Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

NREL Screens Universities for Solar and Battery Storage Potential

In support of the U.S. Department of Energy's SunShot initiative, NREL provided solar photovoltaic (PV) screenings in 2016 for eight universities seeking to go solar. NREL conducted an initial technoeconomic assessment of PV and storage feasibility at the selected universities using the REopt model, an energy planning platform that can be used to evaluate RE options, estimate costs, and suggest a mix of RE technologies to meet defined assumptions and constraints. NREL provided each university with customized results, including the cost-effectiveness of PV and storage, recommended system size, estimated capital cost to implement the technology, and estimated life cycle cost savings.

14 SOLAR ENERGY↗

Construction Cost Growth for New Department of Energy Nuclear Facilities

Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

42 ENGINEERING↗

SCATS: SRB Cost Accounting and Tracking System handbook

The Solid Rocket Booster Cost Accounting and Tracking System (SCATS) which is an automatic data processing system designed to keep a running account of the number, description, and estimated cost of Level 2, 3, and 4 changes is described. Although designed specifically for the Space Shuttle Solid Rocket Booster Program, the ADP system can be used for any other program that has a similar structure for recording, reporting, and summing numbers and costs of changes. The program stores the alpha-numeric designators for changes, government estimated costs, proposed costs, and negotiated value in a MIRADS (Marshall Information Retrieval and Display System) format which permits rapid access, manipulation, and reporting of current change status. Output reports listing all changes, totals of each level, and totals of all levels, can be derived for any calendar interval period.

Zorv, R. B.↗

Estimating the cost and energy demand of producing lithium manganese oxide for Li-ion batteries

Lithium Manganese Oxide (LMO) is one of the important cathode active materials used in lithium ion batteries of several electric vehicles. In this paper, the production of LMO cathode material for use in lithium-ion batteries is studied. Spreadsheet-based process models have been set up to estimate and analyze the factors affecting the cost of manufacturing, the energy demand, and the environmental impact. Two processes based on the solid-state synthesis method and a sol-gel method have been explored. Results show that the solid-state process is more cost-effective because of its lower cost of raw materials. The production cost for a solid-state process is $7 kg -1 and requires 6 kWh·kg -1 of energy. The pack level cost of electric vehicle battery using LMO as a primary active material is studied as a function of LMO production cost and other parameters. The potential for reducing the cost of automotive batteries to $100 per kWh is explored in terms of LMO price and plant production volume (economy of scale), using Argonne’s BatPaC spreadsheet tool.

25 ENERGY STORAGE↗

Modeling the Deep Space Network costs for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of eight major mission cost drivers such as uplink frequency upgrade, telemetry upgrade, and antenna gain/noise temperature upgrade. This paper focuses on the costs required to modify and/or enhance the DSN to prepare for supporting future space missions. Two models are derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Model A makes it possible to estimate the total cost, and Model B makes it possible to estimate the time profile cost and total cost for DSN support of a similar future space mission. The models were back tested against the total cost and the time profile cost for DSN support of the three projects, and gave cost estimates which range from 17 percent below to 19 percent above actual costs for Model A, and 22.5 percent below to 17.5 percent above for Model B. The total cost Model A was also applied to estimate the total costs for DSN support of two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager), and Viking. This model gave total cost estimates for DSN support which range from 15 percent to 4 percent above actual total costs for MJS and Viking, respectively.

Remer, Donald S.↗

Design Concepts for Co-Production of Power, Fuels & Chemicals Via Coal/Biomass Mixtures

The overall goal of the program is to develop design concepts, incorporating advanced technologies in areas such as oxygen production, feed systems, gas cleanup, component separations and gas turbines, for integrated and economically viable coal and biomass fed gasification facilities equipped with carbon capture and storage for the following scenarios: (i) coproduction of power along with hydrogen, (ii) coproduction of power along with fuels, (iii) coproduction of power along with petrochemicals, and (iv) coproduction of power along with agricultural chemicals. To achieve this goal, specifically the following objectives are met in this proposed project: (i) identify advanced technology options and innovative preliminary design concepts that synergistically integrate plant subsections, (ii) develop steady state system simulations to predict plant efficiency and environmental signature, (iii) develop plant cost estimates by capacity factoring major subsystems or by major equipment items where required, and then capital, operating and maintenance cost estimates, and (iv) perform techno- economic analyses for the above described coproduction facilities. Thermal efficiencies for the electricity only cases with 90% carbon capture are 38.26% and 36.76% (HHV basis) with the bituminous and the lignite feedstocks respectively. For the coproduction cases (where 50% of the energy exported is in the form of electricity), the electrical efficiency, as expected, is highest for the hydrogen coproduction cases while lowest for the higher alcohols (ethanol) coproduction cases. The electrical efficiencies for Fischer-Tropsch coproduction cases are slightly higher than those for the methanol coproduction cases but it should be noted that the methanol (as well as the higher alcohol) coproduction cases produce the finished coproduct while the Fischer-Tropsch coproduction cases produce a coproduct that requires further processing in a refinery. The cross comparison of the thermal performance between the various coproduct cases is further complicated by the fact that the carbon footprint is not the same when carbon leaving with the coproduct are accounted for. The economic analysis and demand for a particular coproduct in the market place is a more meaningful comparison of the various coproduction scenarios. The first year cost of electricity calculated for the bituminous coal is $\$$102.9/MWh while that for the lignite is $\$$108.1/MWh. The calculated cost of hydrogen ranged from $\$$1.42/kg to $\$$2.77/kg depending on the feedstock, which is lower than the DOE announced hydrogen cost goal of $\$$3.00/kg in July 14, 2005. Methanol cost ranged from $\$$345/MT to $\$$617/MT, while the market price is around $\$$450/MT. For Fischer-Tropsch liquids, the calculated cost ranged from $\$$65/bbl to $\$$112/bbl, which is comparable to the current market price of crude oil at around $\$$100/bbl. It should be noted, however, that F-T liquids contain no sulfur and nitrogen compounds. The calculated cost of alcohol ranged from $\$$4.37/gal to $\$$5.43/gal, while it ranged from $\$$2.20/gal to $\$$3.70/gal in a DOE funded study conducted by Louisiana State University. The Louisiana State University study consisted of a significantly larger plant than our study and benefited from economies of scale. When the plant size in our study is scaled up to similar size as in the Louisiana State University study, cost of alcohol is then reduced to a range of $\$$3.24/gal to $\$$4.28/gal, which is comparable. Urea cost ranged from $\$$307/MT to $\$$428/MT, while the market price is around $\$$480/MT.

20 FOSSIL-FUELED POWER PLANTS↗

Parametric Cost Deployment

Parametric cost analysis is a mathematical approach to estimating cost. Parametric cost analysis uses non-cost parameters, such as quality characteristics, to estimate the cost to bring forth, sustain, and retire a product. This paper reviews parametric cost analysis and shows how it can be used within the cost deployment process.

Dean, Edwin B.↗

Sensitivity Analysis of Offshore Wind Cost of Energy (Poster)

No matter the source, offshore wind energy plant cost estimates are significantly higher than for land-based projects. For instance, a National Renewable Energy Laboratory (NREL) review on the 2010 cost of wind energy found baseline cost estimates for onshore wind energy systems to be 71 dollars per megawatt-hour ($/MWh), versus 225 $/MWh for offshore systems. There are many ways that innovation can be used to reduce the high costs of offshore wind energy. However, the use of such innovation impacts the cost of energy because of the highly coupled nature of the system. For example, the deployment of multimegawatt turbines can reduce the number of turbines, thereby reducing the operation and maintenance (O&M) costs associated with vessel acquisition and use. On the other hand, larger turbines may require more specialized vessels and infrastructure to perform the same operations, which could result in higher costs. To better understand the full impact of a design decision on offshore wind energy system performance and cost, a system analysis approach is needed. In 2011-2012, NREL began development of a wind energy systems engineering software tool to support offshore wind energy system analysis. The tool combines engineering and cost models to represent an entire offshore wind energy plant and to perform system cost sensitivity analysis and optimization. Initial results were collected by applying the tool to conduct a sensitivity analysis on a baseline offshore wind energy system using 5-MW and 6-MW NREL reference turbines. Results included information on rotor diameter, hub height, power rating, and maximum allowable tip speeds.

17 WIND ENERGY↗

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.↗

LISA and NASA's Physics of the Cosmos Theme

In the past year, the LISA Project at NASA has completed a major review and has thoroughly reviewed its cost estimates. This talk will summarize the conclusions of the Beyond Einstein Program Assessment, and review the main conclusions of the cost estimation work done at NASA, including reduced mission concepts. Astro2010, the decadal review which sets priorities for astronomy and astrophysics projects in the U.S., is getting organized. Preparing for and participating in Astro2010 will be a crucial activity for the NASA side of the LISA Project in thc next 18 months.

Stebbins, Robin T.↗

Advanced Fuel Cycle Cost Basis Report: Supporting Documents 2 Production Based Costing

The purpose of this section is to outline a method of cost analysis whereby a significantly better representation of “should achieve” costs may be attained for NOAK systems. Based on economists’ notions of producer theory, and grounded in the cost analysts’ and project managers’ tool called the Work Breakdown Structure (WBS), this section describes best practices in cost estimation. It then illustrates how the Code of Accounts (COA) structure, developed by the Economic Modeling Working Group (EMWG) of the Generation IV International Forum in “Cost Estimating Guidelines for Generation IV Nuclear Energy Systems [EMWG 2007] (hereafter “Gen IV Guidelines Document”), can be used to differentiate “should achieve” versus “did experience” costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Mercury Lander: A Planetary Mission Concept Study for the 2023–2032 Decadal Survey

Mercury holds unique clues to the distribution of elements at the birth of the solar system and how planets form and evolve in close proximity to their host stars. The Mercury Lander mission concept returns in situ measurements to: understand Mercury’s unique mineralogy and geochemistry; characterize the massive core’s structure; measure the planet’s active and ancient magnetic fields at the surface; investigate the processes that alter the surface and produce the exosphere; and provide groundtruth for remote datasets. The mission concept achieves one Mercury year (~88 Earth days) of surface operations with an 11-instrument, high-heritage payload delivered to a landing site within Mercury’s widely distributed low-reflectance material, and addresses science goals encompassing geochemistry, geophysics, the Mercury space environment, and geology. The spacecraft launches on an expendable SpaceX Falcon Heavy in 2035. The four-stage flight system uses a solar-electric propulsion cruise stage to reach Mercury in2045. The orbital stage brings the spacecraft into a thermally safe orbit, then performs orbital maneuvers to prepare for descent. During the orbital phase, a narrow-angle camera acquires images for selecting a low-hazard landing zone within our region of interest. The descent stage begins the braking burn ~120 s before landing. The lander continues to touchdown, using continuous LIDAR operations to support hazard detection and safely deliver the payload to the surface. Landing is at dusk to meet thermal requirements, permitting ~30 hours of sunlight for initial observations. The radioisotope-powered lander continues operations through the Mercury night. Direct-to-Earth communication is possible for the initial three weeks of landed operations, drops out for six weeks, and resumes for the final month. Thermal conditions exceed lander operating temperatures shortly after sunrise, ending operations. A total of ~11 GB of data are returned to Earth. The Phase A–D mission cost estimate (50% unencumbered reserves, excluding launch vehicle) is $1.2 B(FY25$), comparing favorably with past New Frontiers missions and to the cost cap in the New Frontiers4 call(~$1.1B FY25$). This cost estimate shows that a Mercury Lander mission is feasible and compelling as a New Frontiers-class mission in the coming decade.

C M Ernst↗

Architecture Studies Done for High-Rate Duplex Direct Data Distribution (D4) Services

A study was sponsored to investigate a set of end-to-end system concepts for implementing a high-rate duplex direct data distribution (D4) space-to-ground communications link. The NASA Glenn Research Center is investigating these systems (both commercial and Government) as a possible method of providing a D4 communications service between NASA spacecraft in low Earth orbit and the respective principal investigators using or monitoring instruments aboard these spacecraft. Candidate commercial services were assessed regarding their near-term potential to provide a D4 type of service. The candidates included K-band and V-band geostationary orbit and nongeostationary orbit satellite relay services and direct downlink (D3) services. Internet protocol (IP) networking technologies were evaluated to enable the user-directed distribution and delivery of science data. Four realistic, near-future concepts were analyzed: 1) A duplex direct link (uplink plus downlink communication paths) between a low-Earth-orbit spacecraft and a principal-investigator-based autonomous Earth station; 2) A space-based relay using a future K-band nongeosynchronous-orbit system to handle both the uplink and downlink communication paths; 3) A hybrid link using both direct and relay services to achieve full duplex capability; 4) A dual-mode concept consisting of both a duplex direct link and a space relay duplex link operating independently. The concepts were analyzed in terms of contact time between the NASA spacecraft and the communications service and the achievable data throughput. Throughput estimates for the D4 systems were based on the infusion of advanced communications technology products (single and multibeam K-band phased-arrays and digital modems) being developed by Glenn. Cost estimates were also performed using extrapolated information from both terrestrial and current satellite communications providers. The throughput and cost estimates were used to compare the concepts.

Source record↗

NASA Software Estimating Tool (N-SET)

The goals of this project are to: Develop an early lifecycle software cost estimation tool leveraging existing data and capabilities Collect additional software data from: a) Jet Propulsion Laboratory; b) Goddard Space Flight Center; and c) Marshall Space Flight Center. Analyze, normalize, evaluate, stratify, and validate data. Create a calibrated, validated, and documented tool initially using available data and subsequently using newly collected data.

cost estimating tools↗

Engineering Design of a Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

Linde carried out an initial engineering design study for a Linde-BASF advanced post combustion CO 2 capture technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. This pre-FEED equivalent study included following: (1) basic design, including specific project scope definition and design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard and operability (HAZOP) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

08 HYDROGEN↗