Measure Impact of Molten Halide Salt on Creep and Fatigue Behavior of 625 and 316H SS
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Canadian Galactic Emission Mapper (CGEM) radio telescope is mapping polarized Galactic foregrounds from 8-10 GHz to aid in the search for B-modes in the Cosmic Microwave Background (CMB). Here we describe the design and early on-sky characterization of the CGEM optics. CGEM employs an on-axis, hat feed optical design that is a body of revolution (BOR) and exhibits excellent intrinsic polarization purity. We describe how we have optimized the optics with a novel framework that can directly minimize simulated intensity to polarized intensity (T → P) leakage in angular power spectrum space. The optimized optics exhibit simulated T → P leakage that is orders of magnitude below anticipated CℓBB for r = 10 −3 when scaled from 8-10 GHz to the CMB observing window near 95 GHz. We go on to describe the mechanical design of the optics, including a novel secondary mirror support made from Astroquartz composite that has low loss, low dielectric constant, and preserves the BOR symmetry of the optics. We then showcase the early on-sky performance of the optics with observations of the Sun and satellites, which probe the beam to 40dB down from the peak. A beam model for the deployed CGEM optics based on electromagnetic simulations is in excellent agreement with the on-sky data.
Not provided.
Not provided.
Explore the source record for details and available documents.
There has been significant progress towards the Go/No-Go Review Criteria for both sub-projects to prepare the project to enter Budget Period 2 in July.
Not provided.
Not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Not provided.
Explore the source record for details and available documents.