Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

System safety as applied to Skylab

Procedural and organizational guidelines used in accordance with NASA safety policy for the Skylab missions are outlined. The basic areas examined in the safety program for Skylab were the crew interface, extra-vehicular activity (EVA), energy sources, spacecraft interface, and hardware complexity. Fire prevention was a primary goal, with firefighting as backup. Studies of the vectorcardiogram and sleep monitoring experiments exemplify special efforts to prevent fire and shock. The final fire control study included material review, fire detection capability, and fire extinguishing capability. Contractors had major responsibility for system safety. Failure mode and effects analysis (FMEA) and equipment criticality categories are outlined. Redundancy was provided on systems that were critical to crew survival (category I). The five key checkpoints in Skylab hardware development are explained. Skylab rescue capability was demonstrated by preparations to rescue the Skylab 3 crew after their spacecraft developed attitude control problems.

Kleinknecht, K. S.↗

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

Combination of an electrolytic pretreatment unit with secondary water reclamation processes

The design and fabrication of a flight concept prototype electrolytic pretreatment unit (EPU) and of a contractor-furnished air evaporation unit (AEU) are described. The integrated EPU and AEU potable water recovery system is referred to as the Electrovap and is capable of processing the urine and flush water of a six-man crew. Results of a five-day performance verification test of the Electrovap system are presented and plans are included for the extended testing of the Electrovap to produce data applicable to the combination of electrolytic pretreatment with most final potable water recovery systems. Plans are also presented for a program to define the design requirements for combining the electrolytic pretreatment unit with a reverse osmosis final processing unit.

Wells, G. W.↗

ATS-F ground station integration

The ATS ground stations were described, including a system description, operational frequencies and bandwidth, and a discussion of individual subsystems. Each station configuration is described as well as its floor plan. The station performance, as tested by the GSI, is displayed in chart form providing a summary of the more important parameters tested. This chart provides a listing of test data, by site, for comparison purposes. Also included is a description of the ATS-6 experiments, the equipment, and interfaces required to perform these experiments. The ADP subsystem and its role in the experiments is also described. A description of each program task and a summary of the activities performed were then given. These efforts were accomplished at the Rosman II Ground Station, located near Rosman N.C., the Mojave Ground Station, located near Barstow Ca., and the GSI Contractors plant located near Baltimore, Md.

Source record↗

An investigation of the acceptance of solar heating and cooling in the housing industry in New Mexico

A data base of information relating to the acceptability of solar-energy technology in the New Mexican housing industry was developed. Topics examined include: (1) the factors which influence the adoption of solar-energy systems in the New Mexican housing industry; (2) the degree of acceptability of various solar factors among New Mexican consumers, architects, contractors, financiers, energy suppliers, and governmental officials; and (3) the current attitudes toward the acceptability of solar energy factors in the New Mexican housing industry.

Lundahl, C. R.↗

The NASA teleconferencing system: An evaluation

The communication requirements of the Apollo project led to the development of a teleconferencing network which linked together, in an audio-fax mode, the several NASA centers and supporting contractors of the Apollo project. The usefulness of this communication linkage for the Apollo project suggested that the system might be extended to include all NASA centers, enabling them to conduct their in-house business more efficiently than by traveling to other centers. A pilot project was run in which seventeen NASA center and subcenters, some with multiple facilities, were connected into the NASA teleconferencing network. During that year, costs were charted and, at the end of the year, an evaluation was made to determine how the system had been used and with what results. The year-end evaluation of the use of NASA teleconferencing system is summarized.

Connors, M. M.↗

NASA teleconference pilot project evaluation for 1975

Tabular data were given to summarize the results of the NASA teleconferencing network pilot project for 1975. The 1,241 evaluation reports received indicate that almost 100,000 man-hours of teleconferences took place. The travel funds reported saved total about $1.44 million, which is about 10% of the NASA travel costs. Subtracting the cost of providing the teleconferencing networks, the net savings reported are $1.28 million (about 9% of the travel costs). The teleconferencing network has proved to be successful in conducting many management meetings and reviews within NASA and its contractors. In spite of difficulties caused by inexperience in teleconferencing and some equipment and circuit problems, the evaluation reports indicated the system was satisfactory in an overwhelming majority of cases.

Fordyce, S. W.↗

A summary of the application of active controls technology in the ATT system studies

The application of active controls technology to subsonic, long-range transport aircraft was investigated in three Advanced Transport Technology system studies. Relaxed stability requirements, maneuver and gust load alleviation, and active flutter suppression were the concepts considered. A different configuration was investigated for each of the three airframe manufacturers, and each had a somewhat different approach to the application of active controls technology. Consequently, the results varied in magnitude between the contractors, but several trends were noted. Relaxed stability requirements resulted in the largest benefits - reduced weight, increased return on investment, and decreased direct operating costs. Maneuver load alleviation, gust load alleviation, and flutter suppression resulted in much smaller benefits. Prior to application of active controls technology, a research and development program directed toward fulfilling data base requirements, establishing effective design techniques and criteria, improving systems maintainability and reliability, and demonstrating technology readiness must be completed.

Hood, R. V.↗

Solar-assisted gas-energy water-heating feasibility for apartments

Studies of residential energy use, solar-energy technology for buildings, and the requirements for implementing technology in the housing industry led to a project to develop a solar water heater for apartments. A design study for a specific apartment was used to establish a solar water-heater cost model which is based on plumbing contractor bids and manufacturer estimates. The cost model was used to size the system to minimize the annualized cost of hot water. The annualized cost of solar-assisted gas-energy water heating is found to be less expensive than electric water heating but more expensive than gas water heating. The feasibility of a natural gas utility supplying the auxiliary fuel is evaluated. It is estimated that gas-utilizing companies will find it profitable to offer solar water heating as part of a total energy service option or on a lease basis when the price of new base-load supplies of natural gas reaches $2.50-$3.00 per million Btu.

Davis, E. S.↗

LST refurbishment and support

The Large Space Telescope (LST) is a Space Shuttle payload with relatively high reliability, but it will require maintenance support in order to meet the operational life requirement of 15 years. It was determined that it would be efficient and economical to support LST by having four limited inflight maintenance (IFM) missions and three ground refurbishments. The IFM missions would include replacement of the four items with a limited operating life. The LST program would provide for a ground refurbishment every four years at a central payload depot. It was recommended that the depot should be located at MSFC and be manned by a permanent party which would be augmented on a temporary basis during LST refurbishments by engineering personnel from the LST contractors. Required spare parts would be acquired incrementally for the depot based on maximum refurbishment of repairable items.

Henschke, J.↗

Fabrication methods for YF-12 wing panels for the Supersonic Cruise Aircraft Research Program

Advanced fabrication and joining processes for titanium and composite materials are being investigated by NASA to develop technology for the Supersonic Cruise Aircraft Research (SCAR) Program. With Lockheed-ADP as the prime contractor, full-scale structural panels are being designed and fabricated to replace an existing integrally stiffened shear panel on the upper wing surface of the NASA YF-12 aircraft. The program involves ground testing and Mach 3 flight testing of full-scale structural panels and laboratory testing of representative structural element specimens. Fabrication methods and test results for weldbrazed and Rohrbond titanium panels are discussed. The fabrication methods being developed for boron/aluminum, Borsic/aluminum, and graphite/polyimide panels are also presented.

Hoffman, E. L.↗

MCC/shuttle test plan. Volume 1: Philosophy and guidelines

The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

Source record↗

Development of fire resistant, nontoxic aircraft interior materials

All available newly developed nonmetallic polymers were examined for possible usage in developing fire resistant, nontoxic nonmetallic parts or assemblies for aircraft interiors. Specifically, feasibility for the development of clear films for new decorative laminates, compression moldings, injection molded parts, thermoformed plastic parts, and flexible foams were given primary considerations. Preliminary data on the flame resistant characteristics of the materials were obtained. Preliminary toxicity data were generated from samples of materials submitted from the contractor. Preliminary data on the physical characteristics of various thermoplastic materials to be considered for either compression molded, injection molded, or thermoformed parts were obtained.

Haley, G.↗

A survey of particle contamination in electronic devices

The experiences are given of a number of National Aeronautics and Space Administration (NASA) and Space and Missile System Organization (SAMSO) contractors with particle contamination, and the methods used for its prevention and detection, evaluates the bases for the different schemes, assesses their effectiveness, and identifies the problems associated with each. It recommends specific short-range tests or approaches appropriate to individual part-type categories and recommends that specific tasks be initiated to refine techniques and to resolve technical and application facets of promising solutions.

Adolphsen, J. W.↗

Study of the cost/benefit tradeoffs for reducing the energy consumption of the commercial air transportation system

Practical means were assessed for achieving reduced fuel consumption in commercial air transportation. Five areas were investigated: current aircraft types, revised operational procedures, modifications to current aircraft, derivatives of current aircraft and new near-term fuel conservative aircraft. As part of a multiparticipant coordinated effort, detailed performance and operating cost data in each of these areas were supplied to the contractor responsible for the overall analysis of the cost/benefit tradeoffs for reducing the energy consumption of the domestic commercial air transportation system. A follow-on study was performed to assess the potential of an advanced turboprop transport aircraft concept. To provide a valid basis for comparison, an equivalent turbofan transport aircraft concept incorporating equal technology levels was also derived. The aircraft as compared on the basis of weight, size, fuel utilization, operational characteristics and costs.

Hopkins, J. P.↗

Cold air investigation of 4 1/2-stage turbine with stage loading factor of 4.66 and high specific work output. 1: Overall performance

The turbine developed design specific work output at design speed at a total pressure ratio of 6.745 with a corresponding efficiency of 0.855. The efficiency (0.855)was 3.1 points lower than the estimated efficiency quoted by the contractor in the design report and 0.7 of a point lower than that determined by a reference prediction method. The performance of the turbine, which was a forced vortex design, agreed with the performance determined by the prediction method to about the same extent as did the performance of three reference high stage loading factor turbines, which were free vortex designs.

Whitney, W. J.↗

Definition of propulsion system for V/STOL research and technology aircraft

Wind tunnel test support, aircraft contractor support, a propulsion system computer card deck, preliminary design studies, and propulsion system development plan are reported. The Propulsion system consists of two lift/cruise turbofan engines, one turboshaft engine and one lift fan connected together with shafting into a combiner gearbox. Distortion parameter levels from 40 x 80 test data were within the established XT701-AD-700 limits. The three engine-three fan system card deck calculates either vertical or conventional flight performance, installed or uninstalled. Design study results for XT701 engine modifications, bevel gear cross shaft location, fixed and tilt fan frames and propulsion system controls are described. Optional water-alcohol injection increased total net thrust 10.3% on a 90 F day. Engines have sufficient turbine life for 500 hours of the RTA duty cycle.

Source record↗