Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Human Mars Mission Performance Crew Taxi Profile

Using the results from Integrated Mission Program (IMP), a simulation language and code used to model present and future Earth Moon, or Mars missions, this report presents six different case studies of a manned Mars mission. The mission profiles, timelines, propellant requirements, feasibility and perturbation analysis is presented for two aborted, two delayed rendezvous, and two normal rendezvous cases for a future Mars mission.

Duaro, Vince A.↗

STS-99 Countdown Status Briefing

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. This tape presents a pre-launch briefing for the press held on Feb 8, 2000. Statements were given by Doug Lyons, Shuttle Test Director; Scott Higginbotham, STS-99 Payload Director and Ed Priselac, Shuttle Weather Officer. Mr. Lyons reported on the replacement of the Master Control Unit on board Endeavour, the part that had caused a delay in the launch. He reviewed the work that had to be done and the timeline for completion. Scott Higginbotham reported that there were no problems with the SRTM. Ed Priselac reported on favorable weather conditions for the launch. Discussion after the statements concerned a possible problem with a cable, and the possibility of a further delay to the launch.

Source record↗

We Must Take the Next Steps Towards Safe, Routine Space Travel

This paper presents, in viewgraph form, six in a half generations of airplanes in a century. Some of the topics include: 1) Enterprise goals; 2) Generations of Reusable Launch Vehicles; 3) Space Transportation Across NASA; 4) Three Tiered Implementation Approach for Future Space Transportation Technology; 5) Develop a Comprehensive, Agency Level Space Transportation Plan That Will Enable NASA's Strategic Plan; 6) Timeline for Addressing NASA's Needs; 7) Significant 2nd Generation Technology Drivers; 8) Example Large Scale Ground Demonstrations; and 9) Example Pathfinder Demonstrations. The paper also includes various aircraft designs and propulsion system technology.

Lyles, G. M.↗

Design, Development, And Testing of Umbilical System Mechanisms for the X-33 Advanced Technology Demonstrator

The X-33 Advanced Technology Demonstrator is an un-piloted, vertical take-off, horizontal landing spacecraft. The purpose of the X-33 program is to demonstrate technologies that will dramatically lower the cost of access to space. The rocket-powered X-33 will reach an altitude of up to 100 km and speeds between Mach 13 and 15. Fifteen flight tests are planned, beginning in 2000. Some of the key technologies demonstrated will be the linear aerospike engine, improved thermal protection systems, composite fuel tanks and reduced operational timelines. The X-33 vehicle umbilical connections provide monitoring, power, cooling, purge, and fueling capability during horizontal processing and vertical launch operations. Two "rise-off" umbilicals for the X-33 have been developed, tested, and installed. The X-33 umbilical systems mechanisms incorporate several unique design features to simplify horizontal operations and provide reliable disconnect during launch.

Littlefield, Alan C.↗

Maneuver Design and Calibration for the Genesis Spacecraft

Genesis is the fifth mission selected as part of NASA's Discovery Program. The objective of Genesis is to collect solar wind samples for a period of approximately two years while in a halo orbit about the Earth-Sun L I point. At the end of this period, the samples are to be returned to a specific recovery point on the Earth for subsequent analysis. This goal has never been attempted before and presents a formidable challenge in terms of mission design and operations, particularly planning and execution of propulsive maneuvers. To achieve a level of cost-effectiveness consistent with a Discovery-class mission, the Genesis spacecraft design was adapted to the maximum extent possible from designs used on earlier missions, such as Mars Global Surveyor (MGS) and Stardust, another sample collection mission. The spacecraft design for Genesis is shown. Spin stabilization was chosen for attitude control, in lieu of three-axis stabilization, with neither reaction wheels nor accelerometers included. This precludes closed-loop control of propulsive maneuvers and implies that any attitude changes, including spin changes and precessions, will behave like translational propulsive maneuvers and affect the spacecraft trajectory. Moreover, to minimize contamination risk to the samples collected, all thrusters were placed on the side opposite the sample collection canister. The orientation and characteristics of thrusters are indicated. For large maneuvers (>2.5 m/s), two 5 lbf thrusters will be used for delta v, with precession to the burn attitude, followed by spin-up from 1.6 to 10 rpm before the burn and spin down to 1.6 rpm afterwards, then precession back to the original spin attitude. For small maneuvers (<2.5 m/s), no spin change is needed and four 0.2 lbf thrusters are used for Av. Single or double 360 deg. precession changes are required whenever the desired delta v falls inside the two-way turn circle (about 0.4 m/s) based on the mass properties, spin rate and lever arm lengths based on thruster locations. In such instances, delta v resulting from spacecraft precession cannot be used effectively as a component of the desired delta v, and must therefore be removed by precessing at least one complete revolution around the turn circle. To eliminate cross-track execution errors, a second revolution in the opposite direction would also be performed. This paper will address the design of propulsive maneuvers in light of the aforementioned challenges and other constraints. Maneuver design will be performed jointly by the Navigation Team at JPL and the Spacecraft Team at LMA, based on the process indicated . Typical maneuver timelines will be presented which address considerations introduced by attitude changes. These include nutation, which is introduced by precessing or spinning down and must be given sufficient time to damp out prior to execution of subsequent events, as well as sun and earth pointing constraints, which must be considered to ensure sufficient spacecraft power and to minimize telecommunications interruptions, respectively. The paper will include a description of how individual propulsive maneuvers are resolved into components to account for delta v from translational burns and spacecraft attitude changes required to carry out such maneuvers. Contributions to maneuver delta v arising from attitude changes, based on mass properties for the period just after launch, are indicated. Similar curves will be presented spanning all mission phases from launch through return. A set of closed-form equations for resolving maneuver components, base on a specific delta v required for correction or deterministic changes to the spacecraft trajectory will be presented, as well. In addition to nominal maneuvers, special calibration maneuvers are planned to improve open-loop modeling of maneuvers and to reduce execution errors. Uncalibrated execution errors are indicated. Such errors could be reduced by 50% or more over the course of the mission. Special calibrations are of particular importance for the return leg of the mission, since the sample canister must be returned to a specific location within the Utah Test and Training Range (UTTR) for mid-air retrieval. An entry angle tolerance of no less than +/- 0.08 deg. is required to achieve this objective. Biasing of the final return maneuvers coupled with a specific maneuver mode to use a series of well-characterized spin changes to effect these maneuvers is part of the current Genesis baseline mission plan. Another important objective of calibrations is to better characterize precession maneuvers. Such maneuvers are part of most propulsive maneuvers, but are also required periodically to maintain sun-pointing for power or daily during solar-wind pointing during collection periods. Although relatively small, such maneuvers will have a significant cumulative impact on orbit determination, particularly in the halo portion of the mission. The current mission design also calls for three stationkeeping maneuvers during each halo orbit of approximately six months duration. These stationkeeping maneuvers may be sufficiently small that single or double 360 deg. precession changes may be required. Because there are no accelerometers on board the spacecraft, calibration can only be performed with the aid of ground-based radiometric tracking. To establish a high degree of accuracy in characterizing the magnitude of burns, the spacecraft spin axis should be along the line of sight to the Earth, providing Doppler measurements with <1 mm/sec accuracy in S-Band. Emission constraints allow such alignment only during certain portions of the mission when the Earth-spacecraft-sun geometry is favorable. The impact of precessions, or burns at times when geometry is not favorable, can be assessed by reconstruction of the spacecraft trajectory using tracking arcs of several days before and after the event.

Williams, Kenneth E.↗

Reinventing The Design Process: Teams and Models

The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.

Wall, Stephen D.↗

Mars Observer Lecture: Mars Orbit Insertion

The Mars Observer mission spacecraft was primarily designed for exploring Mars and the Martian environment. The Mars Observer was launched on September 25, 1992. The spacecraft was lost in the vicinity of Mars on August 21, 1993 when the spacecraft began its maneuvering sequence for Martian orbital insertion. This videotape shows a lecture by Suzanne R. Dodd, the Mission Planning Team Chief for the Mars Observer Project. Ms Dodd begins with a brief overview of the mission and the timeline from the launch to orbital insertion. Ms Dodd then reviews slides showing the trajectory of the spacecraft on its trip to Mars. Slides of the spacecraft being constructed are also shown. She then discusses the Mars orbit insertion and the events that will occur to move the spacecraft from the capture orbit into a mapping orbit. During the trip to Mars, scientists at JPL had devised a new strategy, called Power In that would allow for an earlier insertion into the mapping orbit. The talk summarizes this strategy, showing on a slide the planned transition orbits. There are shots of the Martian moon, Phobos, taken from the Viking spacecraft, as Ms Dodd explains that the trajectory will allow the orbiter to make new observations of that moon. She also explains the required steps to prepare for mapping after the spacecraft has achieved the mapping orbit around Mars. The lecture ends with a picture of Mars from the Observer on its approach to the planet.

Dodd, Suzanne R.↗

Clock Technology Development in the Laser Cooling and Atomic Physics (LCAP) Program

This paper presents the Laser Cooling and Atomic Physics (LCAP) program. It focuses on clock technology development. The topics include: 1) Overview of LCAP Flight Projects; 2) Space Clock 101; 3) Physics with Clocks in microgravity; 4) Space Clock Challenges; 5) LCAP Timeline; 6) International Space Station (ISS) Science Platforms; 7) ISS Express Rack; 8) Space Qualification of Components; 9) Laser Configuration; 10) Clock Rate Comparisons: GPS Carrier Phase Frequency Transfer; and 11) ISS Model Views. This paper is presented in viewgraph form.

Seidel, Dave↗

Evaluation of Hardware and Procedures for Astronaut Assembly and Repair of Large Precision Reflectors

A detailed procedure is presented that enables astronauts in extravehicular activity (EVA) to efficiently assemble and repair large (i.e., greater than 10m-diameter) segmented reflectors, supported by a truss, for space-based optical or radio-frequency science instruments. The procedure, estimated timelines, and reflector hardware performance are verified in simulated 0-g (neutral buoyancy) assembly tests of a 14m-diameter, offset-focus, reflector test article. The test article includes a near-flight-quality, 315-member, doubly curved support truss and 7 mockup reflector panels (roughly 2m in diameter) representing a portion of the 37 total panels needed to fully populate the reflector. Data from the tests indicate that a flight version of the design (including all reflector panels) could be assembled in less than 5 hours - less than the 6 hours normally permitted for a single EVA. This assembly rate essentially matches pre-test predictions that were based on a vast amount of historical data on EVA assembly of structures produced by NASA Langley Research Center. Furthermore, procedures and a tool for the removal and replacement of a damaged reflector panel were evaluated, and it was shown that EVA repair of this type of reflector is feasible with the use of appropriate EVA crew aids.

Lake, Mark S.↗

Design of a 2-Hour Prebreathe Protocol for Space Walks (EVAs) from the International Space Station (ISS)

The majority of extravehicular activities (EVAs) performed from the shuttle use a 10.2 psi staged decompression. The International Space Station (ISS) will operate at 14.7 psi, requiring crews to "campout" in the airlock at 10.2 psi. The constraints associated with campout (crew isolation, oxygen usage, and waste management), provided the rationale to develop a 2-hour prebreathe protocol from 14.7 psi. Previous studies on the affect of microgravity and exercise during prebreathe suggested the feasibility of this approach. Various combinations of adynamia (nonwalking subjects), prebreathe exercise doses, and space suit donning options (10.2 vs. 14.7 psi) were analyzed against timeline and consumable constraints. Prospective decompression sickness (DCS) and venous gas emboli (VGE) accept/reject criteria were defined from statistical analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept / reject limits were adjusted for greater safety (including Grade IV VGE criteria) based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center laboratory trial, including the capability of rejecting the primary protocol and testing at least one alternate exercise dose, within the 2-hour prebreathe. The 2-hour protocol incorporates 0, breathing for 5 0 min at 14.7 psi, including 10 min dual cycle ergometry at 75%VO(2max). It requires an additional 30 minO2breathing during depress from 14.7 to 10.2 psi, followed by a 30-60 min suit donning break at 10.2 psi/26.5% O2. It concludes with a 40 min in-suit O2 prebreathe. The protocol would be accepted for operations, if the incidence of DCS was less than 15% and Grade IV VGE less than 20%, both at 95% confidence. The above protocol and accept/reject limits were implemented in a multi-center study.

Gernhardt, M. L.↗

Design and Testing of a 2-Hour Oxygen Prebreathe Protocol for Space Walks from the International Space Station

To develop and test a 2-hour prebreathe protocol for performing extravehicular activities (EVAs) from the International Space Station (ISS). Combinations of adynamia (non-walking), prebreathe exercise, and space suit donning options (10.2 vs. 14.7 psi) were evaluated, against timeline and consumable contraints to develop an operational 2- hour prebreathe protocol. Prospective accept/reject criteria were defined for decompression sickness (DCS) and venous gas emboli (VGE) from analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew-members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept/reject limits were adjusted for greater safety based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center human trial. Protocols were tested with 4 different prebreathe exercises (Phases I-IV), prior to exposure to 4.3 psi for 4 hrs. Subject selection, Doppler monitoring for VGE, test termination criteria, and DCS definitions were standardized. Phase I: upper and lower body exercises using dual-cycle ergometry (75% VO2 max for 10 min). Phase II: ergometry plus 24 min of light exercise (simulating space-suit preparations). Phase III: same 24 min of light exercise but no ergometry, and Phase IV: 56 min of light exercise without ergometry. A prebreathe procedure was accepted if, at 95% confidence, the incidence of DCS was less than 15% (with no Type II DCS), and Grade IV VGE was less than 20%.

Gernhardt, Michael L.↗

STS-47 Mission Overview

Flight Director Milt Heflin gives an overview of the goals of the Space Shuttle Endeavour. He describes the crew, the role of the orbiter, the planned experiments, and the timeline of activities on board. Mission Manager Aubray King introduces the Spacelab-J mission. He discusses the planned experiments and Japanese involvement in development. Heflin and King then take questions from the press.

Source record↗

Advanced Technology Initiatives Program Project Updates

Four Airborne Telemetry Instrumentation Package (ATIP) technology development efforts were recently begun at Goddard Space Flight Center (GSFC) in areas related to soil moisture mission concepts. These are in the areas of low-mass low-power receiver modules, on-orbit calibration, and digital correlators. The relevance to enabling soil moisture missions will be discussed, along with expected products and timelines for each project.

Kim, E.↗

International Space Station Evolution Data Book: Baseline Design - Volume 1

The International Space Station (ISS) will provide an Earth-orbiting facility that will accommodate engineering experiments as well as research in a microgravity environment for life and natural sciences. The ISS will distribute resource utilities and support permanent human habitation for conducting this research and experimentation in a safe and habitable environment. The objectives of the ISS program are to develop a world-class, international orbiting laboratory for conducting high-value scientific research for the benefit of humans on Earth; to provide access to the microgravity environment; to develop the ability to live and work in space for extended periods; and to provide a research test bed for developing advanced technology for human and robotic exploration of space. The current design and development of the ISS has been achieved through the outstanding efforts of many talented engineers, designers, technicians, and support personnel who have dedicated their time and hard work to producing a state-of-the-art Space Station. Despite these efforts, the current design of the ISS has limitations that have resulted from cost and technology issues. Regardless, the ISS must evolve during its operational lifetime to respond to changing user needs and long-term national and international goals. As technologies develop and user needs change, the ISS will be modified to meet these demands. The design and development of these modifications should begin now to prevent a significant lapse in time between the baseline design and the realization of future opportunities. For this effort to begin, an understanding of the baseline systems and current available opportunities for utilization needs to be achieved. Volume I of this document provides the consolidated overview of the ISS baseline systems. It also provides information on the current facilities available for pressurized and unpressurized payloads. Information on current plans for crew availability and utilization; resource timelines and margin summaries including power, thermal, and storage volumes; and an overview of the ISS cargo traffic and the vehicle traffic model is also included.

Jorgensen, Catherine A.↗

International Space Station Evolution Data Book: Evolution Concepts - Volume 2

This report provides a focused and in-depth look at the opportunities and drivers for the enhancement and evolution of the International Space Station (ISS) during assembly and beyond the assembly complete stage. These enhancements would expand and improve the current baseline capabilities of the ISS and help to facilitate the commercialization of the ISS by the private sector. Volume 1 provides the consolidated overview of the ISS baseline systems; information on the current facilities available for pressurized and unpressurized payloads; and information on current plans for crew availability and utilization, resource timelines and margin summaries including power, thermal, and storage volumes; and an overview of the vehicle traffic model. Volume 2 includes discussions of advanced technologies being investigated for use on the ISS and potential commercial utilization activities being examined including proposed design reference missions (DRM's) and the technologies being assessed by the Pre-planned Program Improvement (P(sup 3) I) Working Group. This information is very high level and does not provide the relevant information necessary for detailed design efforts. This document is meant to educate readers on the ISS and to stimulate the generation of ideas for enhancement and utilization of the ISS, either by or for the government, academia, and commercial industry.

Jorgensen, Catherine A.↗

Apollo by the Numbers: A Statistical Reference

The purpose of this work is to provide researchers, students, and space enthusiasts with a comprehensive reference for facts about Project Apollo, America's effort to put humans in the Moon. Research for this work started in 1988, when the author discovered that, despite the number of excellent books that focused on the drama of events that highlighted Apollo, there were none that focused on the drama of the numbers. This book is separated into two parts. The first part contains narratives for the Apollo 1 fire and the 11 flown Apollo missions. Included after each narrative is a series of data tables, followed by a comprehensive timeline of events from just before liftoff to just after crew and spacecraft recovery. The second part contains more than 50 tables. These tables organize much of the data from the narratives in one place so they can be compared among all missions. The tables offer additional data as well. The reader can select a specific mission narrative or specific data table by consulting the Table of Contents.

Orloff, Richard↗

Robotic Precursor Missions for Mars Habitats

Infrastructure support for robotic colonies, manned Mars habitat, and/or robotic exploration of planetary surfaces will need to rely on the field deployment of multiple robust robots. This support includes such tasks as the deployment and servicing of power systems and ISRU generators, construction of beaconed roadways, and the site preparation and deployment of manned habitat modules. The current level of autonomy of planetary rovers such as Sojourner will need to be greatly enhanced for these types of operations. In addition, single robotic platforms will not be capable of complicated construction scenarios. Precursor robotic missions to Mars that involve teams of multiple cooperating robots to accomplish some of these tasks is a cost effective solution to the possible long timeline necessary for the deployment of a manned habitat. Ongoing work at JPL under the Mars Outpost Program in the area of robot colonies is investigating many of the technology developments necessary for such an ambitious undertaking. Some of the issues that are being addressed include behavior-based control systems for multiple cooperating robots (CAMPOUT), development of autonomous robotic systems for the rescue/repair of trapped or disabled robots, and the design and development of robotic platforms for construction tasks such as material transport and surface clearing.

Huntsberger, Terry↗

STS-102 Expedition 2 Increment and Science Briefing

Merri Sanchez, Expedition 2 Increment Manager, John Uri, Increment Scientist, and Lybrease Woodard, Lead Payload Operations Director, give an overview of the upcoming activities and objectives of the Expedition 2's (E2's) mission in this prelaunch press conference. Ms. Sanchez describes the crew rotation of Expedition 1 to E2, the timeline E2 will follow during their stay on the International Space Station (ISS), and the various flights going to the ISS and what each will bring to ISS. Mr. Uri gives details on the on-board experiments that will take place on the ISS in the fields of microgravity research, commercial, earth, life, and space sciences (such as radiation characterization, H-reflex, colloids formation and interaction, protein crystal growth, plant growth, fermentation in microgravity, etc.). He also gives details on the scientific facilities to be used (laboratory racks and equipment such as the human torso facsimile or 'phantom torso'). Ms. Woodard gives an overview of Marshall Flight Center's role in the mission. Computerized simulations show the installation of the Space Station Remote Manipulator System (SSRMS) onto the ISS and the installation of the airlock using SSRMS. Live footage shows the interior of the ISS, including crew living quarters, the Progress Module, and the Destiny Laboratory. The three then answer questions from the press.

Source record↗