Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Mechanical qualification of the support structure for MQXF, the Nb 3 Sn low-β quadrupole for the high luminosity LHC

Within the scope of the High Luminosity LHC project, the collaboration between CERN and U.S. LARP is developing new low-β quadrupoles using the Nb 3 Sn superconducting technology for the upgrade of the LHC interaction regions. The magnet support structure of the first short model was designed and two units were fabricated and tested at CERN and at LBNL. The structure provides the preload to the collars-coils subassembly by an arrangement of outer aluminum shells pre-tensioned with water-pressurized bladders. For the mechanical qualification of the structure and the assembly procedure, superconducting coils were replaced with solid aluminum “dummy coils”, the structure was preloaded at room temperature, and then cooled-down to 77 K. Mechanical behavior of the magnet structure was monitored with the use of strain gauges installed on the aluminum shells, the dummy coils and the axial preload system. As a result, this paper reports on the outcome of the assembly and the cool-down tests with dummy coils, which were performed at CERN and at LBNL, and presents the strain gauge measurements compared to the 3D finite element model predictions.

43 PARTICLE ACCELERATORS↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗

Design Study for a Low-enriched Uranium Core for the High Flux Isotope Reactor, Annual Report for FY 2007

This report documents progress made during fiscal year 2007 in studies of converting the High Flux Isotope Reactor (HFIR) from highly enriched uranium (HEU) fuel to low enriched uranium fuel (LEU). Conversion from HEU to LEU will require a change in fuel form from uranium oxide to a uranium-molybdenum alloy. A high volume fraction U/Mo-in-Al fuel could attain the same neutron flux performance as with the current, HEU fuel but materials considerations appear to preclude production and irradiation of such a fuel. A diffusion barrier would be required if Al is to be retained as the interstitial medium and the additional volume required for this barrier would degrade performance. Attaining the high volume fraction (55 wt. %) of U/Mo assumed in the computational study while maintaining the current fuel plate acceptance level at the fuel manufacturer is unlikely, i.e. no increase in the percentage of plates rejected for non-compliance with the fuel specification. Substitution of a zirconium alloy for Al would significantly increase the weight of the fuel element, the cost of the fuel element, and introduce an as-yet untried manufacturing process. A monolithic U-10Mo foil is the choice of LEU fuel for HFIR. Preliminary calculations indicate that with a modest increase in reactor power, the flux performance of the reactor can be maintained at the current level. A linearly-graded, radial fuel thickness profile is preferred to the arched profile currently used in HEU fuel because the LEU fuel media is a metal alloy foil rather than a powder. Developments in analysis capability and nuclear data processing techniques are underway with the goal of verifying the preliminary calculations of LEU flux performance. A conceptual study of the operational cost of an LEU fuel fabrication facility yielded the conclusion that the annual fuel cost to the HFIR would increase significantly from the current, HEU fuel cycle. Though manufacturing can be accomplished with existing technology, several engineering proof-of-principle tests would be required. The RERTR program is currently conducting a series of generic fuel qualification tests at the Advanced Test Reactor. A review of these tests and a review of the safety basis for the current, HEU fuel cycle led to the identification of a set of HFIR-specific fuel qualification tests. Much additional study is required to formulate a HFIR-specific fuel qualification plan from this set. However, one such test - creating a graded fuel profile across a flat foil - has been initiated with promising results.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Windsat Free Flyer using the advanced TIROS-N satellite

The results of this study show the feasibility of carrying a wind measuring lidar on an ATN-derivative free flying spacecraft. The overall configuration fits within the Shuttle bay and uses the same techniques for STS Launch as the proposed SAATN spacecraft. The lidar can be made light enough that the total weight of the satellite is well within the capability of the onboard propulsion system for transfers to a Sun synchronous orbit at 833 km attitude. The principal techniques for weight minimization are the use of the Perkin Elmer proprietary HIP process for the telescope, new packaging concepts for the laser and for the optics-laser interface, and the application of current technology to the signal processing hardware. Power minimization is achieved for the lidar primarily by use of a low pulse repetition frequency, i.e., 2pps, and again by the use of current processor technology. The power capability of the spacecraft is enhanced by increasing the ATN array size 25 percent, through the addition of two more solar array panels of the present size, and by limiting the range of Sun angles over which the spacecraft is operated. The same basic concept for the lidar as proposed in the Shuttle Windsat study is recommended here, but there are some changes in details to improve weight and power. No major technology break-throughs are required for the lidar, but some technology experiments are recommended for the laser subsystem to verify isotopic gas lifetime and performance, modulator life and weight, and for space qualification. Spacecraft changes are all natural modifications or growth to accommodate the payload. Overall, the proposed system provides substantial margin for the uncertainties for the future and for potential payload change, and also demonstrates the reasonableness of the Windsat Free Flyer concept.

Gurk, Herbert M.↗

The Castor 120 (TM) Motor: Development and Qualification Testing Results

This paper discusses Thiokol Corporation's static test results for the development and qualification program of the Castor 120(TM) motor. The demonstration program began with a 25,000-pound motor to demonstrate the new technologies and processes that would be used on the larger Castor 120(TM) motor. The Castor 120(TM) motor was designed to be applicable as a first stage, second stage, or strap-on motor. Static test results from the Castor 25 and two Castor 120(TM) motors are discussed in this paper. The results verified the feasibility of tailoring the propellant grain configuration and nozzle throat diameter to meet various customer requirements. The first and second motors were conditioned successfully at ambient temperature and 28 F, respectively, to demonstrate that the design could handle a wide range of environmental launch conditions. Furthermore, the second Castor 120(TM) motor demonstrated a systems tunnel and forward skirt extension to verify flight-ready stage hardware. It is anticipated that the first flight motor will be ready by the fall of 1994.

Jack G Hilden↗

Development of Sensors for Aerospace Applications

Advances in technology have led to the availability of smaller and more accurate sensors. Computer power to process large amounts of data is no longer the prevailing issue; thus multiple and redundant sensors can be used to obtain more accurate and comprehensive measurements in a space vehicle. The successful integration and commercialization of micro- and nanotechnology for aerospace applications require that a close and interactive relationship be developed between the technology provider and the end user early in the project. Close coordination between the developers and the end users is critical since qualification for flight is time-consuming and expensive. The successful integration of micro- and nanotechnology into space vehicles requires a coordinated effort throughout the design, development, installation, and integration processes

Medelius, Pedro↗

Quantum-Well Infrared Photodetector (QWIP) Focal Plane Assembly

A paper describes the Thermal Infrared Sensor (TIRS), a QWIP-based instrument intended to supplement the Operational Land Imager (OLI) for the Landsat Data Continuity Mission (LDCM). The TIRS instrument is a far-infrared imager operating in the pushbroom mode with two IR channels: 10.8 and 12 microns. The focal plane will contain three 640x512 QWIP arrays mounted on a silicon substrate. The silicon substrate is a custom-fabricated carrier board with a single layer of aluminum interconnects. The general fabrication process starts with a 4-in. (approx.10-cm) diameter silicon wafer. The wafer is oxidized, a single substrate contact is etched, and aluminum is deposited, patterned, and alloyed. This technology development is aimed at incorporating three large-format infrared detecting arrays based on GaAs QWIP technology onto a common focal plane with precision alignment of all three arrays. This focal plane must survive the rigors of flight qualification and operate at a temperature of 43 K (-230 C) for five years while orbiting the Earth. The challenges presented include ensuring thermal compatibility among all the components, designing and building a compact, somewhat modular system and ensuring alignment to very tight levels. The multi-array focal plane integrated onto a single silicon substrate is a new application of both QWIP array development and silicon wafer scale integration. The Invar-based assembly has been tested to ensure thermal reliability.

Jhabvala, Murzy↗

Update on NASA Microelectronics Activities

Mission Statement: The NASA Electronic Parts and Packaging (NEPP) Program provides NASA's leadership for developing and maintaining guidance for the screening, qualification, test. and usage of EEE parts by NASA as well as in collaboration with other government Agencies and industry. NASA Space Technology Mission Directorate (STMD) "STMD rapidly develops, demonstrates, and infuses revolutionary, high-payoff technologies through transparent, collaborative partnerships, expanding the boundaries of the aerospace enterprise." Mission Statement: The Space Environments Testing Management Office (SETMO) will identify, prioritize, and manage a select suite of Agency key capabilities/assets that are deemed to be essential to the future needs of NASA or the nation, including some capabilities that lack an adequate business base over the budget horizon. NESC mission is to perform value-added independent testing, analysis, and assessments of NASA's high-risk projects to ensure safety and mission success. NASA Space Environments and Avionics Fellows as well as Radiation and EEE Parts Community of Practice (CoP) leads.

NASA Electronic Parts and Packaging (NEPP)↗

X-57 Power and Command System Design

This paper describes the power and command system architecture of the X-57 Maxwell flight demonstrator aircraft. The X-57 is an experimental aircraft designed to demonstrate radically improved aircraft efficiency with a 3.5 times aero-propulsive efficiency gain at a "high-speed cruise" flight condition for comparable general aviation aircraft. These gains are enabled by integrating the design of a new, optimized wing and a new electric propulsion system. As a result, the X-57 vehicle takes advantage of the new capabilities afforded by electric motors as primary propulsors. Integrating new technologies into critical systems in experimental aircraft poses unique challenges that require careful design considerations across the entire vehicle system, such as qualification of new propulsors (motors, in the case of the X-57 aircraft), compatibility of existing systems with a new electric power distribution bus, and instrumentation and monitoring of newly qualified propulsion system devices.

electric propulsion↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Qualification of the First ICS-3000 ION Chromatograph for use at the Defense Waste Processing Facility

The ICS-3000 Ion Chromatography (IC) system installed in 221-S M-13 has been qualified for use. The qualification was a head to head comparison of the ICS-3000 with the currently used DX-500 IC system. The crosscheck work included standards for instrument calibration and calibration verifications and standards for individual anion analysis, where the standards were traceable back to the National Institute of Standards and Technology (NIST). In addition the crosscheck work included the analysis of simulated Sludge Receipt Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples, along with radioactive Sludge Batch 5 material from the SRAT and SME tanks. Based upon the successful qualification of the ICS-3000 in M-13, it is recommended that this task proceed in developing the data to qualify, by a head to head comparison of the two ICS-3000 instruments, a second ICS-3000 to be installed in M-14. The Defense Waste Processing Facility (DWPF) requires the analysis of specific anions at various stages of its processing of high level waste (HLW). The anions of interest to the DWPF are fluoride, formate, chloride, nitrite, nitrate, sulfate, oxalate, and phosphate. The anion analysis is used to evaluate process chemistry including formic acid/nitric acid additions to establish optimum conditions for mercury stripping, reduction-oxidation (REDOX) chemistry for the melter, nitrite destruction, organic acid constituents, etc. The DWPF Laboratory (Lab) has been using Dionex DX-500 ion chromatography (IC) systems since 1998. The vendor informed DWPF in 2006 that the instruments would no longer be supported by service contracts after 2008. DWPF purchased three new ICS-3000 systems in September of 2006. The ICS-3000 instruments are (a) designed to be more stable using an eluent generator to make eluent, (b) require virtually no daily chemical handling by the analysts, (c) require less line breaks in the hood, and (d) generally require less maintenance due to the pump configuration only using water versus the current system where the pump uses various hydroxide concentrations. The ICS-3000 instruments also allow the DWPF to maintain current service contracts, which support routine preventive maintenance and emergency support for larger problems such as component failure. One of the three new systems was set up in the DWPF Lab trailers in January of 2007 to be used for the development of methods and procedures. This system will continue to be used for training, new method development and potential improvements to current methods. The qualification of the other two ICS-3000 instruments is to be a phased effort. This effort is to be supported by the Applied Computational Engineering and Statistical (ACES) group of the Savannah River National Laboratory (SRNL) as authorized by the Technical Task Request (TTR) and as directed by the corresponding Task Technical and Quality Assurance (TT&QA) plan. The installation of the first 'rad' system into the M-13 Lab module required modifications to both the Lab module and to the radiohood. The installation was completed in July 2008. The testing of this system was conducted as directed by the TT&QA plan. The purpose of this technical report is to provide a review of the data generated by these tests that will lead to the recommendation for the qualification of the M-13 ICS-3000 instrument. With the successful qualification of this first ICS-3000, plans will be developed for the installation of the second 'rad' system in the M-14 Lab module later in fiscal year 2009. When the second 'rad' ICS-3000 system is installed, the DX-500 systems will be removed and retired from service.

47 OTHER INSTRUMENTATION↗

An integrated approach to examine fuel-cladding chemical interaction in HT9/U-10Zr metallic fast reactor fuels: Coupling machine learning with electron microscopy and local mechanical properties analysis

The metallic U-Zr nuclear fuel alloy has garnered renewed interest as a promising candidate for next-generation sodium-cooled fast reactors. Recent studies and technology assessments have identified several areas requiring improvements, enhanced knowledge, and reliable data to strengthen the U-Zr fuel design basis for qualification and commercial applications. One of the most challenging phenomena impacting this fuel system’s performance is fuel-cladding chemical interaction (FCCI). This work aimed to harvest FCCI data by examining selected HT9/U-10Zr (wt. %) fuel samples of prototypic full-length fuel pins through an integrated approach. This approach integrated scanning electron microscopy (SEM) microstructure characterization with localized mechanical properties examination to deepen understanding of FCCI phenomenon in HT9/U-10Zr fuel system. Particularly, this study focused on MFF fuel pins irradiated at Fast Flux Test Facility (FFTF), which aimed to qualify metallic fuel as a driver fuel for FFTF and to assess its viability for larger-scale fast reactors. Electron microscopy provided high confidence in detecting and distinguishing the different FCCI layers, while small-scale mechanical testing (SSMT) probed the mechanical properties of these layers. SEM examination of a MFF-2 pin 192167, with a time averaged inner cladding temperature (TICT) slightly over 500°C, revealed minimal cladding-side FCCI (cladding wastage). In contrast, significantly thicker cladding wastage comprising two distinct sublayers was observed in samples from the thermally hot MFF-3 pin 193045 and MFF-5 pin 195011 where the TICT ranged from 610-635°C. SSMT indicated complete embrittlement in the sublayer adjacent to the fuel and a tendency toward embrittlement in the other sublayer. Additionally, a new machine learning method was developed, validated, and used to quantify cladding wastage thickness. The machine learning method reliably predicted the wastage thickness across various fuel pins and sample cross-sections. Furthermore, the available cladding wastage data from HT9/U-10Zr fuel system demonstrated a strong temperature dependency. However, the dataset remains small, and ongoing research activities are essential to further understand the FCCI phenomenon and develop a reliable FCCI model for enhanced fuel performance simulation under various conditions.

36 - MATERIALS SCIENCE↗

DDE Design Status Report Nov 2011

The National Nuclear Security Agency Global Threat Reduction Initiative employs the Reduced Enrichment for Research and Test Reactors (RERTR) Fuel Development program to facilitate maturation of Low Enriched Uranium (LEU) fuel technology in order to enable conversion of High Power Research Reactors (HPRR) to LEU fuels. The RERTR Fuel Development program has overseen design, fabrication, irradiation, and examination of numerous tests on small to medium sized specimens containing LEU fuels. To enable the three nearest term HPRR conversions, including the Massachusetts Institutes of Technology Reactor (MITR), University of Missouri Research Reactor (MURR), and National Bureau of Standard Reactor (NBSR), the FD pillar is currently focused on qualification of the 'Base Monolithic Design'. The Base Monolithic Design consists of uranium-10 wt% molybdenum alloy (U-10Mo) in the form of a monolithic foil, with thin zirconium interlayers, clad in aluminum by hot isostatic press. The licensing basis of the aforementioned HPRR's restricts them from testing lead test elements of their respective LEU fuel element designs. In order to provide the equivalent of a lead test assembly, one Design Demonstration Experiment (DDE) is planned for each of the three NRC licensed reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-2 Irradiation Test Final As-Run Report

This document presents the as-run analysis of the AGR-2 irradiation experiment. AGR-2 is the second of the planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the U.S. Department of Energy as part of the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) program. The objectives of the AGR-2 experiment are to: 1. Irradiate UCO (uranium oxycarbide) and UO 2 (uranium dioxide) fuel produced in a large coater. Fuel attributes are based on results obtained from the AGR-1 test and other project activities. 2. Provide irradiated fuel samples for post-irradiation experiment (PIE) and safety testing. 3. Support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. The primary objective of the test was to irradiate both UCO and UO 2 TRISO (tristructural isotropic) fuel produced from prototypic scale equipment to obtain normal operation and accident condition fuel performance data. The UCO compacts were subjected to a range of burnups and temperatures typical of anticipated prismatic reactor service conditions in three capsules. The test train also includes compacts containing UO 2 particles produced independently by the United States, South Africa, and France in three separate capsules. The range of burnups and temperatures in these capsules were typical of anticipated pebble bed reactor service conditions. The results discussed in this report pertain only to U.S.-produced fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE-EM/HBCU Projects for Environmental Management Research and Workshop Development at SCSU [Conference Papers/Proceedings]. Final Report

The Department of Energy’s Office of Environmental Management (DOE-EM) established a Memorandum of Understanding (MOU) with nine HBCUs in South Carolina and Northeast Georgia. The nine HBCUs (Allen University, Benedict College, Claflin University, Clinton Junior College, Demark Technical College, Morris College, South Carolina State University, Voorhees College and Paine College of Northeast Georgia) have formulated a consortium to address the technical and workforce development needs of the DOE’s Office of Environmental Management. These institutions have the qualifications and expertise to provide the technical cooperation and operations support in the areas of environmental remediation, nuclear regulatory and transportation safety, modeling, technology transfer and workforce development. Several of the HBCUs have received awards from the DOE to address issues related to ground water, surface water, plant communities, the development of an interdisciplinary waste management institute, and the establishment of an environmental science field station. Also, the acquisition of these grant awards have afforded the participating institutions with the ability to instruct students by providing them with the appropriate skill sets to address the future employment needs of DOE to include: Hands-on field experiences; Classroom demonstrations; and, Research and education experiences. South Carolina State University will build upon its existing relationships with DOE-EM by creating a "pipeline" for minorities in Mathematics, Science & Technology, Engineering, Research, and other related fields. Students will be specifically trained and mentored to enter the DOE workforce in these technical areas of need. The integration of technology in research and education is essential for meeting the demanding need to develop a workable mechanism to optimize the effectiveness of research and education in this nation. This is extremely critical in this age of unprecedented technological advances when information delivery, training, and continuous research to improve performance and skill enhancement hold the key to competition. This development relies on a program of applied science to identify and help implement the technologies, as well as programs that energize and mentor the next generation of scientists and engineers. To foster these goals, SCSU proposes research and educational projects that will support the integration of technology in research and education.

54 ENVIRONMENTAL SCIENCES↗

Confirmatory LBL Analysis of AGR-5/6/7 Compacts and Over-Coated Particles BWXT Batches 11034, 14154C, 14156C, AND 14156D

Fuel for the Advanced Gas Reactor Fuel Development and Qualification (AGR) Program’s AGR-5/6/7 irradiation test in the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) was produced by BWX Technologies (BWXT) Nuclear Operations Group in Lynchburg, Virginia. Tristructural isotropic (TRISO) coatings were deposited using a 150-mm-diameter production-scale fluidized-bed chemical vapor deposition (CVD) furnace on 425-μm-nominal-diameter spherical kernels from Lot J52R-16-69317 containing a mixture of 15.5% 235U low-enriched uranium carbide and uranium oxide (UCO). The TRISO coatings consisted of four consecutive CVD layers: a ~50% dense carbon buffer layer with 100-μmnominal thickness, a dense inner pyrolytic carbon (IPyC) layer with 40-μm-nominal thickness, a silicon carbide (SiC) layer with 35-μm-nominal thickness, and a dense outer pyrolytic carbon (OPyC) layer with 40-μm-nominal thickness. TRISO-coated particle Lot J52R-16-98005 was over-coated with a graphite/resin blend and these over-coated particles were pressed in half-inch-diameter, one-inch-long cylindrical compacts. Two packing fractions (PF) were produced, 40%PF and 25%PF, where the TRISO particle volume made up approximately 40% and 25% of the total compact volume, respectively. The AGR-5/6/7 Fuel Specification, SPC-1352 [Marshall 2016], provides the requirements necessary for acceptance of the fuel manufactured for the AGR-5/6/7 irradiation test. Quality control (QC) acceptance testing for all AGR-5/6/7 composited lots and single batches was performed by BWXT, with the exception of pyrolytic carbon (PyC) anisotropy and defective IPyC fraction in the TRISO candidate batches and final composite, which were measured at the Oak Ridge National Laboratory (ORNL) and reported in ORNL/TM-2017/036 [Hunn et al. 2017] and ORNL/TM-2017/037 [Helmreich et al. 2017a].

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗