Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Progress in Scheduling Algorithms for a Collaborative Distributed System for Flight Planning

This Technical Memorandum describes four contributions made by the authors to a larger team effort toward developing a distributed system for scheduling commercial flights at navigation fixes and/or airport runways. These contributions are as follows: (1) a proof of correctness for a scheduling algorithm published previously by Meyn, (2) an improvement of Meyn's algorithm from quadratic to linear time, (3) two independent implementations of the algorithm with test results identical to those published, and (4) an extension of Meyn's algorithm to support minimum usable time intervals.

arrival scheduling↗

EVM and Schedule Management

The objective of EVMS surveillance is to ensure that the management control processes that support the performance measurement baseline (PMB) are in place, compliant with the EVMS guidelines, are routinely being used, and provide timely and reliable data. The PMB is a triple constraint where the constraints are schedule, budget and scope. For Surveillance, NASA uses the DCMA EVM Compliance Metrics (DECM) Tests that are aligned with the EIA-748 EVM Standard. Guidelines 6 is Scheduling Work, and DECM has 23 Tests for evaluating if the IMS supports project goals in its planning, statusing and forecasting. This session will focus on the Test Metric that analyzes forecast start/finish dates riding the status date of the IMS for two or more consecutive months as an example of how surveillance works in concert with IMS health checks. It will cover how to run the test to recognize trends and how this test helps ensure that the forecast is credible in support of critical path analysis.

EVM↗

Framework for Extensible, Asynchronous Task Scheduling (FEATS) in Fortran

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP, explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI), or compiler-specific language extensions such as those provided by CUDA. By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models. Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data-parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. The paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task-scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

Modern Fortran↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Hybrid Monte Carlo Tree Search Approach

We present the Multi-Route Weighted Package Delivery Problem (MRWPDP) and a scalable solution methodology as a major step towards enabling an airspace deconfliction service for drone delivery operations. The problem is motivated by Strategic deconfliction under the FAA’s “Unmanned Aircraft Systems Traffic Management” Concept of Operations. MRWPDP falls under a class of vehicle routing and scheduling problems, and as such is NP-Hard. In MRWPDP, a graph network is given which consists of depots, drop-off sites, and multiple routes connecting the two. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is to optimally schedule the departure time and assign routes to a known set of vehicles at the depot. We propose a heuristic solution to the problem by borrowing techniques from Mixed Integer Linear Programming (MILP), Constraint Programming, and Monte Carlo Tree Search (MCTS). The resulting hybrid framework is MCTS with Bound-and-Prune (BP) and rapid simulated updates (U), or MCTS-BP-U. This approach is able to quickly provide a feasible solution for MRWPDP, even for large problem instances up to 1000 vehicles. We provide a MILP formulation of MRWPDP and compare its performance against MCTS-BP-U in terms of solution quality. An agent-based model simulation is conducted as a final step to validate the efficacy of our approach.

air traffic scheduling↗

Aerial Vehicle Routing and Scheduling for UAS Traffic Management: A Hybrid Monte Carlo Tree Search Approach

We present the Multi-Route Weighted Package Delivery Problem (MRWPDP) and a scalable solution methodology as a major step towards enabling an airspace deconfliction service for drone delivery operations. The problem is motivated by Strategic deconfliction under the FAA’s “Unmanned Aircraft Systems Traffic Management” Concept of Operations. MRWPDP falls under a class of vehicle routing and scheduling problems, and as such is NP-Hard. In MRWPDP, a graph network is given which consists of depots, drop-off sites, and multiple routes connecting the two. In addition, routes are weighted by the associated ground risk and total travel distance for package delivery. The goal is to optimally schedule the departure time and assign routes to a known set of vehicles at the depot. We propose a heuristic solution to the problem by borrowing techniques from Mixed Integer Linear Programming (MILP), Constraint Programming, and Monte Carlo Tree Search (MCTS). The resulting hybrid framework is MCTS with Bound-and-Prune (BP) and rapid simulated updates (U), or MCTS-BP-U. This approach is able to quickly provide a feasible solution for MRWPDP, even for large problem instances up to 1000 vehicles. We provide a MILP formulation of MRWPDP and compare its performance against MCTS-BP-U in terms of solution quality. An agent-based model simulation is conducted as a final step to validate the efficacy of our approach.

air traffic scheduling↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

iDDS: intelligent distributed dispatch and scheduling for workflow orchestration

The intelligent distributed dispatch and scheduling (iDDS) service is a versatile workflow orchestration system designed for large-scale, distributed scientific computing. iDDS extends traditional workload and data management by integrating data-aware execution, conditional logic, and programmable workflows, enabling automation of complex and dynamic processing pipelines. Originally developed for the ATLAS experiment at the large hadron collider, iDDS has evolved into an experiment-agnostic platform that supports both template-driven workflows and a Function-as-a-Task model for Python-based orchestration. This paper presents the architecture and core components of iDDS, highlighting its scalability, modular message-driven design, and integration with systems such as PanDA and Rucio. We demonstrate its versatility through real-world use cases: fine-grained tape resource optimization for ATLAS, orchestration of large Directed Acyclic Graph (DAG) workflows for the Rubin Observatory, distributed hyperparameter optimization for machine learning applications, active learning for physics analyses, and AI-assisted detector design at the electron–ion collider. By unifying workload scheduling, data movement, and adaptive decision-making, iDDS reduces operational overhead and enables reproducible, high-throughput workflows across heterogeneous infrastructures. We conclude with current challenges and future directions, including interactive, cloud-native, and serverless workflow support.

97 MATHEMATICS AND COMPUTING↗

CRiSPPy: An advanced hydropower scheduling tool for the Colorado River Storage Project

The Western Area Power Administration (WAPA) plays a vital role in delivering reliable and cost-effective hydroelectric power to millions of customers across the western United States. The Colorado River Storage Project (CRSP) carries out WAPA’s mission in Arizona, Utah, Colorado, New Mexico, Nevada, Wyoming and Texas. Achieving this mission requires effective management of the Colorado River system, and depends on the use of advanced analytical tools and modeling methodologies. For many years, CRSP has relied on the Generation and Transmission Maximization Superlite (GTMax SL) model for its mid-term and long-term hydroscheduling needs. However, the evolving energy market, power system operations, environmental rules, and hydrology conditions, coupled with advancements in computational capabilities, have necessitated the development of a more modern and robust solution. This report introduces the Colorado River Storage Project Python-based (CRiSPPy) model, a new, advanced hydropower scheduling tool developed to address CRSP ever-evolving challenges. CRiSPPy represents a significant leap forward in our ability to model and optimize the operation of the Colorado River system. It incorporates state-of-the-art optimization algorithms, enhanced data management capabilities, and an advanced graphical user interface, providing WAPA CRSP personnel with unprecedented insights and decision-making support. This document details the development, capabilities, and implementation of CRiSPPy. It is intended to serve as a comprehensive resource for WAPA staff, stakeholders, and anyone interested in the future of hydropower scheduling in the Colorado River Basin. We are confident that CRiSPPy will enhance WAPA's mission while adapting to the challenges of a dynamic and increasingly complex environment. The version of CRiSPPy described in this report is the version 2.3. New versions of CRiSPPy will be developed as the tool keeps evolving to address CRSP challenges.

13 HYDRO ENERGY↗

LSST Scheduler & Progress Monitoring

The NSF-DOE Vera C. Rubin Observatory scheduling team is providing a set of tools for monitoring the scheduler and progress on the Legacy Survey of Space and Time (LSST). These slides provide an overview of available pages and assorted figures on them: the night summary provides an overview of a completed night of observing, including maps of exposures and plots of data quality metrics; the pre-night briefing, an analysis of a simulation of an upcoming night; and a handful of figures that provide information on long-term progress toward LSST survey goals.

H.Neilsen, Eric, Jr. [Fermilab] (ORCID:00000002735↗

DSN seven day/twelve week schedule program

Deep Space Network scheduling program allocates resources based on the users requirements. The system reviews and allocates the requests for equipment and resources. Depending upon the program input either the seven day or the twelve week schedule is generated.

Holzman, R. E.↗

Automated aircraft scheduling methods in the near terminal area.

A general scheduling algorithm for aircraft from terminal area entry to touchdown is developed. The method has the following novel features: (1) many speed classes of aircraft are considered and speed variations within classes and along portions of the flight path are permitted; (2) multiple paths are considered which may merge or diverge - the analysis is not restricted to a single runway nor to departures only; (3) landings are scheduled along conflict free flight paths in minimum time. The algorithm is currently being incorporated in a fast-time simulation of a STOL air traffic system.

Tobias, L.↗

Scheduling language and algorithm development study. Volume 2: Use of the basic language and module library

The capabilities of the specified scheduling language and the program module library are outlined. The summary is written with the potential user in mind and, therefore, provides maximum insight on how the capabilities will be helpful in writing scheduling programs. Simple examples and illustrations are provided to assist the potential user in applying the capabilities of his problem.

Chamberlain, R. A.↗

A vehicle scheduling algorithm using non-serial discrete dynamic programming with space shuttle applications

Description of the development and operation of a vehicle-scheduling algorithm which has applications to the NASA problem of assigning payloads to space delivery vehicles. The algorithm is based on a discrete, integer-valued, nonserial, dynamic-programming solution to the classical problem of developing resource utilization plans with limited resources. The algorithm places special emphasis on incorporating interpayload (precedence) relationships; maintaining optimal alternate schedule definitions (a unique feature of dynamic programming) in the event of contingencies (namely, resource inventory changes) without problem resolution; and, by using a special information storage technique, reducing the computational complexity of solving realistic problems.

Dupnick, E.↗

Response-produced timeouts under a progressive-ratio schedule with a punished reset option

An attempt is made to extend the generality of timeouts from positive reinforcement to more complex performances. Pigeons were provided with three continuously available options. Responses on one key resulted in food reinforcement under a progressive-ratio schedule, which requires a larger number of responses for successive reinforcements; responses on a second key, which were shocked, reset the progressive-ratio schedule to its first step; and responses on a third key produced a 3-min timeout. Some of these conditions have been studied previously (Dardano, 1968, 1973; Findley, 1958). Questions of general interest included the frequency and stability of response-produced timeouts, changes in the properties of the progressive-ratio performance resulting from the occurrence of timeouts, and the similarity of the relationships between timeouts and the reinforced behavior to relationships found under simpler conditions of reinforcement.

Dardano, J. F.↗

Evaluation of routing and scheduling considerations for possible future commercial hypersonic transport aircraft

Travel markets which would be served by high speed commercial transport aircraft and the ability of the airlines to schedule and route the aircraft in a way that would achieve good daily utilization and productivity are examined. The following areas are considered: (1) identification of the major long-haul city pairs that would most likely demand nonstop service; (2) selection of flight tracks observing alternative sonic boom restrictions; (3) estimation of flight times for all city pairs for the various sonic boom constraints; (4) impact of airport curfews on possible departure and arrival schedules; (5) projection of passenger traffic volumes on the selected city pairs; and (6) potential daily utilization and aircraft productivity.

Feir, J. B.↗