Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deep Space Exploration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Autonomous Lunar Solar Array (ALSA) 2018: Big Idea Challenge Interns

NASA has aimed its sights towards sending humans back to the moon to develop and test technologies needed for future deep space exploration. Permanent power generation structures will play a key role in establishing habitat and in-situ resource utilization (ISRU) structures. Our group, part of the NASA Big Idea Challenge, came up with a concept for a solar array large enough to power a habitat, ISRU activities, and rover exploration in permanently shadowed lunar craters at the lunar poles.

McNatt, Jeremiah↗

Ultra Long-Lived Autonomous Air Quality Sensing

Environmental sensing will be key to autonomous vehicle operation and crew health monitoring in tended/untended long-duration habitats for Human Space Exploration in deep space. Small wireless sensors, based on Radio Frequency Identification (RFID) technology, can provide unprecedented capacity to monitor crew/habitat health. We propose a next-generation, wireless air quality sensor capable of operating for years on a small coin-cell battery without crew-member intervention.

Wagner, Raymond S.↗

Orbital Syngas Commodity Augmentation Reactor (OSCAR)

The goal of the Orbital Syngas Commodity Augmentation Reactor (OSCAR) project is to study and develop Trash to Gas (TtG) technology in a microgravity environment. This could be implemented on the International Space Station (ISS) and future deep space exploration missions involving long-term human habitation. TtG technology will be used to convert trash and human waste into useful gasses such as methane, hydrogen, water, and carbon dioxide. This will both reduce the spacecraft pressurized volume dedicated for waste storage and provide gaseous commodities that have energy storage and life support applications. As a fall 2018 intern on the OSCAR team at Kennedy Space Center, I helped to prepare the experimental setup for microgravity testing in the drop tower at Glenn Research Center.

McClure, Thomas S.↗

NASA's Work in Exoplanet Hunting Satellites and Robotic Servicing of Satellites

An overview of three missions connected with NASA's Goddard Space Flight Center at the present time: (1) NASA's flagship mission, the James Webb Space Telescope, is nearing its 2021 launch date. The James Webb, which is considered the successor to the Hubble Space Telescope, will orbit at the Earth-Sun Lagrangian Point Two where it will peer back in time, using infrared detectors, to the beginnings of our Universe. (2) NASA is conducting pioneering work in the field of robotic satellite servicing in earth orbit. The RESTORE-L project, which is slated for a 2021 launch date, is expected to pave the way for the inception of robotic assembly for deep space exploration as well as the commercialization of satellite servicing. (3) The Transiting Exoplanet Survey Satellite (TESS) has been orbiting the Earth actively searching for new planets since April of 2018. The discoveries that TESS has made to-date have benefited from a careful characterization of the refractive lens assemblies on its science instruments. The presentation will provide a detailed description of how the index of refraction of the glasses used to fabricate the TESS lens assemblies were measured at Goddard to an accuracy that enables the ability to make exoplanet discoveries hundreds of light years from Earth.

Miller, Kevin H.↗

Applying Research-Based Training Principles: Towards Crew-Centered, Mission-Oriented Space Flight Training

This chapter describes a training approach that applies empirically derived principles of training to re-imagining the overall design of NASA’s space flight training program. The chapter is focused specifically on the design of astronaut training for NASA’s future deep space, exploration missions to Mars. We briefly describe NASA’s space flight training practices during the Apollo and Space Shuttle eras as well as NASA’s current practices for training astronauts for their missions to the International Space Station. We provide an overview of NASA’s current concepts for a mission to Mars to scope our training approach. We envision a new space flight training approach which we term “crew-centered, mission oriented” training, inspired by the design approach offered in the context of airline pilot training by Barshi (2015). We apply some of the training principles reviewed by Kole and his colleagues in the companion volume (Kole, Healy, Schneider & Barshi, 2019), as well as by other researchers in training science (e.g., Ericsson, Krampe, & Tesch-Römer, 1993; Healy & Bourne, 2012; Salas, Wilson, Priest and Guthrie, 2006), into real-world, practical guidelines for the particular context of training astronauts for a mission to Mars.processes over very long retention intervals.

Training↗

Internship at the Office of the Chief Scientist

The NASA Ames Research Center (ARC) Office of the Chief Scientist (OCS) is part of the Center Management. The OCS adds value to the organization by encouraging and facilitating innovation and value to the Agency, Nation, and the scientific community through its well-developed, diverse, and strategically formed charter. The OCS provides the Center with the oversight and advice by facilitating and evaluating the Scientific Innovation Fund (SIF) and promoting science-based research partnerships. Additionally, the Office contributes to to the Agency by organizing annual Summer Series Colloquia, Workshops, and support to the Early Career Network, which allows for international and inter-agency collaborations. Working at the OCS allowed me to further learn about the working of the Office and how the Office engages and provides guidance with rest of the Center and the Agency. As part of my internship, I am working on developing the initial infrastructure required for the organization of the Standardized Distributed Workshop and further developing the layout for the Hibernation Workshop. The Standardized Distributed System workshop will investigate the scope of developing and using standardized distributed systems for a wide range of applications including satellite systems, aerospace-oriented systems, water-based systems, automobiles, and various other robotics applications. The goal of this workshop is to determine the feasibility of developing a standardized distributed system that can be customized for different technological applications, which will enable resource sharing, openness, robustness, and fault tolerance. This workshop will bring together experts from different fields, including satellite operations, unmanned aerial vehicles, aircraft operation and management, and artificial intelligence to provide a global evaluation of the aspects associated with the development and adoption of distributed systems. The workshop will also guide the participants through state of the art distributed systems, discuss some of the challenges in designing control systems with a distributed structure, and consider the future of distributed system based technologies for future applications. Additionally, I am also working on finalizing the details and documentation for the proposed Hibernation Workshop. This workshop will address the phenomenon of hibernation through three major aspects: hibernation on Earth, hibernation in space, and knowledge gaps in the approaches to future deep space exploration. The primary objective of the workshop is to explore the current state of science in the area of hibernation, and as a scientific community, explore the gaps and challenges preventing this scientific field from advancing to the next level. This workshop will consist of presentations, panel discussions, and breakout sessions focused on addressing this scientific field, and bringing experts from educational and commercial sectors together. As a part of my internship report, I will be document the process of planning these workshops and further provide a brief summary of my experience with the 2016 NASA Ames Summer Series and various professional visits.

ISU↗

Comparison of Space Radiation GCR Models to Recent AMS Data

This paper is the third in a series of comparisons of American (NASA) and Russian (ROSCOSMOS) space radiation calculations. The present work focuses on calculation of fluxes of galactic cosmic rays (GCR), which are a constant source of radiation that constitutes one of the major hazards during deep space exploration missions for both astronauts/cosmonauts and hardware. In this work, commonly used GCR models are compared with recently published measurements of cosmic ray Hydrogen, Helium, and the Boron-to-Carbon ratio from the Alpha Magnetic Spectrometer (AMS). All of the models were developed and calibrated prior to the publication of the AMS data, therefore this an opportunity to validate the models against an independent data set.

John W. Norbury↗

Design of Experiment for the Measurement of Aerosol Droplet Size Distribution of Temperature-Controlled Thermally Atomized Printed Electronic Inks

In-Space Manufacturing (ISM) centers around NASA’s growing need and ability to produce space technologies on demand in space. As the future of long term presence in space and deep space exploration approach, fundamental questions of our dependence on earth resupply to Low Earth Orbit (LEO) remain unanswered. ISM is leading various effort to evaluate the feasibility of producing essential spares and redundant parts on demand to enable a sustainable space-based supply chain model for part resupply. Among the parts and systems being considered, Avionics form the neural network of modern day aircraft and space vehicles providing a wealth of information ranging from Guidance, Navigation, and Control (GN&C) systems to on board Environmental Control and Life Support (ECLS) systems. Recent advances in the use of Aerosol Jet Technology to print Avionics components ranging from electrical traces on a circuit board to complex transistors and sensors raise the possibility of using such technology to reproduce or recreate electronic parts on demand with the help of custom electronics 3D printers. The challenge herein lies within the ability of such printers to generate and deposit an aerosol of electronic material utilizing processes independent of or enhanced by gravity to ensure controllably identical or improved behavior of the aerosol in an International Space Station (ISS) laboratory and on the ground. The behavior as well as the hazards and properties associated with such aerosols in a microgravity environment must be understood well in order to merit a feasible approach to utilizing them for manufacturing in space. In this report, we outline the experimental setup of a modified conventional vaping device to be used as the ideal gravity independent thermal atomization mechanism to generate aerosol. Our objective is to identify the ideal mass, density, and volume of our aerosolized droplets of ink to conclude that there exist a threshold of aerosolized ink droplet sizes that are indeed independent of the effects of gravity and remain stable after atomization. We use a Malvern Spraytec® Spray Particle Size Analyzer to perform real-time laser diffraction measurement of our ink droplets during atomization. The droplet size between conductive ink, dielectric ink and vegetable glycerin have been measured and contrasted. Furthermore, the mechanism of thermal atomization versus traditional pneumatic and ultrasonic atomization for operation in microgravity have been explored.

Wu, Chih-Hao↗

Gateway System Requirements

The Gateway Program (GW) System Requirements Document (SRD) is approved for the public domain to support NASA's Lunar Gateway Program. The main intent of these documents is to define top level functional and performance requirements for the systems that facilitate cooperative deep space exploration endeavors and execute lunar missions. The SRD defines NASA requirements for the procurement and development of the GW mission. The Gateway Program is a collaboration of US government, international partners and commercial providers. The Gateway SRD are expected to be used by all parties in development of the Gateway Program elements. For effective development and integration of the Gateway vehicle, all involved entities must use, and have awareness of, these high level program requirements to flow down to their respective developmental responsibilities so all Gateway elements will be operable as an entity. The Gateway SRD represents the requirements that are necessary for the Gateway mission. NASA has determined there is benefit to U.S. and foreign spacecraft developers to approve this information for the public domain because all the parties/participants need a common understanding of the requirements and the parameters under which they operate (size, shape, form fit and function). This will allow systems built by various nations and commercial entities to attach and function together properly and safely in the hostile environment of space.The Gateway SRD provides information regarding the current requirements for Gateway elements. Specifically, the Gateway SRD provide an overview of expected features and capabilities and requirements for safe integration of elements within the Gateway program. The SRD contains top-level functional and performance descriptions of the Gateway and definition of the interfaces limited to the scope necessary for integration purposes between Gateway elements. The documents do NOT contain detailed design information or any specifics of hardware or software implementation. The data approved for release does not include: manufacturing drawings, detailed interface control and design data, software code, detailed CAD models, structural or thermal models of the system, avionics or avionics box, board, or cable manufacturing information.

Adamek, Christopher↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

Towards Crew-Centered, Mission-Oriented Space Flight Training

This poster describes a training approach that applies empirically derived principles of training to reimagining the overall design of NASA's space flight training program. The poster is focused specifically on the design of astronaut training for NASA's future deep space, exploration missions to Mars. We briefly describe NASA's space flight training practices during the Apollo and Space Shuttle eras as well as NASA's current practices for training astronauts for their missions to the International Space Station. We provide an overview of NASA's current concepts for a mission to Mars to scope our training approach. We envision a new space flight training approach which we term crew-centered, mission oriented training, inspired by the design approach offered in the context of airline pilot training by Barshi. We apply research-based training principles reviewed by Kole and his colleagues, as well as by other researchers in training science, into real-world, practical guidelines for the particular context of training astronauts for a mission to Mars.

Dempsey, Donna L.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Urine Removal from Suited Crew in Orion Vehicle Depressurization Scenario

Humankind wants to continually venture deeper into space, but there are many hazards of deep space exploration. NASA’s Orion Program seeks to incrementally identify these hazards and begin addressing the difficulties of such long-duration missions. One of the largest risks and areas of program focus is crew survival in a vehicle cabin depressurization scenario. As part of proactive mitigation efforts, contingency operations and associated hardware are being developed to sustain crew members for up to 6 days. While the Orion launch and entry suit would provide the crew a pressurized safe haven for that duration, additional systems are needed to handle crew waste while within the suit. NASA’s Orion Crew Survival Systems (OCSS) and Collins Aerospace are working together to develop and test an external suit system to aid in the evacuation of urine from pressurized suits to ensure crew health and safety. This paper describes the recent and on-going design and testing that is driving evolution of hardware and requirements towards eventual flight certification.

OCSS↗

Comparison of Space Radiation GCR Models to AMS Heavy Ion Data

Galactic cosmic rays (GCR) are a constant source of radiation that constitutes one of the major hazards during deep space exploration missions for both astronauts and hardware. In this work, GCR models commonly used by the space radiation protection community are compared with recently published high-precision, high- resolution measurements of cosmic ray lithium, beryllium, boron, carbon, nitrogen, and oxygen fluxes along with their ratios (Li/B, Li/C, Li/O, Be/B, Be/C, Be/O, B/C, B/O, C/O, N/B, N/O) from the Alpha Magnetic Spectrometer (AMS). All of the models were developed and calibrated prior to the publication of this AMS data, therefore this is an opportunity to validate the models against an independent data set. This paper is a compliment to the previously published comparison of GCR models with AMS hydrogen, helium, and the boron-to-carbon ratio.

Whitman, Kathryn↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗