Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Astronaut-Induced Disturbances to the Microgravity Environment of the Mir Space Station

In preparation for the International Space Station, the Enhanced Dynamic Load Sensors Space Flight Experiment measured the forces and moments astronauts exerted on the Mir Space Station during their daily on-orbit activities to quantify the astronaut-induced disturbances to the microgravity environment during a long-duration space mission. An examination of video recordings of the astronauts moving in the modules and using the instrumented crew restraint and mobility load sensors led to the identification of several typical astronaut motions and the quantification or the associated forces and moments exerted on the spacecraft. For 2806 disturbances recorded by the foot restraints and hand-hold sensor, the highest force magnitude was 137 N. For about 96% of the time, the maximum force magnitude was below 60 N, and for about 99% of the time the maximum force magnitude was below 90 N. For 95% of the astronaut motions, the rms force level was below 9.0 N. It can be concluded that expected astronaut-induced loads from usual intravehicular activity are considerably less than previously thought and will not significantly disturb the microgravity environment.

Newman, Dava J.↗

Designing Space Station Freedom for evolution

The requirements for using the Space Station for research and development and to support human missions to the Moon and Mars are examined. Space Station configurations are presented for these two cases. It is suggested that, by the year 2010, the Space Station requirements for research and development should include 275 kW of average power, a crew of 24, 5 full laboratory modules, and 3 pocket labs. For supporting the Lunar/Mars program as a transportation node facility, the Space Station should require 175 kw of average power, 16 crew members, 3 full laboratory modules, and 1 pocket lab.

Huckins, Earle K., III↗

The effects of nonlinear loading upon the Space Station Freedom 20 kHz power system

The Space Station Freedom power distribution system, which consists of dual redundant 20-kHz, 440-V RMS, single-phase power systems, is discussed. The effect of a typical space station nonlinear load on the measurement of RMS current and voltage at various points in the space station power system has been investigated using the Electromagnetic Transients Program (EMTP). The load current distortion at the user interface, its effect on the distribution system, and its relationship to power factor have been studied. Modeling results are compared to test data. The differences under nonlinear loading are evaluated and presented as a measure of distribution voltage distortion and current measurement accuracy.

Leskovich, R. Thomas↗

Space Station Freedom integrated research and development growth

Space Station Freedom is designed to be an Earth-orbiting multidiscipline research and development (R&D) facility capable of evolution to accommodate a variety of potential uses. One evolution scenario is growth to an enhanced R&D facility. In support of the Space Station Freedom Program Preliminary Design Review, the NASA Langley Research Center Space Station Office is analyzing growth requirements and evaluating configurations for this R&D utilization. This paper presents a summary of this analysis including time-phased growth plans, R&D growth issues and configurations, and recommendations for the program baseline design which will facilitate evolutionary R&D growth.

Saucillo, Rudy J.↗

Space station propulsion technology

The progress on the Space Station Propulsion Technology Program is described. The objectives are to provide a demonstration of hydrogen/oxygen propulsion technology readiness for the Initial Operating Capability (IOC) space station application, specifically gaseous hydrogen/oxygen and warm hydrogen thruster concepts, and to establish a means for evolving from the IOC space station propulsion to that required to support and interface with advanced station functions. The evaluation of concepts was completed. The accumulator module of the test bed was completed and, with the microprocessor controller, delivered to NASA-MSFC. An oxygen/hydrogen thruster was modified for use with the test bed and successfully tested at mixture ratios from 4:1 to 8:1.

Briley, G. L.↗

Space Station payload accommodations

Accommodating a multitude of diverse payloads on the Space Station base and its platforms requires an early definition of payload candidates to assure an adequate assessment of payload requirements. The task of interpreting the payload requirements, translating them into Station design requirements, and developing the processes and procedures to accommodate and integrate the user onto the Station is the function of the NASA Space Station Program Office Utilization and Operations Group. This paper describes the Space Station assembly sequence, time-phased payload accommodations, and the unique research environment provided by the Space Station.

Hemmerdinger, Louis↗

Space Station Freedom Utilization Conference. Executive summary

The Space Station Freedom Utilization Conference was held on 3-6 Aug. 1992 in Huntsville, Alabama. The purpose of the conference was to bring together prospective space station researchers and the people in NASA and industry with whom they would be working to exchange information and discuss plans and opportunities for space station research. Topics covered include: research capabilities; research plans and opportunities; life sciences research; technology research; and microgravity research and biotechnology.

Source record↗

Space Station maintenance concept study

The relationships among NASA Space Station operational constraints and logistical requirements are presently investigated. The concepts studied locate organizational, intermediate, and depot maintenance at the Space Station, at the Kennedy Space Center (KSC), and at a depot remote from the KSC. Measures of reliability, maintainability, and availability were selected; a life-cycle study was then conducted to ascertain the optimum Space Station system maintenance concept. The results obtained indicate that orbital replacement unit MTBFs should not be less than 36,000 hours.

Nelson, Eric E.↗

Space station contamination modeling

Current plans for the operation of Space Station Freedom allow the orbit to decay to approximately an altitude of 200 km before reboosting to approximately 450 km. The Space Station will encounter dramatically increasing ambient and induced environmental effects as the orbit decays. Unfortunately, Shuttle docking, which has been of concern as a high contamination period, will likely occur during the time when the station is in the lowest orbit. The combination of ambient and induced environments along with the presence of the docked Shuttle could cause very severe contamination conditions at the lower orbital altitudes prior to Space Station reboost. The purpose here is to determine the effects on the induced external environment of Space Station Freedom with regard to the proposed changes in altitude. The change in the induced environment will be manifest in several parameters. The ambient density buildup in front of ram facing surfaces will change. The source of such contaminants can be outgassing/offgassing surfaces, leakage from the pressurized modules or experiments, purposeful venting, and thruster firings. The third induced environment parameter with altitude dependence is the glow. In order to determine the altitude dependence of the induced environment parameters, researchers used the integrated Spacecraft Environment Model (ISEM) which was developed for Marshall Space Flight Center. The analysis required numerous ISEM runs. The assumptions and limitations for the ISEM runs are described.

Gordon, T. D.↗

A simulation system for Space Station extravehicular activity

America's next major step into space will be the construction of a permanently manned Space Station which is currently under development and scheduled for full operation in the mid-1990's. Most of the construction of the Space Station will be performed over several flights by suited crew members during an extravehicular activity (EVA) from the Space Shuttle. Once fully operational, EVA's will be performed from the Space Station on a routine basis to provide, among other services, maintenance and repair operations of satellites currently in Earth orbit. Both voice recognition and helmet-mounted display technologies can improve the productivity of workers in space by potentially reducing the time, risk, and cost involved in performing EVA. NASA has recognized this potential and is currently developing a voice-controlled information system for Space Station EVA. Two bench-model helmet-mounted displays and an EVA simulation program have been developed to demonstrate the functionality and practicality of the system.

Marmolejo, Jose A.↗

The use of multidimensional scaling for facilities layout - An application to the design of the Space Station

Before an optimum layout of the facilities for the proposed Space Station can be designed, it is necessary to understand the functions that will be performed by the Space Station crew and the relationships among those functions. Five criteria for assessing functional relationships were identified. For each of these criteria, a matrix representing the degree of association of all pairs of functions was developed. The key to making inferences about the layout of the Space Station from these matrices was the use of multidimensional scaling (MDS). Applying MDS to these matrices resulted in spatial configurations of the crew functions in which smaller distances in the MDS configuration reflected closer associations. An MDS analysis of a composite matrix formed by combining the five individual matrices resulted in two dimensions that describe the configuration: a 'private-public' dimension and a 'group-individual' dimension. Seven specific recommendations for Space Station layout were derived from analyses of the MDS configurations. Although these techniques have been applied to the design of the Space Station, they can be applied to the design of any facility where people live or work.

Tullis, Thomas S.↗

Liquid helium servicing from the Space Station

The current concept of liquid helium resupply from the Space Station is discussed with regard to user and Space Station requirements, as well as requirements of the liquid helium servicing facility itself. A number of trade-offs which will affect both the hardware and the operation of the facility are presented. A total of 12 potential users have been identified. The users are divided into two groups: large volume users which are serviced every one to two years and small volume users which are serviced every few months. Both groups have a very strong impact on the definition of the liquid helium servicing facility. The facility components will be based on results of the Superfluid Helium On Orbit Transfer flight demonstration being conducted by NASA. Currently, the Space Station design includes a customer servicing bay which provides electrical power, thermal and contamination control, and connections for control and data handling systems. Restrictions on venting and vibrational disturbances on the Space Station may preclude servicing during quiescent periods when accelerations are minimal.

Breon, S. R.↗

The Space Station program definition and preliminary systems design - Recent developments

It is pointed out that space stations represent a major vehicle for accomplishing many things mankind envisions for space activities. Thus, space stations have become necessary stepping-off points for deep-space expeditions, and it is expected that they will lead eventually to the permanent occupancy of another planet. The present paper provides a report regarding planning activities in the U.S. and in other countries which have made significant progress in making a permanent Space Station a reality. The Space Station will consist of a manned base and associated platforms, as well as collateral support equipment. The purpose of the program definition and preliminary design activities (Phase B) is to arrive at the baseline configuration before initiating actual hardware development. Details of the program plan are discussed along with user considerations in design, the commercialization of space, design issues, operations, and Space Station evolution.

Freitag, R. F.↗

One Year Old and Growing: A Status Report on the International Space Station and Its Partners

The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

Bartoe, John-David F.↗

MISSE 6, 7 and 8 Materials Sample Experiments from the International Space Station Materials and Processes Team

The International Space Station Materials and Processes (ISS M&P) team has multiple material samples on MISSE 6, 7 and 8 to observe Low Earth Orbit (LEO) environmental effects on Space Station materials. Optical properties, thickness/mass loss, surface elemental analysis, visual and microscopic analysis for surface change are some of the techniques employed in this investigation. The ISS M&P team has participated in previous MISSE activities in order to better characterize the LEO effects on Space Station materials. This investigation will further this effort. Results for the following MISSE 6 samples materials will be presented: a comparison of anodize and chemical conversion coatings on various aluminum alloys, electroless nickel; AZ93 white ceramic thermal control coating with and without Teflon; Hyzod(TM) polycarbonate used to temporarily protect ISS windows; Russian quartz window material; reformulated Teflon (TM) coated Beta Cloth (Teflon TM without perfluorooctanoic acid (PFOA)) and a Dutch version of beta cloth. Discussion for current and future MISSE materials experiments will be presented. MISSE 7 samples are: deionized water sealed anodized aluminum Photofoil(TM); indium tin oxide (ITO)- coated Kapton(TM) used as thermo-optical surfaces; mechanically scribed tin-plated beryllium-copper samples for "tin pest" growth ( alpha/Beta transformation); Crew Exploration Vehicle (CEV) parachute soft goods. MISSE 8 sample: exposed "scrim cloth" (fiberglass weave) from the ISS solar array wing material, Davlyn fiberglass sleeve material, Permacel and Intertape protective tapes, and ITO-coated Kapton.

Kravchenko, Michael↗

Space Station - An overview of current U.S. activities

The National Aeronautics and Space Administration (NASA) has begun developing a permanently manned Space Station as mandated by President Reagan. The Space Station will be operational within a decade and is the 'Next Logical Step' in America's space program. This paper presents a summary of the Space Station status, current planning guidelines, and the possibilities for international participation in the program. The conceptual architecture and evolutionary development options for the Space Station are also briefly discussed.

Freitag, R. F.↗

Human Factors Lessons Learned on the International Space Station

Experience on International Space Station (ISS) provides many important lessons for future space flight. NASA human factors engineers have been systematically collecting lessons learned from crew debriefs, as well as working with ground support teams to continuously improve crew operations. This paper describes the methods for collecting data from debriefs, lessons learned through that process, and an example of a technology development task funded through the Space Human Factors Engineering (SHFE) program element in response to an identified operational need. Each ISS increment crew spends many hours after the flight answering questions from the various subsystem leads. The Flight Crew Integration subsystem lead asks questions specific to human factors and habitability issues. In addition, crew comments on many other subsystems provide insight into interface designs, operability and maintainability. The debrief comments are unique to each crew, and must be categorized to provide operational lessons learned. Personal identifiers are removed and comments aggregated to separate consistent issues from personal preferences. Examples will be given, and the procedure for incorporating the lessons into requirements and guidelines for the next human space vehicle will be described. In flight, very few astronauts are medical doctors. Written medical procedures during flight need to be easy to follow and quick to understand. The problem was analyzed as part of a SHFE task. Organization was analyzed and reorganizations were created and tested. Results will be reported. The ISS is a very important analog for planning future long-term missions. Collection of data from debriefs, studying the lessons learned and focusing on requirements for future missions are examples of the accomplishments through the SHFE program.

Woolford, Barbara↗