Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

The JLab 12GeV Upgrade and the Initial Science Program

An overview is presented of the upgrade of JLab's cw electron accelerator from a beam energy of currently 6 GeV to 12 GeV. Construction of the 12 GeV upgrade project has started in 2008. A broad experimental program has been developed to map the nucleon's intrinsic correlated spin and momentum distribution through measurements of deeply exclusive and semi-inclusive processes, and to probe the quark and gluon con nement by studying the spectrum of mesons with exotic quantum numbers. Other programs include the forward parton distribution function at large xB, the quark and gluon polarized distribution functions, the measurements of electromagnetic form factors of the nucleon ground state and of nucleon resonance transitions at high Q2, and the exploration of physics beyond the Standard Model in high precision parity violating processes. The 12 GeV electron beam is also well suited to explore quark hadronization properties using the nucleus as a laboratory.

Burkert, Volker↗

A Model Predictive Control Based Generator Start-Up Optimization Strategy for Restoration With Microgrids as Black-Start Resources

Microgrids (MGs) can operate in an islanded mode and serve as black-start resources for power system restoration (PSR). Here, a model predictive control (MPC) based generator start-up optimization strategy for PSR is proposed utilizing MGs as black-start resources. First, the generator start-up sequence (GSUS) optimization is formulated as a mixed integer linear programming. Then, the uncertainties of MG black-start resources (MBSRs) are modeled by discretizing the probability distribution of the forecast errors, and representative scenarios for MBSRs extracted by formulating the probability mass transportation problem. Third, the generator start-up optimization strategy considering MBSRs is proposed utilizing the MPC technique, in which the optimization objective is to maximize the energy capability of the power systems and minimize the load curtailment of the MGs in each looking-ahead interval. Simulations on the IEEE 118 bus system with MGs and Zhejiang provincial power system in China verify that the introduced strategy for PSR can successfully restore the power system and effectively determine the optimal GSUS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demystifying Solar in WAP

Over the last two years, the National Renewable Energy Laboratory has identified the pathways for implementing solar in the Weatherization Assistance Program and Low Income Home Energy Assistance Program and practices for successful implementation. Learn about successful implementation models from around the network and the new resources that can give you a head start in planning solar into your program, including a demonstration of tools to help evaluate solar potential and cost-effectiveness at the household level, as well as a new tool from the U.S. Department of Energy National Community Solar Partnership to help connect households receiving LIHEAP assistance to community solar subscriptions that guarantee energy bill savings.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Germany's First Steps in the Restarted Site Selection Process - 18015

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in Interim and Final Storage of HLW in Germany - 19060

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Polymer Compositions in Critical Experiments: Possibly Not What You Think

The Chlorine Worth Study (CWS) Experiment was performed at the National Criticality Experiments Research Center (NCERC) in December 2021. Its goal was to provide a validation benchmark experiment with chlorine and plutonium in the thermal neutron spectrum. This purpose is necessary to reduce the margin of subcriticality in aqueous chloride operations at the Los Alamos National Laboratory Plutonium Facility (PF-4). Reducing the margin of subcriticality will enable higher throughput, required to meet NNSA mission needs. The experiment used layers of plutonium plates, polyethylene (HDPE), aluminum, and polyvinyl chloride (PVC) or chlorinated polyvinyl chloride (CPVC). They were optimized to match plutonium-chloride solutions of 30 g/L, 300 g/L, and 600 g/L. Upon completion of the experiment, a International Criticality Safety Benchmark Evaluation Program (ICSBEP) report was immediately started. The compositions of all materials were assumed pure unless additional information was known (such as for the plutonium plates). During the benchmark analysis, the assumed CPVC composition was questioned. The follow-on work led to lessons learned on compositions in benchmarks. Materials, and specifically polymers, are often much more complex than a basic chemical formula. The CWS experiment is used as an example in this paper to document the lessons learned.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Generic FEPs Catalogue and Salt Knowledge Archive

This report describes the development of a comprehensive catalogue of generic features, events, and processes (FEPs) that are potentially important for the post-closure performance of a repository for high-level radioactive waste (HLW) and spent nuclear fuel (SNF) in salt (halite) host rock. The FEPs and other supporting information have been entered into a “SaltFEP” Database. The generic salt repository FEPs include consideration of relevant FEPs from a number of U.S., Dutch, German, and international FEP lists and should be a suitable starting point for any repository program in salt host rock. The salt FEP catalogue and database employ a FEP classification matrix approach that is based on the concept that a FEP is typically a process or event acting upon or within a feature. The FEP matrix provides a two-dimensional structure consisting of a Features/Components axis that defines the “rows” and a Processes/Events axis that defines the “columns” of the matrix. The design of the FEP classification matrix is consistent with repository performance assessment – the Features/Components axis is organized vertically to generally correspond to the direction of potential radionuclide migration (from the waste to the biosphere) and the Processes/Events axis is designed to represent the common two-way couplings between thermal processes and other processes (such as thermal-mechanical or thermal-hydrologic processes). Related FEPs can be easily identified – related FEPs will typically be grouped in a single matrix cell or aligned along a common row (Feature/Component) or column (Process/Event). The online SaltFEP database can be downloaded from www.saltfep.org. It contains the FEP matrix, the FEPs, and the associated processes for each FEP. It provides a starting point to create and document site-specific individual FEPs. Furthermore, the FEP matrix is connected to the Salt Knowledge Archive (SKA), a database of about 20,000 references and documents representing the historical knowledge on radioactive disposal in salt. This work is the result of an ongoing collaboration between researchers in the U.S., the Netherlands, and Germany, and supports the NEA Salt Club Mandate. It builds upon prior work which is documented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fish Passage Center 2007 Annual Report.

The January-July runoff volume above the Dalles Dam in 2007 was 89% of the average runoff volume for the 1971-2000 historical record. The April-July runoff volume at Lower Granite Dam was 68% of the 1971-2000 historical record. Over the 79 year historical record from 1929 through 2007, the 2007 January-July runoff volume at the Dalles was the 50th lowest year out of the 79th year record. The January through July runoff volume at Lower Granite was the 65th lowest runoff year out of 79 on record. This year can be characterized by steadily decreasing snowpack which was below average in the Columbia Basin by the end of April. The combination of runoff volume, decreasing snowpack and reservoir operations resulted in spring migration flows at McNary Dam averaging 239 Kcfs, slightly above the Biological Opinion flow objective of 237 Kcfs. However the spring period migration flows in the Snake River averaged 61 Kcfs at Lower Granite Dam, substantially below the Biological Opinion flow objective of 85 Kcfs. Summer migration period Biological Opinion flow objectives averaged 163 Kcfs at McNary Dam, substantially below the summer flow objective of 200 Kcfs. Summer migration period flows in the Snake River at Lower Granite Dam averaged 29 Kcfs, also substantially below the Biological Opinion flow objective of 50 Kcfs. Overall spring migrants in the Columbia River experienced better migration flows than spring migrants in the Snake River reach. Summer migration flow objectives were not achieved in either the Columbia or Snake rivers. The 2007 FCRPS Operations Agreement represents an expanded and improved spill program that goes beyond the measures contained in the 2004 Biological Opinion. During the spring period, spill now occurs for twenty-four hours per day at all projects, except for John Day Dam where the daily program remains at 12 hours. A summer spill program provides spill at all the fish transportation collector projects (Lower Granite, Little Goose, Lower Monumental and McNary dams), whereas prior to 2005 spill was terminated at these projects after the spring period. In addition, the 2007 operations agreement provided regardless of flow conditions. For the first time spill for fish passage was provided in the low flow conditions that prevailed in the Snake River throughout the spring and summer migration periods. Gas bubble trauma (GBT) monitoring continued throughout the spill period. A higher incidence of rank 1, GBT signs were observed in late arriving steelhead smolts arriving after the 95% passage date had occurred. During this time dissolved gas levels were generally below the 110% water quality standard in the forebay where fish were sampled. This occurrence was due to prolonged exposure and extended travel times due to low migration flows. The 2007 migration conditions differed from any year in the historic record. The migration conditions combined low river flows in the Snake River with spill throughout the spring and summer season. The juvenile migration characteristics observed in 2007 were unique compared to past years in that high levels of 24 hour spill for fish passage were provided in low flow conditions, and with a delayed start to the smolt transportation program a smaller proportion of the total run being transported. This resulted in relatively high spring juvenile survival despite the lower flows. The seasonal spring average flow in the Snake River was 61 Kcfs much lower than the spring time average of 120 Kcfs that occurred in 2006. However juvenile steelhead survival through the Lower Granite to McNary reach in 2007 was nearly 70% which was similar to the juvenile steelhead survival seen in 2006 under higher migration flows. The low flows in the May-July period of 2007 were similar to the 2001 low flow year, yet survival for fall chinook juveniles in this period in 2007 was much higher. In 2001 the reach survival estimate for juvenile fall Chinook from Lower Granite to McNary Dam ranged from 0.25-0.34, while survival in the same reach ranged between 0.54-0.60 in 2007. In addition travel time estimates showed that summer migrants traveled much more rapidly in 2007 than in 2001, even under similar flows. The median travel time through the Lower Granite to McNary reach for summer migrants averaged 22 days compared to a range of 32 to 42 days in 2001. The primary operational difference between 2001 and 2007 low flow years was the provision of 24 hour spill in 2007. Hatchery production of summer steelhead, fall chinook and coho increased in 2007 compared to 2006. However, hatchery production of fall chinook decreased in the Snake River zone in 2006. Coho production is still lower than the peak production level which occurred in 2004. Although hatchery steelhead releases increased in the Lower Columbia zone, the Snake River zone accounts for over 80% of the steelhead production in the Columbia Basin above Bonneville Dam.

13 HYDRO ENERGY↗

Analysis of Modeling Assumptions used in Production Cost Models for Renewable Integration Studies

Renewable energy integration studies have been published for many different regions exploring the question of how higher penetration of renewable energy will impact the electric grid. These studies each make assumptions about the systems they are analyzing; however the effect of many of these assumptions has not been yet been examined and published. In this paper we analyze the impact of modeling assumptions in renewable integration studies, including the optimization method used (linear or mixed-integer programming) and the temporal resolution of the dispatch stage (hourly or sub-hourly). We analyze each of these assumptions on a large and a small system and determine the impact of each assumption on key metrics including the total production cost, curtailment of renewables, CO2 emissions, and generator starts and ramps. Additionally, we identified the impact on these metrics if a four-hour ahead commitment step is included before the dispatch step and the impact of retiring generators to reduce the degree to which the system is overbuilt. We find that the largest effect of these assumptions is at the unit level on starts and ramps, particularly for the temporal resolution, and saw a smaller impact at the aggregate level on system costs and emissions. For each fossil fuel generator type we measured the average capacity started, average run-time per start, and average number of ramps. Linear programming results saw up to a 20% difference in number of starts and average run time of traditional generators, and up to a 4% difference in the number of ramps, when compared to mixed-integer programming. Utilizing hourly dispatch instead of sub-hourly dispatch saw no difference in coal or gas CC units for either start metric, while gas CT units had a 5% increase in the number of starts and 2% increase in the average on-time per start. The number of ramps decreased up to 44%. The smallest effect seen was on the CO2 emissions and total production cost, with a 0.8% and 0.9% reduction respectively when using linear programming compared to mixed-integer programming and 0.07% and 0.6% reduction, respectively, in the hourly dispatch compared to sub-hourly dispatch.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Curved channel MCP improvement program

Blowholes and blemishes were determined to start at two stages of manufacturing. Sperical blowholes resulted from trapped gas between the high melting temperature bond glass and the MCP wafer. During thermal processing, the trapped gas expanded and displaced the softened channel glass to form a spherical inclusion. This defect was eliminated by grinding the prefritted bond wafer and channel plate wafer to a flatness which ensured intimate contact prior to fusion. Elliptical blowholes or blemishes were introduced during the fiber draw stage. Contaminants trapped between the core bar and clad tubing volatized providing large quantities of expanding gas. These pockets of gas became elongated to an ellipsoidal shape during fiber draw. Special cleanliness procedures were developed for the grinding, polishing, and acid etching of core bars. Improvements in channel curvature fabrication were implemented. The design of the shearing fixture was evaluated. A new design was developed which eliminated an off-axis moment. The shearing furnace design was evaluated. Steady state thermal conditions instead of thermal transient conditions were determined to reduce curvature nonuniformity.

Laprade, Bruce N.↗

Geothermal Case Studies

The US Geological Survey (USGS) resource assessment (Williams et al., 2009) outlined a mean 30GWe of undiscovered hydrothermal resource in the western US. One goal of the Geothermal Technologies Office (GTO) is to accelerate the development of this undiscovered resource. The Geothermal Technologies Program (GTP) Blue Ribbon Panel (GTO, 2011) recommended that DOE focus efforts on helping industry identify hidden geothermal resources to increase geothermal capacity in the near term. Increased exploration activity will produce more prospects, more discoveries, and more readily developable resources. Detailed exploration case studies akin to those found in oil and gas (e.g. Beaumont, et al, 1990) will give operators a single point of information to gather clean, unbiased information on which to build geothermal drilling prospects. To support this effort, the National Renewable Energy laboratory (NREL) has been working with the Department of Energy (DOE) to develop a template for geothermal case studies on the Geothermal Gateway on OpenEI. In fiscal year 2013, the template was developed and tested with two case studies: Raft River Geothermal Area (http://en.openei.org/wiki/Raft_River_Geothermal_Area) and Coso Geothermal Area (http://en.openei.org/wiki/Coso_Geothermal_Area). In fiscal year 2014, ten additional case studies were completed, and additional features were added to the template to allow for more data and the direct citations of data. The template allows for: Data - a variety of data can be collected for each area, including power production information, well field information, geologic information, reservoir information, and geochemistry information. Narratives ? general (e.g. area overview, history and infrastructure), technical (e.g. exploration history, well field description, R&D activities) and geologic narratives (e.g. area geology, hydrothermal system, heat source, geochemistry.) Exploration Activity Catalog - catalog of exploration activities conducted in the area (with dates and references.) NEPA Analysis ? a query of NEPA analyses conducted in the area (that have been catalogued in the OpenEI NEPA database.) In fiscal year 2015, NREL is working with universities to populate additional case studies on OpenEI. The goal is to provide a large enough dataset to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.

15 GEOTHERMAL ENERGY↗

High Momentum Transfer Nucleon Elastic Electromagnetic Form Factor Measurements Using Super BigBite Spectrometer at Jefferson Lab

The nucleons - protons and neutrons - are the basic building blocks of atomic nuclei. We now know that the nucleon consists of fundamental particles called quarks and gluons. The quarks interact with each other by exchanging gluons via the strong interaction. Understanding the quark-gluon structure of the nucleon, especially the confinement of quarks within the nucleon in its ground state, remains one of the main unsolved puzzles of particle physics. The nucleon electromagnetic form factors are directly related to the internal structure of the nucleon. A new generation of high precision experiments, GEp-V, GEn-II, GEn-RP, and GMn, measuring the ground state nucleon space-like electro-magnetic form factor at high momentum transfer is underway at Jefferson Lab experimental Hall-A as part of the Super Bigbite Spectrometer (SBS) program. This series of experiments will provide a new level of understanding of the nucleon structure. These experiments are highly demanding due to the extremely fast drop off of the elastic cross section with the increasing four-momentum transfer squared(Q2). This thesis provides an overview of the SBS physics program and reports on the extensive R&D program carried out to achieve the high rate running conditions essential for carrying out the SBS experiments. SBS will provide an intermediate solid angle of approximately 35 msr, which is significantly larger than the solid angle of other dipole based spectrometers at Jefferson lab. Of course, there are much larger acceptance spectrometers at Jefferson Lab, CLAS12 for example. What is special about SBS is that it provides a sizable acceptance while operating at the highest possible luminosity at Jefferson Lab. With this combination of medium acceptance and the highest available luminosity, SBS provides an unparalleled opportunity to explore the nucleon in its ground state with unprecedented resolution. The relatively large acceptance of SBS is achieved by using a large gap dipole magnet and placing it close to the target. An unavoidable consequence of this is that the SBS GEM trackers and other detectors have a clear line-of-sight view of the target and a portion of the beam-line. As a result, the background hit rate in the SBS front GEM trackers is expected to be up to 500 kHz/cm2, over the entire active area of 6000 cm2. To the best of our knowledge, this extremely high rate over such a large area is unprecedented in any particle tracking system used anywhere in the world before. Correctly reconstructing the particle tracks of interest in this very high background environment is achieved by using especially adapted high rate techniques at every step of the tracking process: optimizing the GEM module and tracker design at the hardware level, using high bandwidth electronics and real time Field Programmable Gate Array (FPGA) based background suppression techniques at the Data Acquisition (DAQ) level, and developing highly specialized tracking algorithms to pick out the signal hits from among the vast amount of background hits. In order to ensure a smooth start and running of the SBS experiments, it is extremely crucial that these techniques are developed, implemented, and tested under realistic conditions well before the actual start of the SBS experimental program. A detailed Geant4 simulation of the experiment was combined with a digitization package to generate the detector level pseudodata similar to what is expected in the actual experiments. The digitization procedures were calibrated against actual GEM data from cosmic-ray runs, X-ray tests, beam test runs in experimental Hall-A, and the PRad experiment in Hall B. Then, optimized tracking algorithms were developed and implemented in an analysis program used to analyze these pseudo-data and to extract expected high-level parameters. These extracted quantities were then compared with the input parameters from the simulation to verify and determine the performance characteristics for the SBS tracker. From this work, a final tracking efficiency of 69% at 25% occupancy was achieved, with the required reconstruction accuracy, for the GMn experiment, the first experiment in the SBS program, with background level at 100 kHz/cm2. These demonstrated parameters are adequate for the successful running of not only the GMn experiment but as well as for GEn-RP and GEn-II experiments, the second and third experiments in the program. This work builds the solid ground to further improve the tracking performance for these experiments and achieve similar conditions for the running of the GEp-V experiment, the most demanding experiment in the SBS program, with an expected background level at 500 kHz/cm2.

Di, Danning↗

NASA's activities in the conservation of strategic aerospace materials

The United States imports 50-100 percent of certain metals critical to the aerospace industry, namely, cobalt, columbium, chromium, and tantalum. In an effort to reduce this dependence on foreign sources, NASA is planning a program called Conservation of Strategic Aerospace Materials (COSAM), which will provide technology minimizing strategic metal content in the components of aerospace structures such as aircraft engines. With a proposed starting date of October 1981, the program will consist of strategic element substitution, process technology development, and alternate materials research. NASA's two-fold pre-COSAM studies center on, first, substitution research involving nickel-base and cobalt-base superalloys (Waspaloy, Udimet-700, MAE-M247, Rene 150, HA-188) used in turbine disks, low-pressure blades, turbine blades, and combustors; and, second, alternate materials research devoted initially to investigating possible structural applications of the intermetallic alloys nickel aluminide and iron aluminide.

Stephens, J. R.↗

Mongoose: Creation of a Rad-Hard MIPS R3000

This paper describes the development of a 32 Bit, full MIPS R3000 code-compatible Rad-Hard CPU, code named Mongoose. Mongoose progressed from contract award, through the design cycle, to operational silicon in 12 months to meet a space mission for NASA. The goal was the creation of a fully static device capable of operation to the maximum Mil-883 derated speed, worst-case post-rad exposure with full operational integrity. This included consideration of features for functional enhancements relating to mission compatibility and removal of commercial practices not supported by Rad-Hard technology. 'Mongoose' developed from an evolution of LSI Logic's MIPS-I embedded processor, LR33000, code named Cobra, to its Rad-Hard 'equivalent', Mongoose. The term 'equivalent' is used to infer that the core of the processor is functionally identical, allowing the same use and optimizations of the MIPS-I Instruction Set software tool suite for compilation, software program trace, etc. This activity was started in September of 1991 under a contract from NASA-Goddard Space Flight Center (GSFC)-Flight Data Systems. The approach affected a teaming of NASA-GSFC for program development, LSI Logic for system and ASIC design coupled with the Rad-Hard process technology, and Harris (GASD) for Rad-Hard microprocessor design expertise. The program culminated with the generation of Rad-Hard Mongoose prototypes one year later.

Lincoln, Dan↗

Implementation of Relativistic Coupled Cluster Theory for Massively Parallel GPU-Accelerated Computing Architectures

In this paper, we report reimplementation of the core algorithms of relativistic coupled cluster theory aimed at modern heterogeneous high-performance computational infrastructures. The code is designed for parallel execution on many compute nodes with optional GPU coprocessing, accomplished via the new ExaTENSOR back end. The resulting ExaCorr module is primarily intended for calculations of molecules with one or more heavy elements, as relativistic effects on the electronic structure are included from the outset. In the current work, we thereby focus on exact two-component methods and demonstrate the accuracy and performance of the software. The module can be used as a stand-alone program requiring a set of molecular orbital coefficients as the starting point, but it is also interfaced to the DIRAC program that can be used to generate these. We therefore also briefly discuss an improvement of the parallel computing aspects of the relativistic self-consistent field algorithm of the DIRAC program.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Excited nucleon spectrum and structure studies with CLAS and CLAS12

The study of the spectrum and structure of excited nucleon states employing the electroproduction of exclusive reactions is an important avenue for exploring the nature of the non-perturbative strong interaction. The CLAS detector in Hall B has provided the dominant part of the available world data on most relevant meson electroproduction channels off the nucleon in the resonance region for Q2 up to 5 GeV2. Analyses of CLAS data for the exclusive channels πN, ηN, and π+π-p on a proton target have provided the only results available on the Q2 evolution of the electro-excitation amplitudes for the transitions from the initial photon-proton to the final N* states in the mass range up to W =1.8 GeV. These electrocouplings allow for exploration of the internal structure of the produced excited nucleon states. This work has made it clear that consistent results from independent analyses of several exclusive channels with different resonance hadronic decay parameters and non-resonant backgrounds but the same N* electro-excitation amplitudes, is essential to have confidence in the extracted results. Starting in early 2018, a program to study the spectrum and structure of N* states in various exclusive electroproduction channels using the new CLAS12 spectrometer commenced. These studies will probe the structure of N* states in the mass range up to W =3 GeV and for Q2 as low as 0.05 GeV2 and as high as 10-12 GeV2, thus providing a means to access N* structure information spanning a broad range of distance scales. Quasi-real photoproduction studies are also planned to search for additional N* states, the so-called hybrid baryons, for which the glue serves as an active structural component. In this talk the N* programs from both CLAS and CLAS12 will be reviewed.

Carman, D. S.↗

Comparative proteogenomics: combining mass spectrometry and comparative genomics to analyze multiple genomes

While bacterial genome annotations have significantly improved in recent years, techniques for bacterial proteome annotation (including post-translational chemical modifications, signal peptides, proteolytic events, etc.) are still in their infancy. At the same time, the number of sequenced bacterial genomes is rising sharply, far outpacing our ability to validate the predicted genes, let alone annotate bacterial proteomes. In this study, we use tandem mass spectrometry (MS/MS) to annotate the proteome of Shewanella oneidensis MR-1, an important microbe for bioremediation. In particular, we provide the first comprehensive map of post-translational modifications in a bacterial genome, including a large number of chemical modifications, signal peptide cleavages and cleavage of N-terminal methionine residues. We also detect multiple genes that were missed or assigned incorrect start positions by gene prediction programs and suggest corrections to improve the gene annotation. This study demonstrates that complementing every genome sequencing project by an MS/MS project would significantly improve both genome and proteome annotations for a reasonable cost.

59 BASIC BIOLOGICAL SCIENCES↗