Search NASA⌕ Search

SEARCH · Search NASA

Results for “RF acceleration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Coherent high-power RF wakefield generation by electron bunch trains in a metamaterial structure

In this paper, we present an experimental study of coherent high-power wakefield generation in a metamaterial (MTM) structure at 11.7 GHz by 65 MeV electron bunch trains at the Argonne Wakefield Accelerator (AWA), following a previous experiment, the Stage-I experiment, at the AWA. Both the Stage-II experiment, reported in this paper, and the Stage-I experiment were conducted using MTM structures, which are all-metal periodic structures with the period being much smaller than the wavelength. Differences between the two experiments include (1) structure length (Stage-I 8 cm and Stage-II 20 cm); (2) number of bunches used to excite the structure (Stage-I with two bunches, up to 85 nC of total charge; Stage-II with eight bunches, up to 224 nC of total charge); and (3) highest peak power measured (Stage-I 80 MW in a 2 ns pulse and Stage-II 380 MW in a 10 ns pulse). High-power radio frequency pulses were generated by reversed Cherenkov radiation of the electron beam due to the negative group velocity in the MTM structures. Because the radiation is coherent, a train of bunches with a proper spacing can build up to achieve a high peak power. The observed output power levels are very promising for future applications in direct collinear wakefield acceleration or in transfer to a second accelerator for two-beam acceleration.

36 MATERIALS SCIENCE↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗

Statistical Properties of Undulator Radiation

Two experiments were carried out to study the statistical properties of undulator radiation in the Integrable Optics Test Accelerator (IOTA) storage ring at Fermilab. The first experiment studied the turn-to-turn fluctuations in the power of the radiation generated by an electron bunch. The magnitude of these fluctuations depends on the 6D phase-space distribution of the electron bunch. In IOTA, we demonstrated that this effect can be used to measure some electron bunch parameters, small transverse emittances in particular. In the second experiment, a single electron was stored in the ring, emitting a photon only once per several hundred turns. In this regime, any classical interference-related collective effects were eliminated, and the quantum fluctuations could be studied in detail to search for possible deviations from the expected Poissonian photon statistics. In addition, the photocount arrival times were used to track the longitudinal motion of a single electron and to compare it with simulations. This allowed us to determine several dynamical parameters of the storage ring such as the rf cavity phase jitter and the dependence of the synchrotron motion period on amplitude.

43 PARTICLE ACCELERATORS↗

Magnetic field sensors for detection of trapped flux in superconducting radio frequency cavities

Superconducting radio-frequency (SRF) cavities are fundamental building block of modern particle accelerators. They operate at liquid helium temperatures 2-4 K to achieve very high quality factors 1e10-1e11. Trapping of magnetic flux within the superconductor is a significant contribution to the residual RF losses which limit the achievable quality factor. Suitable diagnostic tools are in high demand to understand the mechanisms of flux trapping in technical superconductors and the fundamental components of such diagnostic tool are magnetic field sensors. We have studied the performance of commercially available Hall probes, anisotropic magnetoresistive sensors and flux-gate magnetometers with respect to their sensitivity and capability to detect localized, low magnetic flux amplitudes, of the order of few tens of magnetic flux quantum at liquid helium temperature. Although Hall probes have the lowest magnetic field sensitivity (~96$ nV$/microT at 2 K), their physical dimensions are such that they have the ability to detect the lowest number of trapped vortices among the three type of sensors. Hall probes and anisotropic magnetoresistive sensors have been selected to be used in a setup to map regions of trapped flux on the surface of a single-cell SRF cavity.

47 OTHER INSTRUMENTATION↗

Acceleration of uranium beam to record power of 10.4 kW and observation of new isotopes at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) is a major nuclear physics facility for research with fast, stopped, and reaccelerated beams that was successfully commissioned in May 2022. A key capability of FRIB is the production of an acceleration of the uranium beam, but this capability requires the facility to work at the design limits of the lowest charge-to-mass ratio and the highest power density on the beam intercepting devices. This paper presents techniques for overcoming the significant challenges in accelerating the uranium beam, culminating in the demonstration of 10.4 kW on target, and the discovery of three new isotopes. The high-power uranium beam enabled us to produce and identify G 88 a , A 93 s , and S 96 e , within the first 24 h of operation. The successful uranium operation at FRIB sets a new record for accelerated uranium beam power above 10 kW and opens a new avenue of research with rare isotopes. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

One-to-one mapping between the electromagnetic modes of cylindrical and coaxial half-wave cavities

Design of radio frequency (RF) couplers and diagnostics require a good understanding of the electromagnetic mode patterns of RF cavities. This study investigates the adiabatic transformation of transverse magnetic (TM) modes in a cylindrical cavity into transverse electromagnetic (TEM) modes of a coaxial cavity by gradually introducing an inner conductor. Using CST Studio Suite, we simulate the eigenmode evolution as the geometry transforms from a pure cylindrical to a coaxial configuration. We track the behavior of TM010 through TM014 modes to observe the continuous evolution into the corresponding TEM0 through TEM4 modes of the coaxial cavity. The process is governed by the evolution of the electric field orientation as the geometry shifts, enabling the axial TM fields to reorient into the radial electric field configuration of TEM modes. Field patterns, eigen-frequencies, and mode indentities are analyzed throughtout the transition. The results provide simulation-based evidence that TM to TEM conversion occurs without generation of newer eigenmodes, offering a valuable insight into the design of transition regions in superconducting RF (SRF) systems and provides a foundation for experimental validation.

Accelerator Physics↗

EIC Transverse emittance growth due to crab cavity RF noise: Estimates and mitigation

The Electron-Ion Collider (EIC) requires crab cavities to compensate for a 25 mrad crossing angle and achieve maximum luminosity. The crab cavity Radio Frequency (RF) system will inject low levels of noise to the crabbing field, generating transverse emittance growth and potentially limiting luminosity lifetime. In this work, we estimate the transverse emittance growth rate as a function of the Crab Cavity RF noise and quantify RF noise specifications for reasonable performance. Finally, we evaluate the possible mitigation of the RF noise induced emittance growth via a dedicated feedback system.

43 PARTICLE ACCELERATORS↗

Modeling alignment of electron trajectory in cooling section of EIC Low Energy Cooler

The Electron Ion Collider (EIC) requires cooling of protons at the injection energy to obtain emittances needed to achieve the design luminosity. The low energy cooler (LEC) provides such a capability. The LEC is an electron cooler utilizing a non-magnetized, RF-based electron cooling. This approach to cooling was successfully used in Low Energy RHIC Electron Cooler (LEReC).

43 PARTICLE ACCELERATORS↗

Charge per Micro-Pulse Calculation for Ideal Lujan and WNR beams

A complete redesign of the LANSCE front-end is currently under development for the Los Alamos Modernization Project (LAMP). This includes the replacement of the traditional Cockroft-Walton injection system to the newer radiofrequency quadrupole (RFQ) standard. LANSCE accelerates both H- and H+ beams and therefore requires an unconventional application for RFQ systems. A new facility could consider using an independent RFQ for each beam species. However, with the tight space of the LANSCE injector facility, it would prove difficult to instrument. Our initial studies have shown that a single RFQ could be used. The negatively- and positively-charged direct current (DC) beams are shaped, bunched, and accelerated out of phase to each other, with very little interaction. This would work for all possible H+ beam gates and most H- Beam gates. However, a challenge arises with the Weapons Neutron Research (WNR) beam structure that requires the acceleration of bunched beams at higher charge density per pulse. The Long Bunch Enable Gate (LBEG) used for the Lujan center is the best example of a standard injector beam gate. The beam gate, or Macro-Pulse (MP), is 625-us long, separated by at least 8.3 ms. A chopper is used to dice the MP into 1750 mini-Pulses (mP), which are 290-ns wide. After chopping, the MP contains 100,000 micro-Pulses (uP), which are generated by the linac acceleration structure modulated at 201.25 MHz; that is, the micro-Pulses are separated 5 ns apart from each other. The H+ beam structure will be very similar once a chopper is added to its transport. However, the Multi-Pulse Enable Gate (MPEG) used for WNR is significantly different in structure. In this case, the mP is chopped to be only 35-ns wide. This width is then rotated into a single 201.25 MHz RF bucket using the Low Frequency Buncher (LFB). This is proving difficult for the RFQ design in the LAMP upgrade. We began investigating the amount of current sent to WNR for two reasons. Firstly, we wanted to find a solution to avoid using the Low Frequency Buncher to simplify the LAMP RFQ design. It is simple to inject and accelerate a 35 mA DC beam in the LAMP RFQ (this is done in numerous accelerator facilities). However, injecting a short bunch with a larger current (once compressed to 5 ns to meet the RFQ frequency) may be difficult. Second, we have a technique called PSR2WNR in which we do not employ the Low Frequency Buncher, but rather accumulate 5 LBEG uP (5 ns) in the PSR and deliver the accumulated beam to WNR every 1.8 us. As a result, we could provide to WNR with five accumulated LBEG uPs every shot. The goal here is to create a rapid kicker with a frequency response of 555 kHz. DARHT-II and other accelerator facilities have constructed kickers of this type for other uses, and our engineers consider this technology as feasible.

43 PARTICLE ACCELERATORS↗

LAMP DTL Scoping Studies (Technical Report)

The present studies are based on the preliminary design efforts, and on the Scoping Studies of the “Strawman” design of LAMP front-end upgrade, referred in the text below to as “Feb.2024 Iteration”, presented in. The main accomplishment of present studies was substantial increase of the fidelity of the beam dynamics simulations in the proposed drift tube linac (DTL). The main accent was on development of the methodology for calculation of the longitudinal (synchrotron) and transverse (betatron) oscillations frequencies (phase advance per focusing period) values and providing the accelerating structure focusing lattice that has safe parameters of such oscillations to avoid unwanted emittance growth and possible beam halo formation. The resulting values of the oscillations phase advances are presented in Table 1, and in Figure 5 in the main body of the report. Special efforts were made to achieve the RF power consumption within limits of the existing RF power system and make sure that DTL fits in the existing tunnel. The LAMP scope does not suggest any additional building and/or tunnel construction. Table 1 summarizes some of these results, as well as Table 3 in the main body of the report.

43 PARTICLE ACCELERATORS↗

Performance of a liquid Ga target for Laser Ion Source

We experimentally proved the feasibility of a liquid-based target for Laser Ion Source (LIS) application. The target consists of melted metal gallium contained in a heated crucible. Ions current resulting from laser irradiation. Moreover, given the explosive ablation mechanism involved, each laser shot has been found to induce fluctuations in the surface level. It takes about 0.7 sec to recover the steady condition fully. Despite the maximum fluctuation being 2.7 mm (top-bottom maximum displacement), these fluctuations have shown no significant influence on total ion current and are independent of the temperature of the sample within the tested repetition rate. This study provides valuable insights into the potential of employing such a system for LIS.

43 PARTICLE ACCELERATORS↗

Machine protection system for coherent electron cooling experiment

The coherent electron cooling (CeC) experiment employs a 15 MeV electron beam with up to a few milliamperes current which is capable of destroying the vacuum equipment or intercepting beam diagnostics. The high-current beam can be delivered to two different dumps. RF systems include normal conducting and superconducting cavities which also require protection from abnormal conditions. In this paper, we describe in detail the design and operation of the machine protection system for the CeC accelerator.

43 PARTICLE ACCELERATORS↗

Retention of Sputtered Molybdenum on Ion Engine Discharge Chamber Surfaces

Grit-blasted anode surfaces are commonly used in ion engines to ensure adherence of sputtered coatings. Next generation ion engines will require higher power levels, longer operating times, and thus there will likely be thicker sputtered coatings on their anode surfaces than observed to date on 2.3 kW-class xenon ion engines. The thickness of coatings on the anode of a 10 kW, 40-centimeter diameter thruster, for example, may be 22 micrometers or more after extended operation. Grit-blasted wire mesh, titanium, and aluminum coupons were coated with molybdenum at accelerated rates to establish coating stability after the deposition process and after thermal cycling tests. These accelerated deposition rates are roughly three orders of magnitude more rapid than the rates at which the screen grid is sputtered in a 2.3 kW-class, 30-centimeter diameter ion engine. Using both RF and DC sputtering processes, the molybdenum coating thicknesses ranged from 8 to 130 micrometers, and deposition rates from 1.8 micrometers per hour to 5.1 micrometers per hour. In all cases, the molybdenum coatings were stable after the deposition process, and there was no evidence of spalling of the coatings after 20 cycles from about -60 to +320 C. The stable, 130 micrometer molybdenum coating on wire mesh is 26 times thicker than the thickest coating found on the anode of a 2.3 kW, xenon ion engine that was tested for 8200 hr. Additionally, this coating on wire mesh coupon is estimated to be a factor of greater than 4 thicker than one would expect to obtain on the anode of the next generation ion engine which may have xenon throughputs as high as 550 kg.

Sovey, James S.↗

SNS Warm Linac Circulator Breakdown Considerations for the PPU Project

Multipacting in accelerating structures is a complex phenomenon about which there is much to be understood. While multipacting research efforts have primarily been focused on superconducting radio frequency (SRF) systems, normal conducting accelerating structures which have a higher thermal capacity, and a greater vacuum pressure tolerance could benefit from additional investigation. This research details multipacting simulation methods and the results of 3-D electromagnetic simulations of RF vacuum windows used on normal conducting linac (NCL) cavities. Benchmarking of the peak electric fields in these structures, benefits of material processing and possible techniques for reducing or eliminating multipacting activities are discussed.

Toby, George↗

Fluid dynamic simulation and analysis of water-cooling systems for the Electron-Ion Collider

The Electron-Ion Collider is the newest large-scale project at Brookhaven National Laboratory. The collider’s purpose is to provide further advancements in the knowledge of the universe’s origin by accelerating particles near the speed of light. Our project for this 3.8 km ring was to create a thermal hydraulic steady-state simulation design of the water-cooling system to be cost-effective and energy efficient, as envisioned by Charlie Foltz, the EIC Infrastructure Division Director. The system would include a supply and return header, which cools several thousand components of the ring. The water would then be returned and cooled down using a system of cooling towers and plate and frame heat exchangers. Due to the size of the system and the complexity of the network analysis, a fluid dynamic simulation software, AFT Fathom, was used. Since previous methods of maintaining systems relied on building upon smaller real-life models and implementing empirical data, this flow model was unique and first of a kind in the domain of accelerator design, construction and operation. Therefore, our hydraulic team piloted a new method to perform network analysis on a large scale cooling system. We successfully created several test scenarios for system behavior in a shorter time compared to the method of performing hand calculations. Cooling specifications for heat rejection, pressure drop, flow rate, and pipe sizing were changed based on the individual systems of the vacuum, radio frequency (RF), magnet and power supply, and cryogenics sections. Finally, we used DOE guidelines to perform life-cycle cost analysis with net present value and carbon saving analysis on the systems where pipe size could be optimized.

43 PARTICLE ACCELERATORS↗