Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pulverization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Eliminating the Derate of Carbon Capture Retrofits (Rev. 2)

This study presents updated cost and performance information on retrofitting pulverized coal (PC) power plants with post-combustion carbon capture based on an advanced solvent process, based on NETL's Fossil Energy Baseline, Revision 4A. Cases considered include those using a fully integrated capture system, a case that provides capture system steam via a natural gas boiler, and a case that provides combined heat and power via a natural gas simple cycle system. Comparison cases include both new build and retrofit analysis at 90% and 95% carbon capture.

20 FOSSIL-FUELED POWER PLANTS↗

Cost and Performance Baseline for Fossil Energy Plants Volume 3: Low Rank Coal and Natural Gas to Electricity

This report presents an independent assessment of the cost and performance of select fossil energy power systems—pulverized coal (PC), circulating fluidized bed (CFB), and natural gas combined cycle (NGCC) plants—using a systematic, transparent technical and economic approach. This is Volume 3 of a five-volume series, which comprise the following reports: Volume 1: Bituminous Coal and Natural Gas to Electricity; Volume 2: Coal to Synthetic Natural Gas and Ammonia (Various Coal Ranks); Volume 3: Low Rank Coal and Natural Gas to Electricity; Volume 4: Bituminous Coal to Liquid Fuels; and Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. The cost and performance of fossil fuel-based generation technologies represented in this report (and the series at large) are important inputs to assessments and determinations of technology combinations to be utilized to meet the projected demands of future power markets. In addition to informing technology comparisons, the reference plant configurations found in this report provide perspective for regulators and policy makers. From a research and development perspective, this report is used to assess goals and metrics and to provide a consistent basis for comparing developing technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Techno-Economic Optimization of Advanced Energy Plants with Integrated Thermal, Mechanical, and Electro-Chemical Storage (Final Report)

The increasing use of renewable energy sources is leading to increased cycling of fossil-fueled power plants (FFPP) that are designed to operate at base-loaded conditions. Integrating energy storage facilities with the FFPPs can be helpful in reducing load-following operation of FFPPs. Decentralized deployment of energy storage facilities at the FFPP level has considerable advantages due to possibilities of smaller storage capacities, immediate benefits realized by the host power plant due to the increase in the efficiency, cleaner emission and higher plant life to name a few. Most importantly, deployment at the FFPP level can exploit the existing equipment items and facilities at the host power plant, thus reducing the CAPEX and reducing the storage capacity. However, realization of these benefits will critically depend on novel configuration/integration strategies with the least impact on the power plant operation and its configuration. Furthermore, dynamics of the entire integrated system including both the FFPP and the storage technologies must be taken into account to obtain the cost-optimal solution. With these motivations, the objective of this project was to complete a focused evaluation of decentralized deployments of energy storage facilities at the FFPP level. Promising thermal, chemical, mechanical, and electro-chemical storage technologies were evaluated with due consideration of their transient response to obtain various optimal system concepts that can minimize the levelized cost of storage. For thermal storage, cryogenic energy storage along with high temperature heat storage in molten salt as well as phase change material were evaluated. For mechanical storage, cryogenic air storage and pumped hydro storages were evaluated. For chemical storage, hydrogen storage was evaluated. For electrochemical storage, the team evaluated sodium sulfur, vanadium redox flow battery as well as Li-ion batteries. Integration of these storage technologies with the natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants was considered. Six technologies, namely molten salt, cryogenics, compressed air, pumped hydro, H2 storage and Li-ion battery storage, were downselected based on their levelized cost of storage. It was observed that the ranking of the optimal storage technology can differ based on the host power plant technology even when same demand/supply/price profile for electricity are considered. It was also observed that as the variability in power demand varies, the ranking of the optimal storage technologies vary. However, for the same demand and LMP profile, top six optimal storage technologies for NGCC vs SCPC plants did not differ much even though LCOS for the same technology and optimal size of a given storage technology did differ. Detailed techno-economic assessment of these six technologies was undertaken.

01 COAL, LIGNITE, AND PEAT↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Structured Adsorbent Architectures for Transformative Carbon Dioxide Capture Performance (Final Report)

Svante is a world leader at using solid sorbents for low-cost Carbon Dioxide (CO 2 ) capture, a technology which is recognized as critical in meeting the dual mandates of energy security/reliability and the mitigation of man-made CO 2 emissions. Svante has been developing proprietary adsorbent material compositions, forming them into structured laminates, developing and optimizing process cycles, and system design for efficient capture of CO 2 from post-combustion flue gases of thermal power plants and industrial facilities. The deployment of first-generation CO 2 capture technology has been significantly hampered by high costs and energy penalties, among other barriers. Second generation CO 2 capture technologies (including the Mark I variant of Svante’s Veloxotherm™ adsorption-based technology), utilizing single adsorbent architecture, show promise for reducing the barriers to deploying CO 2 capture plants in commercially meaningful numbers. The objective of this project was to evaluate the Recipient’s transformational (Mark-II) VeloxoTherm™ Technology via the development and bench-scale testing of an advanced structured adsorbent, including novel Bi-layer, laminated adsorbent structures and segmented beds. Svante selected, synthesized, and characterized tailored solid adsorbents for computational modeling, advanced structured adsorbent development, process simulations, and dynamic bench scale (~1-10 kg/day CO 2 captured) testing using an existing single-bed VeloxoTherm™ Station (VTS) coupled with a natural gas-fired boiler. Segmented beds used the in-house, multi-bed Process Demonstration Unit (PDU) to demonstrate key performance indicators (KPIs), such as recovery, product purity, regeneration energy, and the integrated system's productivity in lifetime analysis. Segmented beds were used at a 1 tonne per day (TPD) unit at an industrial site to provide bench-scale validation of performance in an industrial setting. Svante was developing and optimizing the post-combustion CO 2 adsorption technology architectures, including the Bi-layer and segmented laminated adsorbent structure design, integrated rapid cycle temperature swing adsorption (RC-TSA) cycle, flow path architecture, and adsorbent bed construction and packaging (including gas porting) to progress towards achievement of DOE’s Transformational CO 2 Capture goals of 95% CO 2 purity and a cost of electricity at least 30% lower than a supercritical Pulverized Coal (PC) power plant with CO 2 capture, or approximately $30 per tonne of CO 2 captured ready for demonstration by 2030. The main requirements to reach the DOE target cost of carbon capture below $30/MT using Rapid-Cycling Temperature Swing Adsorption (RC-TSA) are as follows: (1) Increased capacity at different CO 2 concentrations, (2) Increased sorbents cycle life, (3) Increased O 2 resistance, and (4) Decreased steam requirement to extract 1 kg of CO 2 .

20 FOSSIL-FUELED POWER PLANTS↗

Differences In High Burnup Fuel Management Strategies to Minimize FFRD and Increase Economic Viability

The nuclear industry is pursuing approval of an increase in the length of the pressurized water reactor (PWR) cycle from 18 months to 24 months to reduce reactor downtime and enhance the economic competitiveness of nuclear energy. Such an increase in reactor cycle length will require that the maximum rod average burnup exceeds the current regulatory limit of 62 GWd/MTU, and it could peak at approximately 75 GWd/MTU, posing potential reactor safety and performance concerns. One such concern is that fuel fragmentation, relocation, and dispersal (FFRD) could occur during a severe loss-of coolant accident (LOCA) in which a fuel rod balloons and bursts, and pulverized fuel fragments are dispersed throughout the reactor’s primary coolant system. Previous analyses have identified which reactor operating conditions leave the core more susceptible to FFRD and have shown that FFRD susceptibility is strongly linked to fuel rod burnup and linear heat rate (LHR) history. The work described in this report uses an optimization strategy known as parallel simulated annealing (PSA) and a coarse mesh Purdue Advanced Reactor Core Simulator (PARCS) reactor physics model to develop two core fuel loading patterns, each with a different optimization objective. One core optimization maximized the core’s cycle length while still respecting regulatory limits on the radial peaking factor and soluble boron concentration with a peak rod average burnup of 75 GWd/MTU. The second optimization was aimed at minimizing FFRD susceptibility while still targeting a 24-month cycle length and respecting regulatory limits. PARCS model predictions were verified using the high-fidelity Virtual Environment for Reactor Applications (VERA). The two core designs were compared to highlight core design strategies to minimize FFRD susceptibility and to maximize economic viability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Compare predictions of transient fission gas release by empirical and mechanistic models to experiments in high burnup UO 2 fuel

Understanding and predicting fuel performance at high burnup require improving our understanding of transient fission gas release. High-burnup operations enable new mechanisms of fission gas release, which affect fuel performance. The Nuclear Regulatory Commission has recently published its interpretation of existing fuel fragmentation, relocation, and dispersal data in a research information letter. There, transient fission gas release was identified as one of the main factors that contributes to fuel fragmentation, relocation, and dispersal, and therefore limits fuel extension to high burnup. However, transient fission gas release is a complex phenomenon that cannot be fully described by simple empirical descriptions. This report summarizes the development of a mechanistic model for high-burnup transient fission gas release in the fuel performance code BISON. This research was supported by the Nuclear Energy Advanced Modeling and Simulation program during fiscal year 2023 to improve our understanding of high-burnup transient fission gas release and ability to predict it as a function of operation history. To support the development of a mechanistic transient fission gas release model, the existing Simple Integrated Fission Gas Release and Swelling (Sifgrs) model in BISON has been completely refactored to make it more modular and extensible. This effort supports the model's application to high-burnup conditions, its extension to other fuel forms, and the continuous improvement of its current features. Once refactoring was completed, models for high-burnup structure formation, fission gas transfer from non-restructured fuel to high-burnup structure, high-burnup structure intragranular and intergranular fission gas behavior, high-burnup structure bubble evolution, fuel pulverization, and the resulting transient fission gas release were tested and implemented in the Simple Integrated Fission Gas Release and Swelling (Sifgrs) model or tightly coupled to it. The new mechanistic model was then compared to an empirical model developed in parallel by a Nuclear Energy University Program project using a Studsvik high-burnup loss-of-coolant-accident assessment case. Finally, the report details the preliminary BISON results for a benchmark activity organized by the Nuclear Energy Agency to evaluate fuel performance codes' predictive capabilities for burst fission gas release. This work represents an important step toward a mechanistic understanding of fission gas release in high-burnup conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Trace Element Sampling and Partitioning Modeling to Estimate Wastewater Composition and Treatment Performance at Coal Generators

The coal combusted at coal-fired power plants (CFPPs) contains several trace elements that impact human heath if released to the environment. Effective combinations of air pollution control devices (APCDs) and water pollution control devices (WPCDs) are critical to reducing these impacts. This work sampled pulverized CFPPs owned and operated by Louisville Gas & Electricity – Kentucky Utilities (LGE-KU) during baseload and cycling conditions. Next, an open-source and easy-to-implement trace element partitioning model was developed using publicly available datasets, literature studies of trace element partitioning, and sampling data to estimate trace element partitioning in APCDs to the gas, liquid, and solid phases exiting CFPPs. These estimates of the liquid phase trace element concentration in FGD wastewater were then used to estimate trace element behavior in WPCDs and evaluate treated wastewater effluent concentrations for compliance with the Effluent Limitation Guidelines (ELG) for the Steam Electric Generating Sector. Finally, cost estimates were developed for established and emerging wastewater treatment trains to identify the most cost-effective approaches for ELG compliance.

01 COAL, LIGNITE, AND PEAT↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗