Search NASA⌕ Search

SEARCH · Search NASA

Results for “Checking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Development of Advanced Czochralski Growth Process to produce low cost 150 KG silicon ingots from a single crucible for technology readiness

The modified CG2000 crystal grower construction, installation, and machine check-out was completed. The process development check-out proceeded with several dry runs and one growth run. Several machine calibrations and functional problems were discovered and corrected. Several exhaust gas analysis system alternatives were evaluated and an integrated system approved and ordered. A contract presentation was made at the Project Integration Meeting at JPL, including cost-projections using contract projected throughput and machine parameters. Several growth runs on a development CG200 RC grower show that complete neck, crown, and body automated growth can be achieved with only one operator input. Work continued for melt level, melt temperature, and diameter sensor development.

Source record↗

Space Shuttle cargo processing.

The spacecraft processing techniques to be used at the Kennedy Space Center for the assembly and check-out of Space Shuttle cargoes are discussed. The processing flow for vertically handled spacecraft, which are inserted into the Shuttle orbiter cargo bay while the orbiter is in the vertical position and often are attached to a separate solid booster stage, includes assembly into unified payloads in the Vertical Processing Facility, followed by Cargo Integration Test Equipment tests to ensure cargo bay compatibility, and transportation to the launch pad. Horizontally handled spacecraft such as Spacelab, which are inserted into the Orbiter cargo bay while it is in the Orbiter Processing Facility in the horizontal position, are assembled and checked out within the Operations and Checkout Building, where the CITE tests are performed and the Spacelab will be disassembled, and then transported to the Orbiter Processing Facility. It is pointed out that during the Space Shuttle era, when the number of spacecraft to be processed simultaneously at Kennedy will double or triple, all spacecraft processing facilities will be required to handle the workload.

Neilon, J. J.↗

The dependence of upstream wave periods on the interplanetary magnetic field strength

It has long been known that the periods of Pc 3, 4 pulsations on the ground correlate with the magnitude of the interplanetary magnetic field. This fact has been used to argue for an exogenic source for these pulsations. Particularly attractive candidates for the source of pulsations in this frequency range are the upstream waves of similar frequencies which are associated with populations of ions reflected from the bow shock. However, the dependence of the period of these waves on the strength of the interplanetary magnetic field has never been checked. This paper performs such a check and confirms that the upstream waves have the proper functional relationship.

Russell, C. T.↗

Group 4: Instructor training and qualifications

Each professional instructor or check airman used in LOFT training course should complete an FAA approved training course in the appropriate aircraft type. Instructors used in such courses need not be type-rated. If an instructor or check airman who is presently not line-qualified is used as a LOFT instructor, he or she should remain current in line-operational procedures by observing operating procedures from the jump seat on three typical line segments pr 90 days on the appropriate aircraft type. ("Line qualification" means completion as a flight crew member of at least three typical line segments per 90 days on the appropriate aircraft type.) The training should include the requirement of four hours of LOFT training, in lieu of actual aircraft training or line operating experience.

Sessa, R.↗

Development of advanced Czochralski growth process to produce low-cost 150 kG silicon ingots from a single crucible for technology readiness

The modified CG2000 crystal grower construction, installation, and machine check out was completed. The process development check out proceeded with several dry runs and one growth run. Several machine calibrations and functional problems were discovered and corrected. Exhaust gas analysis system alternatives were evaluated and an integrated system approved and ordered. Several growth runs on a development CG2000 RC grower show that complete neck, crown, and body automated growth can be achieved with only one operator input.

Source record↗

Spatial and Temporal scales of time-averaged 700 MB height anomalies

The monthly and seasonal forecasting technique is based to a large extent on the extrapolation of trends in the positions of the centers of time averaged geopotential height anomalies. The complete forecasted height pattern is subsequently drawn around the forecasted anomaly centers. The efficacy of this technique was tested and time series of observed monthly mean and 5 day mean 700 mb geopotential heights were examined. Autocorrelation statistics are generated to document the tendency for persistence of anomalies. These statistics are compared to a red noise hypothesis to check for evidence of possible preferred time scales of persistence. Space-time spectral analyses at middle latitudes are checked for evidence of periodicities which could be associated with predictable month-to-month trends. A local measure of the average spatial scale of anomalies is devised for guidance in the completion of the anomaly pattern around the forecasted centers.

Gutzler, D.↗

Mapping of wildlife habitat in Farmington Bay, Utah

Mapping was accomplished through the interpretation of high-altitude color infrared photography. The feasibility of utilizing LANDSAT digital data to augment the analysis was explored; complex patterns of wildlife habitat and confusion of spectral classes resulted in the decision to make limited use of LANDSAT data in the analysis. The final product is a map which delineates wildlife habitat at a scale of 1:24,000. The map is registered to and printed on a screened U.S.G.S. quadrangle base map. Screened delineations of shoreline contours, mapped from a previous study, are also shown on the map. Intensive field checking of the map was accomplished for the Farmington Bay Waterfowl Management Area in August 1981; other areas on the map received only spot field checking.

Jaynes, R. A.↗

Coupled rotor/airframe vibration analysis program manual. Volume 2: Sample input and output listings

Sample input and output listings obtained with the base program (SIMVIB) of the coupled rotor/airframe vibration analysis and the external programs, G400/F389 and E927 are presented. Results for five of the base program test cases are shown. They represent different applications of the SIMVIB program to study the vibration characteristics of various dynamic configurations. Input and output listings obtained for one cycle of the G400/F389 coupled program are presented. Results from the rotor aeroelastic analysis E927 also appear. A brief description of the check cases is provided. A summary of the check cases for all the external programs interacting with the SIMVIB program is illustrated.

Cassarino, S.↗

Ground level reflectance measurement techniques - An evaluation with emphasis on the importance of spectral calibration

The bandpasses, overflight conditions, and sensor geometry that will provide optimum target discrimination in remote-sensing studies can be determined only from spectral reflectance measurements made for various sun-target-sensor geometries, supplemented by model calculations which can be checked against field data. The accurate measurement of ground reflectance properties is critical to the design of future sensors and to the determination of imaging conditions. The current investigation has the objective to review typical methods of measuring spectral reflectance, to point out some of the problems inherent to reflectance measuring techniques, and to present a method of checking measurement accuracy.

Duggin, M. J.↗

Software Specification Language

SSL translator aids in developing and checking software systems. Goal of SSL is to provide form of verification and consistency checking early in design phase. Serves as formal document to communicate software architecure to detailed designers.

Buckles, B. P.↗

Are C1 chondrites chemically fractionated - A trace element study

Six C1 chondrite samples and a C2 xenolith from the Plainview H5 chondrite were analyzed by radiochemical neutron activation for a large variety of elements, including rare earths. The sample processing is described, including the irradiation, chemical procedure, rare earths separation, counting techniques, radiochemical purity check, and chemical yields. The results of consistency checks on a number of elements are discussed. Abundances for siderophiles, volatiles, and rare earths are presented and discussed. Tests are presented for fractionation of rare earths and other refractories, compositional uniformity of C1's, and interelement correlations. There is no conclusive evidence for nebular fractionation affecting C1's. Three fractionation-prone rare earths have essentially the same relative abundances in C1's and all other chondrite classes, and hence are apparently not fractionated in C1's.

Ebihara, M.↗

The calculation of theoretical chromospheric models and the interpretation of solar spectra from rockets and spacecraft

Models and spectra of sunspots were studied, because they are important to energy balance and variability discussions. Sunspot observations in the ultraviolet region 140 to 168 nn was obtained by the NRL High Resolution Telescope and Spectrograph. Extensive photometric observations of sunspot umbrae and prenumbrae in 10 chanels covering the wavelength region 387 to 3800 nm were made. Cool star opacities and model atmospheres were computed. The Sun is the first testcase, both to check the opacity calculations against the observed solar spectrum, and to check the purely theoretical model calculation against the observed solar energy distribution. Line lists were finally completed for all the molecules that are important in computing statistical opacities for energy balance and for radiative rate calculations in the Sun (except perhaps for sunspots). Because many of these bands are incompletely analyzed in the laboratory, the energy levels are not well enough known to predict wavelengths accurately for spectrum synthesis and for detailed comparison with the observations.

Avrett, E. H.↗

Evaluation of airborne lidar wind measurements

The verification of the Doppler lidar wind measurement is continued. The in situ measurements on a 500 meter tall tower are used to check the lidar determined winds (flight 4), followed by other tests applied to the extensive data sets of flights 19 and 21. After checking for possible software errors in the processing programs, the inconsistency was not solved. The source of the errors appears to be the uncertainty in the calculation of the contribution of the aircraft motion to the lidar measured line of sight speed. Possible techniques for estimating the aircraft motion errors from the aircraft data are investigated.

Carroll, J. J.↗

Complementary-Logic Fault Detector

Circuit for checking two-line complementary-logic bits for single faults used as building block for self-checking memory interface for Hammingcoded data. Intended for such applications as fault-tolerant computing, data handling, and data transmission. Circuit performs exclusive-OR function. Many such circuits combined produce complete memory interface with both detection and correction abilities.

Wawrzynek, J. C.↗

Algorithms for Software Development

Management aid makes changes obvious. One key element in scheme for software development control is check summing. If check sum for given line in source file is different from previous version, it is evident change has been made. Subsequent editing of file creates new lines, deletes old ones, modifies characters, moves lines, or copies (reuse) existing lines. Combination of three elements of line code permits all transactions to be detected.

Tausworthe, R. C.↗

Reliability considerations for the total strain range version of strainrange partitioning

A proposed total strainrange version of strainrange partitioning (SRP) to enhance the manner in which SRP is applied to life prediction is considered with emphasis on how advanced reliability technology can be applied to perform risk analysis and to derive safety check expressions. Uncertainties existing in the design factors associated with life prediction of a component which experiences the combined effects of creep and fatigue can be identified. Examples illustrate how reliability analyses of such a component can be performed when all design factors in the SRP model are random variables reflecting these uncertainties. The Rackwitz-Fiessler and Wu algorithms are used and estimates of the safety index and the probablity of failure are demonstrated for a SRP problem. Methods of analysis of creep-fatigue data with emphasis on procedures for producing synoptic statistics are presented. An attempt to demonstrate the importance of the contribution of the uncertainties associated with small sample sizes (fatique data) to risk estimates is discussed. The procedure for deriving a safety check expression for possible use in a design criteria document is presented.

Wirsching, P. H.↗

A Model for the Effectiveness of Aircraft Alerting and Warning Systems

The effectiveness of an alerting system with a single alert was analyzed. The pilot's decision behavior is modeled by the theory of signal detection and therefore accounts for different strengths of cross check information and different pilot criteria. The model includes the effects of the alerting and warning system (CAWS) error rate; the pilot's past experience with the CAWS accuracy; his reliance on the CAWS rather than independent monitoring; missed alerts; and adoption of a minimum error or Neyman-Pearson objective rather than minimum cost objective. It is showwn that for rare events: (1) the expected cost is greatly increased if the pilot ignores the a posteriori information in the existence of an alert; (2) the expected cost is insensitive to CAWS Type 1 errors; and (3) the expected cost is sensitive to CAWS type 2 errors only when the cross check information is ambiguous.

Curry, R. E.↗

Stress analysis of 27% scale model of AH-64 main rotor hub

Stress analysis of an AH-64 27% scale model rotor hub was performed. Component loads and stresses were calculated based upon blade root loads and motions. The static and fatigue analysis indicates positive margins of safety in all components checked. Using the format developed here, the hub can be stress checked for future application.

Hodges, R. V.↗