Search NASA⌕ Search

SEARCH · Search NASA

Results for “SCIENCES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Hampshire College Center for Science Education. Final Report on Activities Supported by the Department of Energy Grant No. DE-FG02-06ER64256

Hampshire College's Center for Science Education (Center) focuses on teacher professional development, curriculum development, and student enrichment programs. The Center also maintains research programs on teacher change, student learning and instructional effectiveness. The Center's work promotes learning that persists over time and transfers to new situations in and out of school. The projects develop the implications of the increasing agreement among teachers and researchers that effective learning involves active concept mastery and consistent practice with inquiry and critical thinking. The Center's objective is to help strengthen the pipeline of U.S. students pursuing postsecondary study in STEM fields. The Center achieves this by fostering an educational environment in which science is taught as an active, directly experienced endeavor across the K-16 continuum. Too often, young people are dissuaded from pursuing science because they do not see its relevance, instead experiencing it as dry, rote, technical. In contrast, when science is taught as a hands-on, inquiry-driven process, students are encouraged to ask questions grounded in their own curiosity and seek experimental solutions accordingly. In this way, they quickly discover both the profound relevance of science to their daily lives and its accessibility to them. Essentially, they learn to think and act like real scientists. The Center’s approach is multi-faceted: it includes direct inquiry-based science instruction to secondary and postsecondary students, educating the next generation of teachers, and providing new educational opportunities for teachers already working in the schools. Funding from the Department of Energy focused on the last population, enabling in-service teachers to explore and experience the pedagogy of inquiry-based science for themselves, and to take it back to their classrooms and students. The Center has demonstrated that the inquiry-based approach to science learning is compatible with existing state curriculum frameworks and produces students who understand and are positively inclined toward science. Funds from this Department of Energy grant supported three projects that involved K-16 science outreach: 1. Teaching Issues and Experiments in Ecology (TIEE). TIEE a peer-reviewed online journal and curriculum resource for postsecondary science teachers. 2. The Collaboration for Excellence in Science Education (CESE). CESE is a partnership with the Amherst, Massachusetts school system to foster the professional development of science teachers, and to perform research on student learning in the sciences and on teacher change. The project draws on Hampshire's long experience with inquiry-oriented and interdisciplinary education, as well as on its unique strengths in cognitive science. The project is run as design research, working with teachers to improve their practices and studying student and/or teacher outcomes. 3. Day in the Lab. Grant funds partially supported the expansion of the ongoing science outreach activities of the School of Natural Science. These activities are focused on local districts with large minority enrollments, including the Amherst, Holyoke and Springfield Public School Districts, and the Pioneer Valley Performing Arts Charter School (PVPA). Each of the three projects supported by the grant met or exceeded its goals. In part, the successes we met were due to continuity and communication among the staff of the programs. At the beginning of the CESE project, a science outreach coordinator was recruited. He worked throughout the grant period along with a senior researcher and the project's curriculum director. Additionally, the director and an undergraduate student conducted research on teacher change. The science outreach coordinator acted as a liaison among Hampshire College, the school districts, and a number of local businesses and agencies, providing organizational support, discussion facilitation, classroom support for teachers, and materials purchase. His presence in the schools kept teachers engaged and supported. He also brought the PVPA Charter School into the project. He worked closely with the educational outreach coordinator at Hampshire who oversaw the Day in the Lab program. Together, they have ensured the continuity of support to the schools through the use and placement of student interns. Finally, the director and coordinators worked with the Hitchock Center for the Environment to bring the two science professional development efforts in Amherst together. The joint development of workshops for elementary teachers was extremely successful. A major reason for the successes of the CESE program was the strength of the teacher outreach team and the sheer number of hours spent building relationships, talking about teaching and learning, planning projects, developing curriculum, and working with experts throughout the Pioneer Valley.

99 GENERAL AND MISCELLANEOUS↗

Audit Report on "The Office of Science's Management of Information Technology Resources"

The Department of Energy's Office of Science (Science) and its facility contractors are aggressive users of information technology (IT) to support fundamental research in areas such as energy, environmental remediation and computational sciences. Of its $4 billion Fiscal Year 2008 budget, Science spent about $287 million to manage its IT program. This included cyber security activities, acquisition of hardware and software, and support service costs used to maintain the operating environments necessary to support the missions of the program. Prior Office of Inspector General reports have identified various issues with Science's management of its IT programs and resources. For instance, our report on Facility Contractor Acquisition and Management of Information Technology Hardware (DOE/IG-0768, June 2007) noted that the Science sites reviewed spent more than necessary when acquiring IT hardware. In another example, our review of The Department's Efforts to Implement Common Information Technology Services at Headquarters (DOE/IG-0763, March 2007) disclosed that Science's reluctance to adopt the Department of Energy Common Operating Environment (DOE-COE) at Headquarters contributed to the Department's inability to fully realize potential cost savings through consolidation and economies of scale. In light of the magnitude of the Office of Science IT program and previously identified program weaknesses, we initiated this audit to determine whether Science adequately managed its IT resources. Science had taken a number of actions to improve its cyber security posture and align its program to Federal requirements. Yet, our review disclosed that it had not taken some basic steps to enhance security and reduce costs. In particular, we found that: (1) For their non-scientific computing environments, all seven of the field sites reviewed (two Federal, five contractor) had implemented security configurations that were less stringent than those included in the Federal Desktop Core Configuration. This configuration was designed by the National Institute of Standards and Technology and its use was mandated by the Office of Management and Budget; (2) Although we previously highlighted weaknesses and recommended corrective actions, Science still had not fully established or enforced IT hardware standards for acquiring hardware such as desktop and laptop computers or related peripherals, contributing to significant unnecessary expenditures; and (3) While we have noted in a series of past reports that significant savings could be realized from aggregating demand for IT services and products across the enterprise, Science had not implemented a common infrastructure for users at its Federal sites and continued to maintain an IT environment independent of the Department's Common IT Operating Environment. The weaknesses identified were attributable, at least in part, to a lack of adequate policies and procedures for ensuring effective cyber security and hardware acquisition practices. In addition, Science had not effectively monitored the performance of its field sites to ensure that previously reported internal control weaknesses were addressed and had not implemented an appropriate mechanism to track its IT-related costs. Without improvements, Science may be unable to realize the benefits of improved security over its information systems, reduce costs associated with hardware acquisition, and lower IT support costs through consolidation of services. In particular, we determined that Science could potentially realize savings of more than $3.3 million over the next three years by better controlling hardware costs and implementing standards for certain equipment. Furthermore, Science could continue to pay for duplicative IT support services and fail to take advantage of opportunities to lower costs and apply potential savings to mission-related work. During the course of our audit work, we learned from Science officials that they had initiated the process of revising the Program Cyber Security Plan to better clarify its policy for implementing Federal cyber security requirements. In addition, we noted that the Oak Ridge National Laboratory had taken action to establish and enforce hardware standards on both its administrative and scientific workforce. Although these actions are positive steps, additional action is needed to strengthen Science's IT program. To that end, our report contains several recommendations that, if fully implemented, should help Science improve the management of its IT resources.

99 GENERAL AND MISCELLANEOUS↗

NASA's Earth Science Flight Program Meets the Challenges of Today and Tomorrow

NASA's Earth science flight program is a dynamic undertaking that consists of a large fleet of operating satellites, an array of satellite and instrument projects in various stages of development, a robust airborne science program, and a massive data archiving and distribution system. Each element of the flight program is complex and present unique challenges. NASA builds upon its successes and learns from its setbacks to manage this evolving portfolio to meet NASA's Earth science objectives. NASA fleet of 16 operating missions provide a wide range of scientific measurements made from dedicated Earth science satellites and from instruments mounted to the International Space Station. For operational missions, the program must address issues such as an aging satellites operating well beyond their prime mission, constellation flying, and collision avoidance with other spacecraft and orbital debris. Projects in development are divided into two broad categories: systematic missions and pathfinders. The Earth Systematic Missions (ESM) include a broad range of multi-disciplinary Earth-observing research satellite missions aimed at understanding the Earth system and its response to natural and human-induced forces and changes. Understanding these forces will help determine how to predict future changes, and how to mitigate or adapt to these changes. The Earth System Science Pathfinder (ESSP) program provides frequent, regular, competitively selected Earth science research opportunities that accommodate new and emerging scientific priorities and measurement capabilities. This results in a series of relatively low-cost, small-sized investigations and missions. Principal investigators whose scientific objectives support a variety of studies lead these missions, including studies of the atmosphere, oceans, land surface, polar ice regions, or solid Earth. This portfolio of missions and investigations provides opportunity for investment in innovative Earth science that enhances NASA's capability for better understanding the current state of the Earth system. ESM and ESSP projects often involve partnerships with other US agencies and/or international organizations. This adds to the complexity of mission development, but allows for a greater scientific return on NASA's investments. The Earth Science Airborne Science Program provides manned and unmanned aircraft systems that further science and advance the use of satellite data. NASA uses these assets worldwide in campaigns to investigate extreme weather events, observe Earth system processes, obtain data for Earth science modeling activities, and calibrate instruments flying aboard Earth science spacecraft. The Airborne Science Program has six dedicated aircraft and access to many other platforms. The Earth Science Multi-Mission Operations program acquires, preserves, and distributes observational data from operating spacecraft to support Earth Science research focus areas. The Earth Observing System Data and Information System (EOSDIS), which has been in operations since 1994, primarily accomplishes this. EOSDIS acquires, processes, archives, and distributes Earth Science data and information products. The archiving of NASA Earth Science information happens at eight Distributed Active Archive Centers (DAACs) and four disciplinary data centers located across the United States. The DAACs specialize by topic area, and make their data available to researchers around the world. The DAACs currently house over 9 petabytes of data, growing at a rate of 6.4 terabytes per day. NASA's current Earth Science portfolio is responsive to the National Research Council (NRC) 2007 Earth Science Decadal Survey and well as the 2010 NASA Response to President Obama's Climate Plan. As the program evolves into the future it will leverage the lessons learned from the current missions in operations and development, and plan for adjustments to future objectives in response to the anticipated 2017 NRC Decadal Survey.

Flight Program↗

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team (A-Team). The A-Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an ATeam study. In these studies, Concept Maturity Levels (CML) are used to group methods. These levels include idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for exploring the science objectives, feasibility, and scope will be described including use of a new technique for understanding the most compelling science, called a Science Return Diagram (SRD). In the process of developing the SRD, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid towards developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions and reveal the mission concept’s most compelling science. This paper will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.In June of 2011 a new collaborative engineering approach forearly concept formulation began in the JPL InnovationFoundry [1], six months later becoming the “A-Team” [2].Responding to a need for exploring mission architecturelevel trades [3], the A-Team precedes Team X [4,5] in asequence of concurrent engineering teams at JPL that can beused to mature a concept from a “cocktail napkin” level ideato a complete mission point design. The A-Team efficientlyexplores the science, implementation, and programmatictrade space in early concept formulation. Small, facilitatedgroups of experts generate innovative ideas, quantitativelyassess feasibility, and discover key sensitivities in the tradespace through collaborative analysis and use of advancedmethods and tools. The A-Team process builds off theexperience within JPL and other recent approaches to earlyconcept formulation [6] including best practices of the JPLInnovation Foundry, Project Systems Engineering &Formulation Section, Team Eureka and the Rapid MissionArchitecture Team[7].The A-Team is a focal point for innovative formulationapproaches and people within JPL. It relies on a largebackground of study resources, creative thinkers and “greybeard” scrutinizers, advanced tools, and subject matterexperts with both breadth and depth in experience andexpertise that are all available at JPL. The A-Team isdesigned to be a rapid and efficient process takingapproximately 6 weeks (the entire process can be as short asjust a few days or as long as up to three months) and costingthe equivalent of a work-month of a full-time employee orless. Studies begin with detailed planning and client reviewfollowed by study sessions, analysis work, and reporting.The staffing on each study is customized to the study goalsand objectives, and it is addressed early in the A-Teamprocess. Sessions are generally half-day or whole-day eventsand conducted over a series of days with focused agendas thatare moderated by a trained facilitator. Preliminary results andknowledge capture are available within hours of each session,and a final report is generally available two weeks later.One of the biggest challenges facing early conceptdevelopment is understanding the gradient in science returnversus various available mission scenarios and payload options. Often times, major areas of scientific inquiry havealready been prioritized by science groups, including throughthe National Research Council’s Decadal Studies inAstronomy, Planetary, and Earth Science. Yet science teamscontinue to struggle, especially in competitive missionsolicitations, to capture the right amount of scope that’sachievable within the cost constraints of the opportunity.Often the desire to completely and comprehensively study ascience area in just one mission (after all, true missionopportunities are rare) drives teams to take on too much,providing requirements that are unachievable within theresources of the opportunity without inducing unacceptableimplementation risk. Alternatively, science teams can seekto reduce risk by using an established instrument, but havenot thought through the traceability and key aspects of thescience question to justify its use. Both scenarios lead to badassumptions at the beginning of the concept development thatcan then ripple through implementation option choices,potentially preventing what would have been a good scienceinvestigation from being selected.The purpose of this paper is first to provide some additionalbackground and summary of the A-Team process, tools,people, and facilities. We then focus on the A-Teammethodology for overcoming the barriers of defining thescience scope well at the early concept development stage.This includes understanding the science story andtraceability, and then examining the gradient in science returnversus key characteristics of observables, developing theright payload and mission requirement specification throughexamining the science and implementation trade space.

Ziemer, John K.↗

Summary of the Science Performed Onboard the International Space Station within the United States Orbital Segment during Increments 16 and 17

With the launch of the STS-122 on February 7, 2008, which delivered the European Columbus science module and the upcoming STS-124 flight, which will deliver the Japanese Kibo science module in May 2008, the International Space Station will become truly International with Europe and Japan joining the United States of America and Russia to perform science on a continuous basis in a wide spectrum of science disciplines. The last science module, Kibo, of the United States Orbital Segment (USOS) will be mated to the station on time to celebrate its first decade in low Earth orbit in October 2008 (end of Increment 17), thus ushering in the second decade of the station with all the USOS science modules mated and performing science. The arrival of the Kibo science module will also mark continuous human presence on the station for eighty eight (88) months, and, with the addition of the ESA science module during the STS-122 flight, the USOS will be made up of four space agencies: CSA, ESA, JAXA and NASA, spanning three continents. With the additional partners coming onboard with different research needs, every effort is being made to coordinate science across the USOS segment in an integrated manner for the benefit of all parties. One of the objectives of this paper is to discuss the integrated manner in which science planning/replanning and prioritization during the execution phase of an increment is being done. The main focus, though, of this paper is to summarize and to discuss the science performed during Increments 16 and 17 (October 2007 to October 2008). The discussion will focus mainly on the primary objectives of each investigation and their associated hypotheses that were investigated during these two Increments. Also, preliminary science results will be discussed for each of the investigation as science results availability permit. Additionally, the paper will briefly touch on what the science complement for these two increments was and what was actually accomplished due to real time science implementation and constraints. Finally, the paper will briefly discuss the science research complements for the next three Increments: Increments 18 to 20, in order to preview how much science might be accomplished during these three upcoming Increments of the station next decade.

Jules, Kenol↗

Planetary Balloon-Based Science Platform Evaluation and Program Implementation

This report describes a study evaluating the potential for a balloon-based optical telescope as a planetary science asset to achieve decadal class science. The study considered potential science achievable and science traceability relative to the most recent planetary science decadal survey, potential platform features, and demonstration flights in the evaluation process. Science Potential and Benefits: This study confirms the cost the-benefit value for planetary science purposes. Forty-four (44) important questions of the decadal survey are at least partially addressable through balloon based capabilities. Planetary science through balloon observations can provide significant science through observations in the 300 nm to 5 m range and at longer wavelengths as well. Additionally, balloon missions have demonstrated the ability to progress from concept to observation to publication much faster than a space mission increasing the speed of science return. Planetary science from a balloon-borne platform is a relatively low-cost approach to new science measurements. This is particularly relevant within a cost-constrained planetary science budget. Repeated flights further reduce the cost of the per unit science data. Such flights offer observing time at a very competitive cost. Another advantage for planetary scientists is that a dedicated asset could provide significant new viewing opportunities not possible from the ground and allow unprecedented access to observations that cannot be realized with the time allocation pressures faced by current observing assets. In addition, flight systems that have a relatively short life cycle and where hardware is generally recovered, are excellent opportunities to train early career scientists, engineers, and project managers. The fact that balloon-borne payloads, unlike space missions, are generally recovered offers an excellent tool to test and mature instruments and other space craft systems. Desired Gondola Features: Potential gondola characteristics are assessed in this study and a concept is recommended, the Gondola for High-Altitude Planetary Science (GHAPS). This first generation platform is designed around a 1 m or larger aperture, narrow-field telescope with pointing accuracies better than one arc-second. A classical Cassegrain, or variant like Ritchey-Chretien, telescope is recommended for the primary telescope. The gondola should be designed for multiple flights so it must be robust and readily processed at recovery. It must be light-weighted to the extent possible to allow for long-duration flights on super-pressure balloons. Demonstration Flights: Recent demonstration flights achieved several significant accomplishments that can feed forward to a GHAPS gondola project. Science results included the first ever Earth-based measurements for CO2 in a comet, first measurements for CO2 and H2O in an Oort cloud comet, and the first measurement of 1 Ceres at 2.73 m to refine the shape of the infrared water absorption feature. The performance of the Fine Steering Mirror (FSM) was also demonstrated. The BOPPS platform can continue to be leveraged on future flights even as GHAPS is being developed. The study affirms the planetary decadal recommendations, and shows that a number of Top Priority science questions can be achieved. A combination GHAPS and BOPPS would provide the best value for PSD for realizing that science.

Dankanich, John W.↗

Summary of the Science performed onboard the International Space Station during Increments 12 and 13

By September of 2007, continuous human presence on the International Space Station will reach a milestone of eighty months. The many astronauts and cosmonauts, who live onboard the station during the last fourteen Increments over that time span, spend their time building the station as well as performing science on a daily basis. Over those eighty months, the U.S astronauts crew members logged over 2954 hours of research time. Far more research time has been accumulated by experiments controlled by investigators on the ground. The U.S astronauts conducted over one hundred and twenty six (126) science investigations. From these hundred and twenty six science investigations, many were operated across multiple Increments. The crew also installed, activated and operated nine (9) science racks that supported six science disciplines ranging from material sciences to life science. By the end of Increment 14, a total of 5083 kg of research rack mass were ferried to the station as well as 5021 kg of research mass. The objectives of this paper are three-fold. (1) To briefly review the science conducted on the International Space Station during the previous eleven Increments; (2) to discuss in detail the science investigations that were conducted on the station during Increments 12 and 13. The discussion will focus mainly on the primary objectives of each investigation and their associated hypotheses that were investigated during these two Increments. Also, some preliminary science results will be discussed for each of the investigation as science results availability permit. (3) The paper will briefly touch on what the science complement planning was and what was actually accomplished due to real time science implementation and challenges during these two Increments in question to illustrate the challenges of daily science activity while the science platform is under construction. Finally, the paper will briefly discuss the science research complements for the other two Increments, Increments 14 and 15, to preview how much science might be accomplished during these two Increments.

Jules, Kenol↗