Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

High-stability compact atomic clock based on isotropic laser cooling

We present a compact cold-atom clock configuration where isotropic laser cooling, microwave interrogation, and clock signal detection are successively performed inside a spherical microwave cavity. For ground operation, a typical Ramsey fringe width of 20 Hz has been demonstrated, limited by the atom cloud's free fall in the cavity. The isotropic cooling light's disordered properties provide a large and stable number of cold atoms, leading to a high signal-to-noise ratio limited by atomic shot noise. A relative frequency stability of 2.2x10{sup -13{tau}-1/2} has been achieved, averaged down to 4x10{sup -15} after 5x10{sup 3} s of integration. Development of such a high-performance compact clock is of major relevance for on-board applications, such as satellite-positioning systems. As a cesium clock, it opens the door to a new generation of compact primary standards and timekeeping devices.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 9)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 10)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crew/cargo and logistics module definition

The logistics requirements for the space station cargo, the initial buildup, and the 90 day resupply are presented, along with the conceptual selection for the orbiter crew accommodations and the GSS logistics system. Various module configurations are outlined; structural/mechanical, environmental, temperature, voice communication, and data bus subsystems are also reviewed. Ground operations and module prelaunch and launch operations are discussed, as well as logistics system interfaces for space shuttles and stations.

Source record↗

Shuttle/Agena study. Volume 2, part 2: Agena tug configurations, Shuttle/Agena interface, performance, safety, cost

An evaluation of the compatibility of the space shuttle and Agena rocket vehicle was conducted. The Agena space tug configuration design is described in terms of the total vehicle system as well as the individual subsystems and major assemblies and components. The complete interface between the Agena space tug and the space shuttle orbiter is defined for in-flight and ground operations. The derivation and design of an evolutionary stage is also presented. This vehicle conforms to the same guidelines and interface requirements as the Agena space tug. Performance data developed for both vehicles for each of the three study baseline missions are included.

Source record↗

High-sensitivity receiver for infrared laser communications.

Description of a high-sensitivity wide-bandwidth 10.6-micron heterodyne receiver for space and ground operational use. The receiver includes a cooled HgCdTe infrared mixer diode, a conical scanner for spatial tracking, an acquisition channel for spatial search and station alignment, and an automatic frequency-control channel to maintain a fixed laser frequency offset. The infrared mixer is designed to provide nearly quantum-noise-limited operation over an extended range of mixer temperature, bias voltage, and intermediate frequency. The resultant experimental receiver has a measured noise equivalent power of less than 10 to the minus 19th W/Hz over the 15- to 40-MHz i.f. band for mixer temperatures from 85 to 115 K, and less than 2 x 10 to the minus 19th W/Hz up to 140 K. Mixer 3-dB cutoff frequencies as high as 420 MHz were measured at a mixer temperature of 125 K. An analysis and engineering equations are given for receiver noise components, noise equivalent power, available mixer conversion gain, mixer transducer gain, and quantum-noise factor in terms of such factors as mixer parameters, quantum efficiency, mixer temperature, dynamic conductance, bias voltage, local oscillator power, and i.f. amplifier characteristics.

Peyton, B. J.↗

Cost estimation for unmanned lunar and planetary programs

A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost data were collected and analyzed for eight lunar and planetary programs. Total cost was separated into the following components: labor, overhead, materials, and technical support. The study determined that direct labor cost of unmanned lunar and planetary programs comprises 30 percent of the total program cost. Twelve program categories were defined for modeling: six spacecraft subsystem categories (science, structure, propulsion, electrical power, communications, and guidance and integration, test and quality assurance, launch and flight operations, ground equipment, systems analysis and engineering, and program management). An analysis showed that on a percentage basis, direct labor cost and direct labor manhours compare on a one-to-one ratio. Therefore, direct labor hours is used as the parameter for predicting cost, with the advantage of eliminating the effect of inflation on the analysis.

Dunkin, J. H.↗

Inertial reference unit

The inertial reference unit is a high performance gyro attitude reference system for use on the OAO spacecraft. The IRU is a three axis system, which provides both rate and attitude information for spacecraft control. The purpose of the IRU is to reduce the dependency on gimballed startrackers and, in turn, simplify the OAO ground operations by eliminating the need for the continual programming of gimballed startracker assignments in accordance with computed occultation schedules. During normal operations, it is used to control the pitch and yaw axes during experiment occultations and during spacecraft reorientations. The roll axis is continuously under control of the IRU except during brief periods for attitude update. To provide for these capabilities the IRU must be able to perform two basic functions. One is to maintain an inertially fixed reference for spacecraft control and the second is to accurately reorient the reference upon command.

Kull, F. J.↗

Space Shuttle - The new baseline

Recent design alterations and refinements in the Space Shuttle program are considered with particular attention to the present baseline Shuttle configurations, performance characteristics, mission profiles, and flight and ground operations. Hardware and software development and testing, propulsion systems, entry trajectory events, and payload capability are covered. The refined Space Shuttle system design is characterized as one reflecting firm technical and economic considerations. Systems development is well under way, with all major contractors progressing on schedule.

Malkin, M. S.↗

Shuttle sortie electro-optical instruments study

A study to determine the feasibility of adapting existing electro-optical instruments (designed and sucessfully used for ground operations) for use on a shuttle sortie flight and to perform satisfactorily in the space environment is considered. The suitability of these two instruments (a custom made image intensifier camera system and an off-the-shelf secondary electron conduction television camera) to support a barium ion cloud experiment was studied for two different modes of spacelab operation - within the pressurized module and on the pallet.

Source record↗

Space Tug avionics definition study. Volume 2: Avionics functional requirements

Flight and ground operational phases of the tug/shuttle system are analyzed to determine the general avionics support functions that are needed during each of the mission phases and sub-phases. Each of these general support functions is then expanded into specific avionics system requirements, which are then allocated to the appropriate avionics subsystems. This process is then repeated at the next lower level of detail where these subsystem requirements are allocated to each of the major components that comprise a subsystem.

Source record↗

Spacelab user implementation assessment study (software requirements analysis). Volume 1: Executive study

The primary objective of this study was to develop an integrated approach for the development, implementation, and utilization of all software that is required to efficiently and cost-effectively support advanced technology laboratory flight and ground operations. It was recognized that certain aspects of the operations would be mandatory computerized services; computerization of other aspects would be optional. Thus, the analyses encompassed not only alternate computer utilization and implementations but trade studies of the programmatic effects of non-computerized versus computerized approaches to the operations. A general overview of the study is presented.

Source record↗

Environmental Health concerns in natural and man-made environments

Industrial hygene and environmental health aspects of ground operation at the Jet Propulsion Laboratory were investigated. Major areas of concern are: (1) toxic substances, (2) noise pollution, (3) electromagnetic radiation; and (4) biohazards and sanitation. Each of these categories are also studied in a closed environment, such as encountered aboard of a spacecraft.

Bergtholdt, C. P.↗

Mars surface penetrator: System description

A point design of a penetrator system for a Mars mission is described. A strawman payload which is to conduct measurements of geophysical and meteorological parameters is included in the design. The subsystems used in the point design are delineated in terms of power, mass, volume, data, and functional modes. The prospects for survival of the rigors of emplacement are described. Data handling and communications plans are presented to allow consideration of the requirements placed by the penetrator on the orbiter and ground operations. The point design is technically feasible and the payload selection scientifically desirable.

Manning, L. A.↗

Shuttle's 160 hour ground turnaround - A design driver

Turnaround analysis added a new dimension to the Space Program with the advent of the Space Shuttle. The requirement to turn the flight hardware around in 160 working hours from landing to launch was a significant design driver and a useful tool in forcing the integration of flight and ground systems design to permit an efficient ground operation. Although there was concern that time constraints might increase program costs, the result of the analysis was to minimize facility requirements and simplify operations with resultant cost savings.

Widick, F.↗