desire for this type of analysis. A new project called Integrated Spacecraft Analysis was proposed to serve as a framework for an integrated simulation environment. The project is still in its infancy, but a software prototype would help future developers assess design issues. The prototype explores a service oriented design paradigm that theoretically allows programs written in different languages to communicate with one another. It includes creating a uniform interface to the SPICE libraries such that different in-house tools like APGEN or SEQGEN can exchange information with it without much change. Service orientation may result in a slower system as compared to a single application, and more research needs to be done on the different available technologies, but a service oriented approach could increase long term maintainability and extensibility.

mission planning↗