Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Experiment-modeling studies comparing energy dissipation in the DIII-D SAS and SAS-VW divertors

Recent DIII-D experiments on Small Angle Slot (SAS) divertors have confirmed that a combination of divertor closure and target shaping can enhance cooling across the divertor target and increase energy dissipation, but with significant dependence on B T (toroidal magnetic field) direction. In these novel divertors, the roles of closure, target shaping, drifts, and scale lengths are all interconnected in optimizing dissipation, with the separatrix electron density n eSEP being the key parameter associated with the level of dissipation/detachment. After modifying the original flat-targeted graphite SAS to include a V shape with a tungsten coating on the outer side of the divertor (SAS-VW), matched series of discharges were run to compare to detailed SOLPS-ITER modeling. Experimentally, when run as designed with the outer strike point at the slot vertex, SAS-VW requires nearly identical n eSEP for detachment as the original SAS, with little difference in dissipation for the new geometry. This is in contrast to (1) earlier modeling predictions that a small change of the SAS geometry to a V shape should enhance dissipation at the same n eSEP for magnetic configurations having better H-mode access (ion B × ∇B drift directed into the divertor), and (2) despite the achievement of significantly higher (2-7x) neutral pressures and compression in the SAS-VW slot. Comparisons of experimental density scans to the most recent SOLPS-ITER modeling with ExB drifts show reasonable agreement for dissipation/detachment onset when using separatrix density as the independent parameter. In order to help understand the discrepancy in modeled vs actual performance for the new configuration, additional measurements varying gas injection location and impurity injection were undertaken. In-slot D 2 gas fueling is more effective (5–22 %) in promoting detachment, in accord with modeling. In-slot impurity injection (N 2 or Ne) can yield 30 % lower core Z eff and 15 % less confinement degradation after detachment compared to main chamber puffing, as well as relatively lower tungsten leakage from the divertor. Modeling can also reproduce the improved detachment seen as the strike point moves inboard of the slot vertex. While we can explain the effects of the most important parameters causing energy dissipation in these slot divertors, it remains that many aspects of their behavior cannot be accurately modeled using state-of-art codes such as SOLPS-ITER. This is of concern for future model-driven designs utilizing similar V-shaped geometries.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Role of State Utility Regulators in a Just and Reasonable Energy Transition: Examining Regulatory Approaches to the Economic Impacts of Coal Retirements

The ongoing trend of coal retirements has disproportionately affected the socioeconomic health of communities where power plants are located. For many public utility commissions, these impacts have led to important questions around the scope of PUCs’ statutory authority to analyze, consider and mitigate losses to host communities within their role as utility regulators. Due largely to variations in state legislative charges, commissions have taken different approaches to articulating what lies within the public interest.This report examines the authority of PUCs across the country to consider non-energy economic impacts beyond direct ratepayer effects, and summarizes approaches that PUCs, utilities and other stakeholders have used to mitigate the economic fallout of coal retirements, specifically.

01 COAL, LIGNITE, AND PEAT↗

Field surveying data of low-cost networked flood sensors in southeast Texas

Floods are common natural disasters worldwide and pose substantial risks to life, property, food production, and natural resources. Effective measures for flood mitigation and warning are essential. Southeast Texas is still at significant risk of flooding, and Lamar University is assisting the region with asset management of a flood sensor network for flooding events. This network provides real-time water stage information. Lamar University developed a survey program to measure elevation and coordinates at each sensor site location to make this data more useful for flood monitoring and mapping. This paper overviews the measurement of the elevation and coordinates of 74 networked flood sensors and various flood stage thresholds at critical points that flood decision-makers can use for reference at each site. In the first phase of this program, these sensors were deployed throughout a 7-county region spanning nearly 6,000 square miles in Southeast Texas. The latitude and longitude of the sensors and their elevations were determined using survey-grade Global Navigation Satellite System (GNSS) technology. Various Continually Operating Reference Stations (CORS) were utilized for post-processing to achieve sub-inch resolution. The flood stage thresholds, water level sensors elevation, and the elevations and positions of other critical surrounding points are viewable to the public through two online repositories and a web-based sensor management dashboard. The data is used to aid with decisions related to road closures or modeling efforts by mitigation decision-makers, emergency managers, and the public, including the Texas Department of Transportation, Houston Transtar, the National Weather Service, and the Sabine River Authority of Texas (SRA).

54 ENVIRONMENTAL SCIENCES↗

Southwestern Regional Partnership For Carbon Sequestration (Phase 2) Pump Canyon CO2- ECBM/Sequestration Demonstration, San Juan Basin, New Mexico

Within the Southwest Regional Partnership on Carbon Sequestration (SWP), three demonstrations of geologic CO{sub 2} sequestration are being performed -- one in an oilfield (the SACROC Unit in the Permian basin of west Texas), one in a deep, unmineable coalbed (the Pump Canyon site in the San Juan basin of northern New Mexico), and one in a deep, saline reservoir (underlying the Aneth oilfield in the Paradox basin of southeast Utah). The Pump Canyon CO{sub 2}-enhanced coalbed methane (CO{sub 2}/ECBM) sequestration demonstration project plans to demonstrate the effectiveness of CO{sub 2} sequestration in deep, unmineable coal seams via a small-scale geologic sequestration project. The site is located in San Juan County, northern New Mexico, just within the limits of the high-permeability fairway of prolific coalbed methane production. The study area for the SWP project consists of 31 coalbed methane production wells located in a nine section area. CO{sub 2} was injected continuously for a year and different monitoring, verification and accounting (MVA) techniques were implemented to track the CO{sub 2} movement inside and outside the reservoir. Some of the MVA methods include continuous measurement of injection volumes, pressures and temperatures within the injection well, coalbed methane production rates, pressures and gas compositions collected at the offset production wells, and tracers in the injected CO{sub 2}. In addition, time-lapse vertical seismic profiling (VSP), surface tiltmeter arrays, a series of shallow monitoring wells with a regular fluid sampling program, surface measurements of soil composition, CO{sub 2} fluxes, and tracers were used to help in tracking the injected CO{sub 2}. Finally, a detailed reservoir model was constructed to help reproduce and understand the behavior of the reservoir under production and injection operation. This report summarizes the different phases of the project, from permitting through site closure, and gives the results of the different MVA techniques.

01 COAL, LIGNITE, AND PEAT↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flat CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).

54 ENVIRONMENTAL SCIENCES↗

EFFECT OF CLIMATE CHANGE ON WATERSHED RUNOFF FLOW - UPPER COOSA RIVER BASIN UPSTREAM FROM PLANT HAMMOND

The ability of water managers to maintain adequate supplies in the coming decades depends on future weather conditions, as climate change has the potential to reduce stream flows from their current values due to potentially less precipitation and higher temperatures, and possibly rendering them unable to meet demand. The upper Coosa River basin, located in northwest Georgia, plays an important role in supplying water for industry and domestic use in northern Georgia, and has been involved in water disputes in recent times. The seven-day ten-year low flow (7Q10 flow) is the lowest average flow for seven consecutive days that has an average recurrence interval of 10 years. The 7Q10 flow is statistically derived from the observed historical flow data, and represents the low flow (drought) condition for a basin. The upper Coosa River basin also supplies cooling water for the 935MW coal-fired Hammond plant, which draws about 65% of the 7Q10 flow of the upper Coosa River to dissipate waste heat. The water is drawn through once and returned to the river directly from the generator (i.e., no cooling tower is used). Record low flows in 2007 led to use of portable cooling towers to meet temperature limits. Disruption of the Plant Hammond operation may trigger closure of area industrial facilities (e.g. paper mill). The population in Georgia is expected to double from 9 million to 18 million residents in the next 25 years, mostly in the metropolitan Atlanta area. Therefore, there will be an even greater demand for potable water and for waste assimilation. Climate change in the form of persistent droughts (causing low flows) and high ambient temperatures create regulatory compliance challenges for Plant Hammond operating with a once-through cooling system. Therefore, the Upper Coosa River basin was selected to study the effect of potential future weather change on the watershed runoff flow.

54 ENVIRONMENTAL SCIENCES↗

Diffusion and Leaching Behavior of Radionuclides in Category 3 Waste Encasement Concrete and Soil Fill Material – Summary Report

One of the methods being considered for safely disposing of Category 3 low-level radioactive wastes is to encase the waste in concrete. Such concrete encasement would contain and isolate the waste packages from the hydrologic environment and would act as an intrusion barrier. The current plan for waste isolation consists of stacking low-level waste packages on a trench floor, surrounding the stacks with reinforced steel, and encasing these packages in concrete. These concrete-encased waste stacks are expected to vary in size with maximum dimensions of 6.4 m long, 2.7 m wide, and 4 m high. The waste stacks are expected to have a surrounding minimum thickness of 15 cm of concrete encasement. These concrete-encased waste packages are expected to withstand environmental exposure (solar radiation, temperature variations, and precipitation) until an interim soil cover or permanent closure cover is installed, and to remain largely intact thereafter. Any failure of concrete encasement may result in water intrusion and consequent mobilization of radionuclides from the waste packages. The mobilized radionuclides may escape from the encased concrete by mass flow and/or diffusion and move into the surrounding subsurface environment. Therefore, it is necessary to assess the performance of the concrete encasement structure and the ability of the surrounding soil to retard radionuclide migration. The retardation factors for radionuclides contained in the waste packages can be determined from measurements of diffusion coefficients for these contaminants through concrete and fill material. Some of the mobilization scenarios include (1) potential leaching of waste form before permanent closure cover is installed; (2) after the cover installation, long-term diffusion of radionuclides from concrete waste form into surrounding fill material; (3) diffusion of radionuclides from contaminated soils into adjoining concrete encasement and clean fill material. Additionally, the rate of diffusion of radionuclides may be affected by the formation of structural cracks in concrete, the carbonation of the buried waste form, and any potential effect of metallic iron (in the form of rebars) on the mobility of radionuclides. The radionuclides iodine-129 ({sup 129}I), technetium-99 ({sup 99}Tc), and uranium-238 ({sup 238}U) are identified as long-term dose contributors in Category 3 waste (Mann et al. 2001; Wood et al. 1995). Because of their anionic nature in aqueous solutions, {sup 129}I, {sup 99}Tc, and carbonate-complexed {sup 238}U may readily leach into the subsurface environment (Serne et al. 1989, 1992a, b, 1993, and 1995). The leachability and/or diffusion of radionuclide species must be measured to assess the long-term performance of waste grouts when contacted with vadose-zone pore water or groundwater. Although significant research has been conducted on the design and performance of cementitious waste forms, the current protocol conducted to assess radionuclide stability within these waste forms has been limited to the Toxicity Characteristic Leaching Procedure, Method 1311 Federal Registry (EPA 1992) and ANSI/ANS-16.1 leach test (ANSI 1986). These tests evaluate the performance under water-saturated conditions and do not evaluate the performance of cementitious waste forms within the context of waste repositories which are located within water-deficient vadose zones. Moreover, these tests assess only the diffusion of radionuclides from concrete waste forms and neglect evaluating the mechanisms of retention, stability of the waste form, and formation of secondary phases during weathering, which may serve as long-term secondary hosts for immobilization of radionuclides. The results of recent investigations conducted under arid and semi-arid conditions (Al-Khayat et al. 2002; Garrabrants et al. 2002; Garrabrants and Kosson 2003; Garrabrants et al. 2004; Gervais et al. 2004; Sanchez et al. 2002; Sanchez et al. 2003) provide valuable information suggesting structural and chemical changes to concrete waste forms which may affect contaminant containment and waste form performance. However, continued research is necessitated by the need to understand: the mechanism of contaminant release; the significance of contaminant release pathways; how waste form performance is affected by the full range of environmental conditions within the disposal facility; the process of waste form aging under conditions that are representative of processes occurring in response to changing environmental conditions within the disposal facility; the effect of waste form aging on chemical, physical, and radiological properties, and the associated impact on contaminant release. Recent reviews conducted by the National Academies of Science recognized the efficacy of cementitious materials for waste isolation, but further noted the significant shortcomings in our current understanding and testing protocol for evaluating the performance of various formulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Theoretical Studies of Some HEDM Species: Cyclic O4, Cyclic O3 and Cubane

Calculations have been carried out for the HEDM species (cyclic O4, cyclic O3, and cubane) using CASSCF/derivative and CASSCF/ICCI methods. Cyclic O4 is of interest both as a potential HEDM species and because of its possible role in the ozone deficit problem in atmospheric chemistry. We have studied the pathway for decomposition from the D(2d) minimum and also have found the approximate location of the singlet triplet crossing. The barrier to decomposition is found to be about 9 kcal/mol and is not limited by the singlet triplet crossing. For cyclic O3 we have focused on the crossings between the lowest five surfaces (X(1)A(1), s(1)A(1), (1)A(2), (1)B(1), and (1)B(2)) to provide some insight into ways to form cyclic O3 photochemically. The crossing region between the X(1)A(1) and 2(1)A(1) surfaces is in agreement with the work of Xantheas et al. The calculations show that vertical excitation from the ground state to the (1)A(2) state leads to a crossing with the (1)A(1) manifold near the crossing region of the X(1)A(1) and 2(1)A(1) surfaces. We have studied the decomposition pathways for cubane to benzene plus acetylene and to cyclooctatetraene. We have also studied the ground and excited states for the photochemical ring closure step. The state which closes to cubane can be described as a double triplet pi to pi* excitation with respect to the ground state. Thus, this state has only a small oscillator strength with respect to the ground state. However, there is a singlet pi to pi* state at nearly the same energy and excitation to this state followed by intersystem crossing could lead to the triplet pi to pi* state.

Walch, Stephen P.↗

Airborne Radar for sUAS Sense and Avoid

A primary challenge for the safe integration of small UAS operations into the National Airspace System (NAS) is traffic deconfliction, both from manned and unmanned aircraft. The UAS Traffic Management (UTM) project being conducted at the National Aeronautics and Space Administration (NASA) considers a layered approach to separation provision, ranging from segregation of operations through airspace volumes (geofences) to autonomous sense and avoid (SAA) technologies for higher risk, densely occupied airspace. Cooperative SAA systems, such as Automatic Dependent Surveillance-Broadcast (ADS-B) and/or vehicle-to-vehicle communication systems provide significant additional risk mitigation but they fail to adequately mitigate collision risks for non-cooperative (non-transponder equipped) airborne aircraft. The RAAVIN (Radar on Autonomous Aircraft to Verify ICAROUS Navigation) flight test being conducted by NASA and the Mid-Atlantic Aviation Partnership (MAAP) was designed to investigate the applicability and performance of a prototype, commercially available sUAS radar to detect and track non-cooperative airborne traffic, both manned and unmanned. The radar selected for this research was a Frequency Modulated Continuous Wave (FMCW) radar with 120 degree azimuth and 80 degree elevation field of view operating at 24.55GHz center frequency with a 200 MHz bandwidth. The radar transmits 2 watts of power thru a Metamaterial Electronically Scanning Array antenna in horizontal polarization. When the radar is transmitting, personnel must be at least 1 meter away from the active array to limit nonionizing radiation exposure. The radar physical dimensions are 18.7cm by 12.1cm by 4.1cm and it weighs less than 820 grams making it well suited for installation on small UASs. The onboard, SAA capability, known as ICAROUS, (Independent Configurable Architecture for Reliable Operations of Unmanned Systems), developed by NASA to support sUAS operations, will provide autonomous guidance using the traffic radar tracks from the onboard radar. The RAAVIN set of studies will be conducted in three phases. The first phase included outdoor, ground-based radar evaluations performed at the Virginia Tech’s Kentland Farm testing range in Blacksburg, VA. The test was designed to measure how well the radar could detect and track a small UAS flying in the radar’s field of view. The radar was used to monitor 5 test flights consisting of outbound, inbound and crossing routes at different ranges and altitudes. The UAS flown during the ground test was the Inspire 2, a quad copter weighing less than 4250 grams (10 pounds) at maximum payload. The radar was set up to scan and track targets over its full azimuthal field of view from 0 to 40 degrees in elevation. The radar was configured to eliminate tracks generated from any targets located beyond 2000 meters from the radar and moving at velocities under 1.45 meters per second. For subsequent phases of the study the radar will be integrated with a sUAS platform to evaluate its performance in flight for SAA applications ranging from sUAS to manned GA aircraft detections and tracking. Preliminary data analysis from the first outdoor ground tests showed the radar performed well at tracking the vehicle as it flew outbound and repeatedly maintained a track out to 1000 meters (maximum 1387 meters) until the vehicle slowed to a stop to reverse direction to fly inbound. As the Inspire flew inbound tracks from beyond 800 meters, a reacquisition time delay was consistently observed between when the Inspire exceeds a speed of 1.45 meters per second and when the radar indicated an inbound target was present and maintained its track. The time delay varied between 6 seconds to over 37 seconds for the inbound flights examined, and typically resulted in about a 200 meter closure distance before the Inspire track was maintained. The radar performed well at both acquiring and tracking the vehicle as it flew crossing routes out past 400 meters across the azimuthal field of view. The radar and ICAROUS software will be integrated and flown on a BFD-1400-SE8-E UAS during the next phase of the RAAVIN project. The main goal at the conclusion of this effort is to determine if this radar technology can reliably support minimum requirements for SAA applications of sUAS. In particular, the study will measure the range of vehicle detections, lateral and vertical angular errors, false and missed/late detections, and estimated distance at closest point of approach after an avoidance maneuver is executed. This last metric is directly impacted by sensor performance and indicates its suitability for the task.

Szatkowski, George N.↗

Adaptative Site Management for a 115 Acre Chlorinated Solvent Plume with Two Separate Source Areas at Kennedy Space Center, Florida

Background/Objectives. During Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) activities, Geosyntec delineated a chlorinated volatile organic compound (CVOC) plume at the National Aeronautics and Space Administration’s (NASA’s) Vehicle Assembly Building (VAB) area located at KSC, Florida. The RFI activities identified an approximate 115-acre dissolved plume (primarily vinyl chloride) and a trichloroethene (TCE) source area in an active aerospace complex that is surrounded by sensitive wetland/waterbodies. Due to the size of the impacted area, the Corrective Measure Design included a multi-component strategy: (i) address the source area via bioremediation; (ii) protect sensitive wetlands from impacted groundwater discharge via biosparging; and (iii) Long Term Monitoring (LTM) of the remaining dissolved plume. After the Corrective Measures implementation (CMI), NASA and Geosyntec worked with Florida Department of Environmental Protection (FDEP) to implement an adaptive site management for the complex, 115-acre site outside of the traditional RCRA process. The adaptive site management approach relied on performing supplemental assessments and implementing Interim Measures (IMs) to further assess and implement remedies over time while working within site and budget constraints, with an overall goal of achieving enough mass reduction to transition the entire site to LTM and eventually achieve site closure. Approach/Activities. After the biosparge barrier was operational and bioremediation within the source area (referred to as Hot Spot 1) achieved the Corrective Action Objective (CAO), supplemental assessment of the area between Hot Spot 1 and the biosparge barrier was performed. The conceptual site model was updated using the supplemental assessment results and an air sparge system IM was designed to treat an approximate 1.2 acre area (referred to as Hot Spot 2). After installation of the air sparge system, supplemental assessment within the remainder of the 115-acre dissolved plume was performed and a second TCE source area was identified. The TCE source area and associated areas with elevated CVOC concentrations (referred to as Hot Spot 3) were delineated and a bioremediation IM was implemented. Also, the downgradient impacts from Hot Spot 3 were adjacent to a sensitive waterbody, and negotiations with the FDEP allowed the area to be monitored using LTM. Results/Lessons Learned. The performance of supplemental assessment activities and implementation of remedial alternatives as IMs allowed NASA to successfully address groundwater impacts over time, while working within the FDEP regulatory framework. The implementation of the CMI and multiple IMs has achieved the following goals: (i) the biosparge barrier has mitigated the potential discharge of impacted groundwater to an adjacent wetland; (ii) enhanced bioremediation within Hot Spot 1 achieved the CAO within 2 years and transitioned the area into LTM; (iii) operation of an air sparge system within Hot Spot 2 removed TCE as a constituent of concern and contributed to a reduction (approximately 43%) in the impacted groundwater area outside the air sparge treatment area (plume collapse); and (iv) bioremediation within Hot Spot 3 removed approximately 80% of the CVOC mass and contributed to a reduction (approximately 47%) in the impacted groundwater area outside the bioremediation IM treatment area. Overall, the adaptive approach is protecting the sensitive water bodies surrounding the complex site and reducing the area of impacted groundwater, which is moving the entire site towards LTM.

Rebecca C Daprato↗

Advanced Composite Wind Turbine Blade Design Based on Durability and Damage Tolerance

The objective of the program was to demonstrate and verify Certification-by-Analysis (CBA) capability for wind turbine blades made from advanced lightweight composite materials. The approach integrated durability and damage tolerance analysis with robust design and virtual testing capabilities to deliver superior, durable, low weight, low cost, long life, and reliable wind blade design. The GENOA durability and life prediction software suite was be used as the primary simulation tool. First, a micromechanics-based computational approach was used to assess the durability of composite laminates with ply drop features commonly used in wind turbine applications. Ply drops occur in composite joints and closures of wind turbine blades to reduce skin thicknesses along the blade span. They increase localized stress concentration, which may cause premature delamination failure in composite and reduced fatigue service life. Durability and damage tolerance (D&DT) were evaluated utilizing a multi-scale micro-macro progressive failure analysis (PFA) technique. PFA is finite element based and is capable of detecting all stages of material damage including initiation and propagation of delamination. It assesses multiple failure criteria and includes the effects of manufacturing anomalies (i.e., void, fiber waviness). Two different approaches have been used within PFA. The first approach is Virtual Crack Closure Technique (VCCT) PFA while the second one is strength-based. Constituent stiffness and strength properties for glass and carbon based material systems were reverse engineered for use in D&DT evaluation of coupons with ply drops under static loading. Lamina and laminate properties calculated using manufacturing and composite architecture details matched closely published test data. Similarly, resin properties were determined for fatigue life calculation. The simulation not only reproduced static strength and fatigue life as observed in the test, it also showed composite damage and fracture modes that resemble those reported in the tests. The results show that computational simulation can be relied on to enhance the design of tapered composite structures such as the ones used in turbine wind blades. A computational simulation for durability, damage tolerance (D&DT) and reliability of composite wind turbine blade structures in presence of uncertainties in material properties was performed. A composite turbine blade was first assessed with finite element based multi-scale progressive failure analysis to determine failure modes and locations as well as the fracture load. D&DT analyses were then validated with static test performed at Sandia National Laboratories. The work was followed by detailed weight analysis to identify contribution of various materials to the overall weight of the blade. The methodology ensured that certain types of failure modes, such as delamination progression, are contained to reduce risk to the structure. Probabilistic analysis indicated that composite shear strength has a great influence on the blade ultimate load under static loading. Weight was reduced by 12% with robust design without loss in reliability or D&DT. Structural benefits obtained with the use of enhanced matrix properties through nanoparticles infusion were also assessed. Thin unidirectional fiberglass layers enriched with silica nanoparticles were applied to the outer surfaces of a wind blade to improve its overall structural performance and durability. The wind blade was a 9-meter prototype structure manufactured and tested subject to three saddle static loading at Sandia National Laboratory (SNL). The blade manufacturing did not include the use of any nano-material. With silica nanoparticles in glass composite applied to the exterior surfaces of the blade, the durability and damage tolerance (D&DT) results from multi-scale PFA showed an increase in ultimate load of the blade by 9.2% as compared to baseline structural performance (without nano). The use of nanoparticles lead to a delay in the onset of delamination. Load-displacement relationships obtained from testing of the blade with baseline neat material were compared to the ones from analytical simulation using neat resin and using silica nanoparticles in the resin. Multi-scale PFA results for the neat material construction matched closely those from test for both load displacement and location and type of damage and failure. AlphaSTAR demonstrated that wind blade structures made from advanced composite materials can be certified with multi-scale progressive failure analysis by following building block verification approach.

17 WIND ENERGY↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Concept for Operation of the Belgian Geological Disposal Facility for Category B and C Wastes - 19247

For more than 40 years, ONDRAF/NIRAS (the federal agency responsible for managing radioactive waste and enriched fissile materials in Belgium) has been studying the concept of a geological disposal facility (GDF) in poorly indurated clays as an option for the long-term management of both category B waste (low-level and intermediate-level long-lived waste - LILW-LL) and category C waste (high-level waste - HLW and spent fuel). In the absence of a policy decision, the proposed Belgian reference option for disposal of such waste is a GDF in poorly indurated clays, located at a depth of between 200 m and 600 m. Within the framework of the first Safety and Feasibility Case (SFC-1) undertaken by ONDRAF/NIRAS, the organization is updating its former GDF layout, which dates back from 2003. The SFC-1 GDF concept is characterized by a central zone in which shafts, joined by a central connecting gallery, provide two surface connections. On opposing sides of the central gallery, four (two on each side) access galleries branch off to connect the disposal areas for B- and C-waste, respectively. Disposal dead end galleries, 400 m long, branch off perpendicular to the access galleries. Both waste areas will be operated during two separate time frames. The current underground layout has been significantly modified from the previous 2003 layout. The modifications are largely based on several R and D studies with regard to the future operations of the GDF carried out by BGE Technology GmbH in support to ONDRAF/NIRAS. This paper focuses on major operational processes such as waste transport and emplacement. In addition, the current conceptual design of the backfilling and closure concept is presented. Optimization studies on the further development of the operational process are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Temperature, humidity and air flow in the emplacement drifts using convection and dispersion transport models

A coupled thermal-hydrologic-airflow model is developed, solving for the transport processes within a waste emplacement drift and the surrounding rockmass together at the proposed nuclear waste repository at Yucca Mountain. Natural, convective air flow as well as heat and mass transport in a representative emplacement drift during post-closure are explicitly simulated, using the MULTIFLUX model. The conjugate, thermal-hydrologic transport processes in the rockmass are solved with the TOUGH2 porous-media simulator in a coupled way to the in-drift processes. The new simulation results show that large-eddy turbulent flow, as opposed to small-eddy flow, dominate the drift air space for at least 5000 years following waste emplacement. The size of the largest, longitudinal eddy is equal to half of the drift length, providing a strong axial heat and moisture transport mechanism from the hot to the cold drift sections. The in-drift results are compared to those from simplified models using a surrogate, dispersive model with an equivalent dispersion coefficient for heat and moisture transport. Results from the explicit, convective velocity simulation model provide higher axial heat and moisture fluxes than those estimated from the previously published, simpler, equivalent-dispersion models, in addition to showing differences in temperature, humidity and condensation rate distributions along the drift length. A new dispersive model is also formulated, giving a time- and location-variable function that runs generally about ten times higher in value than the highest dispersion coefficient currently used in the Yucca Mountain Project as an estimate for the equivalent dispersion coefficient in the emplacement drift. The new dispersion coefficient variation, back-calculated from the convective model, can adequately describe the heat and mass transport processes in the emplacement drift example.

54 ENVIRONMENTAL SCIENCES↗

Numerical Modelling of Radionuclide Migration in the Context of a Near-Surface LILW Disposal Facility - 18618

The reference solution for the management of low and intermediate level short-lived waste (LILW) in France consists in their emplacement in concrete vaults built at the near-surface. The corresponding disposal facility under operation by the French waste management organization (Andra), is located in North-eastern France and planned to be closed in 2060. The safety case developed by Andra has to show the evidence that, amongst other aspects, the radionuclide transfer through the confinement barriers will occur in such a way that the human and environmental exposure will be as low as reasonably achievable (ALARA) and in accordance with the dose constraints. For this purpose, modelling is used to integrate uncertainties about the characteristics of concrete components, waste and water table and their evolution in time and space. At last, modelling is finally used to investigate the radiological impact of specific scenarios in which the failure of safety barriers occurs. In the frame of its technical review of the safety assessment, the French Institute for Radiological Protection and Nuclear Safety (IRSN) also performs such kind of numerical modelling of radionuclide fate from the waste to the hydrogeological outlets, in order to check whether the assessment performed by Andra takes into account sufficiently conservative assumptions. The present work aims to evaluate the role of components of the vaults on radionuclide transport during the post-closure period over a few thousand years. For this purpose, IRSN carries out numerical calculations with MELODIE software, which simulates water flow and transport of species, in order to simulate radionuclide migration from waste packages emplaced in a concrete vault to the surrounding groundwater. The developed transport model focuses on 3-H radionuclide and integrates Andra's main assumptions (release model from the waste packages, chemical and hydraulic properties of the vault components, shrinkage and cracks in concrete components). An adaptive mesh method, based on an a posteriori error estimator, was used to model the cracks and the consideration of a strong heterogeneity in the hydraulic and transport parameters values in the different components of the model. This method shows an improvement of results of about 40 times, whereas the mesh size was increased by only 2%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the high flux beam reactor at Brookhaven Lab

The high-flux beam reactor (HFBR) at the Brookhaven National Laboratory was a heavy water cooled and moderated reactor that achieved criticality on Oct. 31, 1965. It operated at a power level of 40 megawatts. An equipment upgrade in 1982 allowed operations at 60 megawatts. After a 1989 reactor shutdown to reanalyze safety impact of a hypothetical loss of coolant accident, the reactor was restarted in 1991 at 30 megawatts. The HFBR was shut down in December 1996 for routine maintenance and refueling. At that time, a leak of tritiated water was identified by routine sampling of groundwater from wells located adjacent to the reactor's spent fuel pool. The reactor remained shut down for almost three years for safety and environmental reviews. In November 1999 the United States Dept. of Energy decided to permanently shut down the HFBR. The decontamination and decommissioning of the HFBR complex, consisting of multiple structures and systems to operate and maintain the reactor, were complete in 2009 after removing and shipping off all the control rod blades. The emptied and cleaned HFBR dome, which still contains the irradiated reactor vessel, is presently under 24/7 surveillance for safety. Detailed dosimetry performed for the HFBR decommissioning during 1996-2009 is described in the paper. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of a Comprehensive Two-Phase Flow Database for the Validation of NEK-2P

Three-dimensional (3-D) two-phase Computational Fluid Dynamics (CFD) codes are emerging as a powerful and potentially practical tool for applications in which detailed local flow information is needed. However, two-phase flow models and associated closure relations are not well established for CFD applications, which is partly due to the lack of high-quality validation data. The main objective of this work is to develop a comprehensive database of two-phase flows that can be used to validate two-phase CFD codes such as NEK-2P. In this project, four advanced local measurement systems, including Particle Image Velocimetry and Planar Laser-Induced Fluorescence (PIV-PLIF), high-speed imaging, x-ray densitometry, and multi-sensor conductivity probe are employed to measure the local two-phase flow parameters of both gas and liquid phases. By combining these techniques, the local void fraction, bubble velocity, interfacial area concentration, bubble frequency, liquid velocity, turbulence intensity, etc., in various two-phase flow regimes can be obtained. These local measurement techniques are first used in a 25.4 mm circular pipe test section. Seven air-water two-phase flow conditions spanning the bubbly, slug, churn-turbulent, and annular flow regimes are measured in this facility. The obtained database contains the radial profiles of both gas- and liquid-phase parameters at three axial locations along the test section. The second facility used in this work contains a 30 mm × 10 mm rectangular test section, in which three two-phase flow and two single-phase flow conditions are measured. Two-dimensional distributions of local two-phase flow parameters in the cross-sectional plane are measured in this facility at three axial locations as well. A facility featuring a 3×3 electrically heated rod bundle is also designed and being constructed in this project. This facility is specially designed for optical measurements and is expected to provide high-quality boiling data in the future. Preliminary analyses have been performed for the data taken in the 25.4 mm circular pipe. Both center-peaked and wall-peaked void fraction profiles have been observed in the data depending on the two-phase flow conditions and/or developing lengths. The 1-D drift-flux model was evaluated with the newly obtained datasets, in which both gas- and liquid-phases data were directly measured. The distribution parameter model has been optimized based on a new void-profile classification method proposed in this study. The optimized drift-flux model shows a significant improvement in predicting both gas velocity and void fraction. The measured liquid-phase turbulence was used to benchmark Sato’s turbulence model considering the bubble-induced shear stress for the three tested bubbly flows. The benchmark results showed good agreement between the PIV measurements and model predictions. In the bubbly flows tested that have low void fractions less than 3%, the effect of the bubble-induced turbulence was found not significant. However, the bubble-induced shear stress becomes important with the increase of the void fraction. The Conjugate Heat Transfer (CHT) model was developed and implemented in NEK-2P. This model allows the coupled simulation of the solid domain and two-phase fluid domain, allowing the specification of realistic boundary conditions. The CHT implementation was verified first with non-boiling simulations. The predicted temperatures in the fluid domain were shown to be identical in simulations with or without the CHT model. The CHT model was then validated through simulations of three Becker benchmark CHF tests performed under both Dryout (DO) and Departure from Nucleate Boiling (DNB) conditions. Reasonably good agreement was obtained between calculated wall temperatures and corresponding experimental data.

42 ENGINEERING↗

Determining Drying Conditions to Mitigate Hanford Transfer Line Corrosion

Hanford Site Background • Hanford site located in Washington State and established in 1943: 1460 km2 • Since 1988 the site has been engaged in a comprehensive environmental clean-up effort. Waste Tanks • 177 underground tanks with 56 million gallons of high-level radioactive waste and chemical waste in 150 Single Shell Tanks (SSTs) and 27 Double Shell Tanks (DSTs)

Shukla, Pavan K. [Savannah River National Laborato↗