When Where and Why: The Geologic Context of Lost Circulation While Drilling in a Crystalline Geothermal Reservoir.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
PIOGA Tech Water & Waste Management Training, Canonsburg, PA, October 26, 2022
Abstract not provided.
The present disclosure relates to a laser system for processing a material. The system may make use of a laser configured to intermittently generate a first laser pulse of a first duration and a first average power, at a spot on a surface of the material being processed, and a second laser pulse having a second duration and a second peak power. The second duration may be shorter than the first duration by a factor of at least 100, and directed at the spot. The second laser pulse is generated after the first laser pulse is generated. The first laser pulse is used to heat the spot on the surface of the material, while the second laser pulse induces a melt motion and material ejection of molten material from the melt pool.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.