Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Mars 2020 Model Based Systems Engineering Pilot

The pilot study is led by the Integration Engineering group in NASA's Launch Services Program (LSP). The Integration Engineering (IE) group is responsible for managing the interfaces between the spacecraft and launch vehicle. This pilot investigates the utility of Model-Based Systems Engineering (MBSE) with respect to managing and verifying interface requirements. The main objectives of the pilot are to model several key aspects of the Mars 2020 integrated operations and interface requirements based on the design and verification artifacts from Mars Science Laboratory (MSL) and to demonstrate how MBSE could be used by LSP to gain further insight on the interface between the spacecraft and launch vehicle as well as to enhance how LSP manages the launch service. The method used to accomplish this pilot started through familiarization of SysML, MagicDraw, and the Mars 2020 and MSL systems through books, tutorials, and NASA documentation. MSL was chosen as the focus of the model since its processes and verifications translate easily to the Mars 2020 mission. The study was further focused by modeling specialized systems and processes within MSL in order to demonstrate the utility of MBSE for the rest of the mission. The systems chosen were the In-Flight Disconnect (IFD) system and the Mass Properties process. The IFD was chosen as a system of focus since it is an interface between the spacecraft and launch vehicle which can demonstrate the usefulness of MBSE from a system perspective. The Mass Properties process was chosen as a process of focus since the verifications for mass properties occur throughout the lifecycle and can demonstrate the usefulness of MBSE from a multi-discipline perspective. Several iterations of both perspectives have been modeled and evaluated. While the pilot study will continue for another 2 weeks, pros and cons of using MBSE for LSP IE have been identified. A pro of using MBSE includes an integrated view of the disciplines, requirements, and verifications leading up to launch. The model allows IE to understand the relationships between disciplines throughout test activities and verifications. Additionally, the relationships between disciplines and integration tasks are generally consistent. The model allows for the generic relationships and tasks to be captured and used throughout multiple mission models should LSP further pursue MBSE. A con of MBSE is the amount of time it takes upfront to understand MBSE and create a useful model. The upfront time it takes to create a useful model is heavily discussed in MBSE literature and is a consistent con throughout the known applications of MBSE. The need to understand SysML and the software chosen also poses the possibility of a "bottleneck" or one person being the sole MBSE user for the working group. The utility of MBSE will continue to be evaluated through the remainder of the study. In conclusion, the original objectives of the pilot study were to use artifacts from MSL to model key aspects of Mars 2020 and demonstrate how MBSE could be used by LSP to gain insight into the spacecraft and launch vehicle interfaces. Progress has been made in modeling and identifying the utility of MBSE to LSP IE and will continue to be made until the pilot study's conclusion in mid-August. The results of this study will produce initial models, modeling instructions and examples, and a summary of MBSE's utility for future use by LSP.

Dukes, Alexandra Marie↗

Mars transit vehicle thermal protection system: Issues, options, and trades

A Mars mission is characterized by different mission phases. The thermal control of cryogenic propellant in a propulsive vehicle must withstand the different mission environments. Long term cryogenic storage may be achieved by passive or active systems. Passive cryo boiloff management features will include multilayer insulation, vapor cooled shield, and low conductance structural supports and penetrations. Active boiloff management incorporates the use of a refrigeration system. Key system trade areas include active verses passive system boiloff management (with respect to safety, reliability, and cost) and propellant tank insulation optimizations. Technology requirements include refrigeration technology advancements, insulation performance during long exposure, and cryogenic fluid transfer system for mission vehicle propellant tanking during vehicle buildip in LEO.

Brown, Norman↗

Nuclear electric propulsion: A better, safer, cheaper transportation system for human exploration of Mars

NASA has completed a preliminary mission and systems study of nuclear electric propulsion (NEP) systems for 'split-sprint' human exploration and related robotic cargo missions to Mars. This paper describes the study, the mission architecture selected, the NEP system and technology development needs, proposed development schedules, and estimated development costs. Since current administration policy makers have delayed funding for key technology development activities that could make Mars exploration missions a reality in the near future, NASA will have time to evaluate various alternate mission options, and it appears prudent to ensure that Mars mission plans focus on astronaut and mission safety, while reducing costs to acceptable levels. The split-sprint nuclear electric propulsion system offers trip times comparable to nuclear thermal propulsion (NTP) systems, while providing mission abort opportunities that are not possible with 'reference' mission architectures. Thus, NEP systems offer short transit times for the astronauts, reducing the exposure of the crew to intergalactic cosmic radiation. The high specific impulse of the NEP system, which leads to very low propellant requirements, results in significantly lower 'initial mass in low earth orbit' (IMLEO). Launch vehicle packaging studies show that the NEP system can be launched, assembled, and deployed, with about one less 240-metric-ton heavy lift launch vehicle (HLLV) per mission opportunity - a very Technology development cost of the nuclear reactor for an NEP system would be shared with the proposed nuclear surface power systems, since nuclear systems will be required to provide substantial electrical power on the surface of Mars. The NEP development project plan proposed includes evolutionary technology development for nuclear electric propulsion systems that expands upon SP-100 (Space Power - 100 kw(e)) technology that has been developed for lunar and Mars surface nuclear power, and small NEP systems for interplanetary probes. System upgrades are expected to evolve that will result in even shorter trip times, improved payload capabilities, and enhanced safety and reliability.

Clark, John S.↗

Making or Breaking a Rover: System Engineering Parameters On-Board the Mars 2020 Perseverance Rover

On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.

Roth, Brian↗

Making or Breaking a Rover- Systems Engineering Parameters On-Board the Mars 2020 Perseverance Rover

On February 18, 2021, Perseverance, NASA’s Jet Propulsion Laboratory’s (JPL’s) Mars 2020 Rover, successfully landed on Mars with all systems nominal, despite the risk surrounding the over 200,000 internal flight parameters that had to be properly configured. The Perseverance team defines these parameters as software variables that are configurable, commandable and retrievable from Earth. In 2015, the Mars 2020 project leaders focused on improving systems engineering of parameters based on their experiences from parameter management on previous Mars rovers (Curiosity, Opportunity, Spirit, and Pathfinder) and parameter failures of past missions, such as the mission-ending parameter of the Mars Climate Orbiter. The new rigorous development process allowed for efficient certification and effective implementation of the parameters, allowing the rover to approach and land on the red planet (the most challenging phase of the mission) with zero parameter issues. Although successful, the Perseverance team learned many lessons for how to better manage parameters for the continued surface operations of the Mars 2020 mission and future missions. This paper will discuss eight parameter-management topics for the Perseverance Mission. The first is parameter definition: how we define parameters on our mission, where they are physically located on the vehicle, and why we have so many of them. The second topic is the updated parameter flight software module from Curiosity, including details on the 99% reduction in parameter commands, new bulk configuration capabilities, and improved parameter traceability. The third topic is parameter selection for different mission phases; this includes improving and tweaking our preferred parameter settings until they become certification candidates and managing parameter configurations based on test venue throughout the mission life cycle. The fourth topic is our flight certification process; this includes certification of flight values for four different epochs in the mission: Launch, Entry Decent and Landing (EDL) - 6days, Landing + 5 Sols (Martian Days, still on Cruise Flight Software), and once are on Surface Flight Software (FSW). The fifth topic covers in-flight command implementation, along with details on testing, validation, and verification of those commands. In the sixth section, we will explain our use of open-source management tools, including how we used GitHub for version control and management approvals. The seventh topic will describe the ground tools used in operations, including capabilities of the in-house built tool called Parasol. The eighth and final topic will dig into lessons learned for improving parameter management in the future of this mission and others.

Roth, Brian↗

Design and Stability Analysis of Control System in Multiport Autonomous Reconfigurable Solar Power Plants (MARS)

The Multiport Autonomous Reconfigurable Solar Power Plant (MARS) is an integrated photovoltaic (PV) power generation and energy storage system (ESS), that is designed to connect to both alternating current (AC) transmission grids and high-voltage direct current (HVDC) links. It is a three-phase plant consisting of numerous components with a complex hardware and hierarchical control architecture. This paper presents an approach to decouple the multivariable system of MARS using a recursive reduced-order and boundary layer system methodology. This approach enables efficient computation of the control parameters for the Ll, L2, and L3 controllers. To validate the effectiveness of the proposed control strategy, cyclic tests in accordance with pre-defined performance criteria using controller Hardware-in-the-Loop (cHIL) experiments are conducted. The results demonstrate that the MARS system operates consistently under steady-state conditions. Furthermore, the dynamic response of the MARS system to various grid events is analyzed, underlining the resilience of MARS in presence of faults or loss of generation within the connected WECC system.

Xia, Qian↗

Demonstration of Critical Systems for Propellant Production on Mars for Science and Exploration Missions

A Mars hopper has been proposed as a Mars mobility concept that will also demonstrate and advance in-situ resource utilization. The components needed in a Mars propellant production plant have been developed to various levels of technology maturity, but there is little experience with the systems in a Mars environment. Two systems for the acquisition and compression of the thin carbon dioxide atmosphere were designed, assembled, and tested in a Mars environment chamber. A microchannel sorption pump system was able to raise the pressure from 7 Torr to 450 Torr or from 12 Torr to over 700 Torr in two stages. This data now provides information needed to make additional improvements in the sorption pump technology to increase performance, although a system-level analysis might prove that some amount of pre- or post-compression may be a preferred solution. A mini cryofreezer system was also evaluated as an alternative method for carbon dioxide acquisition and compression. Finally, an electrolysis system was tested and successfully demonstrated start-up operation and thermal stability of all components during long-term operation in the chamber.

Linne, Diane L.↗

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing‐site selection and infrastructure development which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo predeploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth‐Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20. PEVs would contain closed loop guidance and provide life support and consumables for two crew for 2 weeks plus reserves. The PEV has a cabin that uses the exploration atmosphere of 8.2 psi with 34% oxygen, enabling use of suit ports for rapid EVA with minimal oxygen prebreathe as well as dust control by keeping the suits outside the pressurized volume. When equipped with outriggers and control moment gyros, the PEV enables EVA tasks of up to 8 pounds of force application without the need to anchor. Tasks with higher force requirements can be performed with PEV propulsion providing the necessary thrust to react forces. Exploration of Phobos builds heavily from the developments of the cis‐lunar proving ground, and significantly reduces Mars surface risk by facilitating the development and testing of habitats, MAVs, and pressurized rover cabins that are all Mars surface forward. A robotic precursor mission to Phobos and Deimos is also under consideration and would need to launch in 2022 to support a 2031 human Phobos mission.

Gernhardt, Michael L.↗

Photovoltaic power system operation in the Mars environment

Detailed information on the environmental conditions on Mars are very desirable for the design of photovoltaic systems for establishing outposts on the Martian surface. The variation of solar insolation (global, direct, and diffuse) at the Viking lander's locations is addressed. It can be used, to a first approximation, for other latitudes. The radiation data is based on measured optical depth of the Martian atmosphere derived from images taken of the sun with a special diode on the Viking cameras; and computation based on multiple wavelength and multiple scattering of the solar radiation. The data are used to make estimates of photovoltaic system power, area and mass for a surface power system using regenerative fuel cells for storage and nighttime operation.

Appelbaum, Joseph↗

Photovoltaic power system operation in the Mars environment

Detailed information on the environmental conditions on Mars are very desirable for the design of photovoltaic systems for establishing outposts on the Martian surface. The variation of solar insolation (global, direct, and diffuse) at the Viking lander's locations is addressed. It can be used, to a first approximation, for other latitudes. The radiation data is based on measured optical depth of the Martian atmosphere derived from images taken of the sun with a special diode on the Viking cameras; and computation based on multiple wavelength and multiple scattering of the solar radiation. The data are used to make estimates of photovoltaic system power, area and mass for a surface power system using regenerative fuel cells for storage and nighttime operation.

Appelbaum, Joseph↗

An Igneous Origin for Features of a Candidate Crater-Lake System in Western Memnonia, Mars

The association of channels, inner terraces, and delta-like features with Martian impact craters has previously been interpreted as evidence in favor of the past existence of crater lakes on Mars. However, examination of a candidate crater-lake system in western Memnonia suggests instead that its features may have formed through igneous processes involving the flow and ponding of lava. Accumulations of material in craters and other topographic lows throughout much of the study region have characteristics consistent with those of volcanic deposits, and terraces found along the inner flanks of some of these craters are interpreted as having formed through drainage or subsidence of volcanic materials. Channels previously identified as inlets and outlets of the crater-lake system are interpreted instead as volcanic rilles. These results challenge previous interpretations of terrace and channel features in the study region and suggest that candidate crater lakes located elsewhere should be reexamined.

Leverington, D. W.↗

Fission Surface Power Technology Development Testing at NASA's Early Flight Fission Test Facility

Fission surface power (FSP) systems could be used to provide power anytime, anywhere on the surface of the Moon or Mars. FSP systems could be used at polar locations, at locations away from the poles, or in permanently shaded regions, with excellent performance at all sites. A potential reference 40 kWe option has been devised that is cost-competitive with alternatives while providing more power for less mass anywhere on the lunar surface. The reference FSP system (FSPS) is also readily extensible for use on Mars. At Mars the system would be capable of operating through global dust storms and providing year-round power at any Martian latitude. Under the NASA Exploration Technology Development Program (ETDP), NASA and the Department of Energy (DOE) have begun technology development on Fission Surface Power (FSP). The primary customer for this technology is the NASA Constellation Program which is responsible for the development of surface systems to support human exploration on the moon and Mars. The objectives of the FSP technology project are: 1) Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FSP design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow Agency decision-makers to consider FSP as a viable option for flight development. To be mass efficient, FSP systems must operate at higher coolant temperatures and use different types of power conversion than typical terrestrial systems. The primary reason is the difficulty in rejecting excess heat to space. Although many options exist, NASA s current reference FSP system uses a fast spectrum, pumped-NaK cooled reactor coupled to a Stirling power conversion subsystem. The reference system uses technology with significant terrestrial heritage while still providing excellent performance on the surface of the moon or Mars. Recent testing at NASA s Early Flight Fission Test Facility (EFF-TF) has helped assess the viability of the reference FSP system, and has helped evaluate methods for system integration. In June, 2009, a representative pumped NaK loop (provided by Marshall Space Flight Center) was coupled to a Stirling power converter (provided by Glenn Research Center) and tested at various conditions representative of those that would be seen during actual FSP system operation. In all areas, performance of the integrated system exceeded project goals. High-temperature NaK pump testing has also been performed at the EFF-TF, as has testing of methods for providing long-duration NaK purity.

Houts. Michael G.↗

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing-site selection and infrastructure development, which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo pre-deploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth-Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20.

Gernhardt, Michael L.↗

A solar power system for an early Mars expedition

As NASA looks at missions that will expand human presence in the solar system, the power requirements for such missions need to be defined, developed and analyzed. One mission under consideration consists of a 40 day manned Mars surface expedition to perform science experiments. The mission time was centered around an aerocentric longitude (Ls) of 90 deg to lessen the probability of an occurrence of a local or planetary dust storm. The mission site was arbitrarily located at the Martian equator. The power requirements were assumed to be 40 kWe for life support and experiment power during the Martian day and 20 kWe for life support during the Martian night. A solar energy system consisting of roll-out amorphous silicon arrays and a hydrogen-oxygen regenerative fuel cell energy storage system was chosen for the study. The power available from a roll-out array, when plotted against time, approaches a cosine-like curve and depends on both array area and the amount of solar irradiance impinging on its horizontal surface. The array is sized to provide at least 20 KWe when the sun is 12.5 deg above the horizon and ramp up to 140 kWe peak power at Martian noon. In this configuration, the array is capable of supplying 40 KWe continuously to the user for the majority of the Martian day while supplying the excess energy to the electrolyzer portion of the energy storage system. A roll-out, pumped loop radiator system is used to dissipate the waste heat produced by the fuel cell. The power management and distribution system inverts the power from the individual solar array sub-modules and the fuel cell stacks and connects them to a 440 VAC single phase 20 kHz main bus. The total power system is comprised of 80 individual solar array modules with an integral bus and three energy storage modules consisting of fuel cell and electrolyzer stacks, reactant storage tanks, and a roll-out radiator. Power system mass, stowed volume, and deployed area were determined. Day/night power splits of 40/10 kWe, 40/30 kWe, and 40/40 kWe were also considered to determine the impact of a range of nighttime power requirements on the baseline system.

Mckissock, Barbara I.↗