Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power system faults”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Lightweight Battery Charge Regulator Used to Track Solar Array Peak Power

A battery charge regulator based on the series-connected boost regulator (SCBR) technology has been developed for high-voltage spacecraft applications. The SCBR regulates the solar array power during insolation to prevent battery overcharge or undercharge conditions. It can also be used to provide regulated battery output voltage to spacecraft loads if necessary. This technology uses industry-standard dc-dc converters and a unique interconnection to provide size, weight, efficiency, fault tolerance, and modularity benefits over existing systems. The high-voltage SCBR shown in the photograph has demonstrated power densities of over 1000 watts per kilogram (W/kg). Using four 150-W dc-dc converter modules, it can process 2500 W of power at 120 Vdc with a minimum input voltage of 90 Vdc. Efficiency of the SCBR was 94 to 98 percent over the entire operational range. Internally, the unit is made of two separate SCBR s, each with its own analog control circuitry, to demonstrate the modularity of the technology. The analog controllers regulate the output current and incorporate the output voltage limit with active current sharing between the two units. They also include voltage and current telemetry, on/off control, and baseplate temperature sensors. For peak power tracking, the SCBR was connected to a LabView-based data acquisition system for telemetry and control. A digital control algorithm for tracking the peak power point of a solar array was developed using the principle of matching the source impedance with the load impedance for maximum energy transfer. The algorithm was successfully demonstrated in a simulated spacecraft electrical system at the Boeing PhantomWorks High Voltage Test Facility in Seattle, Washington. The system consists of a 42-string, high-voltage solar array simulator, a 77-cell, 80-ampere-hour (A-hr) nickel-hydrogen battery, and a constant power-load module. The SCBR and the LabView control algorithm successfully tracked the solar array peak power point through various load transients, including sunlight discharge transients when the total load exceeded the maximum solar array output power.

Soeder, James F.↗

On the Investigation of Phase Fault Classification in Power Grid Signals: A Case Study for Support Vector Machines, Decision Tree and Random Forest

In monitoring the power grid, an ability to differentiate between fault types is essential to ensuring electrical safety. Accordingly, this study introduces a fault detection and classification method by considering different machine learning (ML) and feature extraction (FE) methods combinations. Specifically, the proposed method is established in two classification layers; the first layer determines the fault, and the second layer distinguishes the type of fault. Based on the proposed system model, this study seeks to determine the influential data attributes in a power grid signal using FE methods, including fast Fourier transform, power spectral density (PSD), auto-correlation, and wavelet transform (WT). A cross-comparison of the effectiveness of the Support Vector Machine (SVM), Decision Tree (DT), and Random Forest (RF) is also performed to accomplish the classification layers of the proposed method. The designed algorithm is analyzed under the various combinations of FE and ML methods, and outcomes are presented by considering the trade-off between computational complexity and prediction accuracy. The results reveal that the RF-based ML algorithm shows the most accurate classification performance with PSD, and the most time-saving of the models is the DT WT. Also, SVM emerges superior on a subsequent test of the simulated models on real-world signals.

Galbraith, Kelli↗

Fault location in High Voltage Multi-terminal dc Networks Using Ensemble Learning

Precise location of faults for large distance power transmission networks is essential for faster repair and restoration process. High Voltage direct current (HVdc) networks using modular multi-level converter (MMC) technology has found its prominence for interconnected multi-terminal networks. This allows for large distance bulk power transmission at lower costs. However, they cope with the challenge of dc faults. Fast and efficient methods to isolate the network under dc faults have been widely studied and investigated. After successful isolation, it is essential to precisely locate the fault. The post-fault voltage and current signatures are a function of multiple factors and thus accurately locating faults on a multi-terminal network is challenging. In this paper, we discuss a novel data-driven ensemble learning based approach for accurate fault location. Here we utilize the eXtreme Gradient Boosting (XGB) method for accurate fault location. The sensitivity of the proposed algorithm to measurement noise, fault location, resistance and current limiting inductance are performed on a radial three-terminal MTdc network designed in Power System Computer Aided Design (PSCAD)/Electromagnetic Transients including dc (EMTdc).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ice-Penetrating Robot for Scientific Exploration

The cryo-hydro integrated robotic penetrator system (CHIRPS) is a partially developed instrumentation system that includes a probe designed to deeply penetrate the European ice sheet in a search for signs of life. The CHIRPS could also be used on Earth for similar exploration of the polar ice caps especially at Lake Vostok in Antarctica. The CHIRPS probe advances downward by a combination of simple melting of ice (typically for upper, non-compacted layers of an ice sheet) or by a combination of melting of ice and pumping of meltwater (typically, for deeper, compacted layers). The heat and electric power for melting, pumping, and operating all of the onboard instrumentation and electronic circuitry are supplied by radioisotope power sources (RPSs) and thermoelectric converters energized by the RPSs. The instrumentation and electronic circuitry includes miniature guidance and control sensors and an advanced autonomous control system that has fault-management capabilities. The CHIRPS probe is about 1 m long and 15 cm in diameter. The RPSs generate a total thermal power of 1.8 kW. Initially, as this power melts the surrounding ice, a meltwater jacket about 1 mm thick forms around the probe. The center of gravity of the probe is well forward (down), so that the probe is vertically stabilized like a pendulum. Heat is circulated to the nose by means of miniature pumps and heat pipes. The probe melts ice to advance in a step-wise manner: Heat is applied to the nose to open up a melt void, then heat is applied to the side to allow the probe to slip down into the melt void. The melt void behind the probe is allowed to re-freeze. Four quadrant heaters on the nose and another four quadrant heaters on the rear (upper) surface of the probe are individually controllable for steering: Turning on two adjacent nose heaters on the nose and two adjacent heaters on the opposite side at the rear causes melt voids to form on opposing sides, such that the probe descends at an angle from vertical. This steering capability can be used to avoid debris trapped in the ice or to maneuver closer to a trapped object of scientific interest.

Zimmerman, Wayne↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Previous papers and presentations have focused on the development of the test method using a benchtop prototype. This presentation covers the early results of C-AST aging of static and dynamic specimens.

balance of systems↗

Decision support system for outage management and automated crew dispatch

A decision support system is provided for utility operations to assist with crew dispatch and restoration activities following the occurrence of a disturbance in a multiphase power distribution network, by providing a real-time visualization of possible location(s). The system covers faults that occur on fuse-protected laterals. The system uses real-time data from intelligent electronics devices coupled with other data sources such as static feeder maps to provide a complete picture of the disturbance event, guiding the utility crew to the most probable location(s). This information is provided in real-time, reducing restoration time and avoiding more costly and laborious fault location finding practices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automation and robotics - Key to productivity

The automated and robotic systems requirements of the NASA Space Station are prompted by maintenance, repair, servicing and assembly requirements. Trend analyses, fault diagnoses, and subsystem status assessments for the Station's electrical power, guidance, navigation, control, data management and environmental control subsystems will be undertaken by cybernetic expert systems; this will reduce or eliminate on-board or ground facility activities that would otherwise be essential, enhancing system productivity. Additional capabilities may also be obtained through the incorporation of even a limited amount of artificial intelligence in the controllers of the various Space Station systems.

Cohen, A.↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying the Protectability of Power Systems for Restoration Applications

With the increasing availability of distributed energy resources, controllable switches, and advanced metering infrastructure, distribution systems are exploring opportunities for improving system reliability through fault location, isolation, and service restoration. During permanent outages, this requires islanding microgrids and/or reconfiguration of the feeders; however, it is critical to assess the protection of the islanded/reconfigured networks before transition because the rated load and fault current conditions change. This paper presents a novel “protectability” metric that quantifies the protection performance and allows the operators to compare the effectiveness of the protection between two or more possible reconfiguration and islanding approaches. We present the mathematical formulation and assumptions for the metric. Multiple configurations of the Electric Power Research Institute J1 feeder, both in grid-connected and weak-sourced islanded operation, are used to demonstrate the performance of the metric with reference to overcurrent protection. Takeaways for future studies on system planning integration are provided.

distributed energy resources↗

Impact of synchronous condensers on fault location and black start in multi-inverter isolated microgrids

Synchronous condensers have been used in power systems for decades, but they are now attracting interest as a potential means for solving certain issues associated with inverter-based resources in islanded power systems. They have been extensively studied in applications to large wind farms and weak grids, but there has been very little study of synchronous condensers in intentionally-islanded systems, and especially self-healing ones. This report documents the results of an LDRD project intended to create modeling tools for use in the study of synchronous condensers in these smaller off-grid systems, and to explore synchronous condensers in this application. The results indicate that synchronous condensers have the potential to provide many benefits, but there are also several unanswered questions and technical challenges requiring further study.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational performance risk assessment in support of a supervisory control system - 251

A supervisory control system is being developed for multiunit advanced small modular reactors to minimize human interventions during normal and abnormal operations. In the supervisory control system, control action decisions are made based on a probabilistic risk assessment that employs event trees and fault trees. Although traditional probabilistic risk assessment tools are implemented, their scope is extended to normal operations, and the application is reversed to assess the success of non-safety related systems and to enable continued operation of the plant. This extended probabilistic risk assessment approach is called operational performance risk assessment (OPRA). OPRA helps to identify available paths, combine control actions for maintaining plant conditions within operational limits, and to quantify the likelihood of success of these operational trajectories to optimize the selection of alternative actions without activating reactor protection system. In this paper, a case study of OPRA in a supervisory control system is demonstrated for the Advanced Liquid Metal Reactor (ALMR) Power Reactor Inherently Safe Module (PRISM) design, specifically the power conversion system. The scenario investigated involved a condition in which the feedwater control valve that was observed to be drifting to the closed position. Alternative plant configurations that would allow the plant to continue to operate at full or reduced power were identified using OPRA. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate the magnitude of safety margins. Successful recovery paths for the selected scenario were identified and quantified using the supervisory control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Space station electric power system requirements and design

An overview of the conceptual definition and design of the space station Electric Power System (EPS) is given. Responsibilities for the design and development of the EPS are defined. The EPS requirements are listed and discussed, including average and peak power requirements, contingency requirements, and fault tolerance. The most significant Phase B trade study results are summarized, and the design selections and rationale are given. Finally, the power management and distribution system architecture is presented.

Teren, Fred↗

Space Station electric power system requirements and design

An overview of the conceptual definition and design of the Space Station Electric Power System (EPS) is given. Responsibilities for the design and development of the EPS are defined. The EPS requirements are listed and discussed, including average and peak power requirements, contingency requirements, and fault tolerance. The most significant Phase B trade study results are summarized, and the design selections and rationale are given. Finally, the power management and distribution system architecture is presented.

Teren, Fred↗

Building Decision Trees for Characteristic Ellipsoid Method to Monitor Power System Transient Behaviors

The characteristic ellipsoid is a new method to monitor the dynamics of power systems. Decision trees (DTs) play an important role in applying the characteristic ellipsoid method to system operation and analysis. This paper presents the idea and initial results of building DTs for detecting transient dynamic events using the characteristic ellipsoid method. The objective is to determine fault types, fault locations and clearance time in the system using decision trees based on ellipsoids of system transient responses. The New England 10-machine 39-bus system is used for running dynamic simulations to generate a sufficiently large number of transient events in different system configurations. Comprehensive transient simulations considering three fault types, two fault clearance times and different fault locations were conducted in the study. Bus voltage magnitudes and monitored reactive and active power flows are recorded as the phasor measurements to calculate characteristic ellipsoids whose volume, eccentricity, center and projection of the longest axis are used as indices to build decision trees. The DT performances are tested and compared by considering different sets of PMU locations. The proposed method demonstrates that the characteristic ellipsoid method is a very efficient and promising tool to monitor power system dynamic behaviors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

BOCC Blueprint

The Pacific Northwest National Laboratory (PNNL) Facility and Operations (F&O) Division strives to manage performance, to assure long-term health and sustainability for the organization and our staff through innovation and learning. The F&O organization is committed to achieving five strategic outcomes over the next several years. The strategic outcomes are aligned with the Department of Energy (DOE) and PNNL mission and vision. One key outcome important to enabling our vision is to integrate the smartest facilities, connected to the smartest people, by the smartest systems. We call this our SMART3 Initiative. The F&O SMART3 Initiative will connect human capital with intelligent systems, resulting in a best-in-class, integrated facility-operations strategy that improves productivity and optimizes operational costs. The Building Operations Control Center (BOCC) Blueprint is a key deliverable in this effort and will define near-term and long-term objectives aligned with the SMART3 Initiative. The BOCC Blueprint provides a plan to successfully position the BOCC and assure full integration into the new Systems Engineering Laboratory (SEL). The BOCC Blueprint near-term objectives will satisfy each of the three elements of the SMART3 Initiative. 1. The facilities element will be achieved by defining the minimum set of smart sensors for deployment, establishing dashboards and metrics, and initiating a Real-Time Commissioning Program (RT-Cx). 2. The people element will be achieved as F&O and the Energy and Environment Directorate (EED) collaborate, mentor, and cross-train within F&O. The collaboration effort will provide proof of concept by testing, applying and sharing information on facility systems through smart grid, facility re-tuning & audits, and DSOM fault detection and diagnostics. The mentoring and cross-training will be realized by integrating air balance operators, power operators and FMCS specialists within the BOCC. 3. The systems element will be achieved by standardizing the Facility Management Control Systems (FMCS) and Decision Support for Operations and Maintenance (DSOM) development, specifically by implementing facility dashboards and tools. The long-term objectives are to enhance reliability, reduce cost, and demonstrate the “Living Laboratory,” as defined by the way facilities are used to advance research from theoretical to practical applications through scientific collaboration among PNNL’s research and development (R&D) staff. With the BOCC Blueprint defining the objectives to meet the SMART3 Initiative, the BOCC will become a valuable PNNL core competency, and allow for additional R&D opportunities.

99 GENERAL AND MISCELLANEOUS↗

Rotor blade imbalance fault detection for variable-speed marine current turbines via generator power signal analysis

Marine hydrokinetic (MHK) turbines extract renewable energy from oceanic environments. However, due to the harsh conditions that these turbines operate in, system performance naturally degrades over time. Thus, ensuring efficient condition-based maintenance is imperative towards guaranteeing reliable operation and reduced costs for marine hydrokinetic power. This work proposes a novel framework aimed at identifying and classifying the severity of rotor blade pitch imbalance faults experienced by marine current turbines (MCTs). In the framework, a Continuous Morlet Wavelet Transform (CMWT) is first utilized to acquire the wavelet coefficients encompassed within the 1P frequency range of the turbine's rotor shaft. From these coefficients, several statistical indices are tabulated into a six-dimensional feature space. Next, Principle Component Analysis (PCA) is employed on the resulting feature space for dimensionality reduction, and then the application of a K-Nearest Neighbor (KNN) machine learning algorithm is utilized for fault detection and severity classification. The effectiveness of the proposed framework is validated using a high-fidelity MCT numerical simulation platform, where results demonstrate that the presence of a pitch imbalance fault can be accurately detected 100% of the time and correctly classified based upon severity more than 97% of the time.

42 ENGINEERING↗

Online Monitoring Technical Basis and Analysis Framework for Emergency Diesel Generators - Interim Report for FY 2013

The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned by Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Power electronic applications for Space Station Freedom

NASA plans to orbit a permanently manned space station in the late 1990s, which requires development and assembly of a photovoltaic (PV) power source system to supply up to 75 kW of electrical power average during the orbital period. The electrical power requirements are to be met by a combination of PV source, storage, and control elements for the sun and eclipse periods. The authors discuss the application of power electronics and controls to manage the generation, storage, and distribution of power to meet the station loads, as well as the computer models used for analysis and simulation of the PV power system. The requirements for power source integrated controls to adjust storage charge power during the insolation period current limiting, breaker interrupt current values, and the electrical fault protection approach are defined. Based on these requirements, operating concepts have been defined which then become drivers for specific system and element design.

Pickrell, Roy L.↗