Search NASA⌕ Search

SEARCH · Search NASA

Results for “Titan Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Elements of cost comparison for planetary missions with advanced propulsion

Cost and performance comparisons are made between chemical propulsion and nuclear electric propulsion for planetary missions at Jupiter and beyond. Nuclear rocket comparisons are made for performance only. Titan, Saturn, and space shuttle launch are evaluated, utilizing advanced propulsion upper stages. Appendixes include a performance analysis of multiple shuttle launches, with assembly in earth orbit, and a discussion of nonrecurring costs.

Stearns, J. W.↗

Next generation: Unmanned launch vehicles and upper stages: The needs

The focus is on common vehicle elements, higher mission success, and lower transportation cost with respect to the common needs of the Department of Defense, NASA, and U.S. Industry. The following are presented in viewgraph form: (1) perspectives on mission costs and failures; (2) the recurring costs of the Delta 7925, Atlas/Centar, Titan 3, and Titan 4; (3) U.S. launches from 1957-1987 of Vanguard, Jupiter, Thor/Delta, Juno, Atlas, Scout, Redstone, Saturn, Titan, and the Space Transportation System; and (4) subsystem sources of failure. The following topics are also briefly presented: (1) engine costs; (2) a summary of flight experience; (3) recommendations for next generation space transportation; (4) low cost engine demonstration; and (5) the next generation commercial expendable launch vehicle (ELV) needs estimate.

Gunn, Charles R.↗

3D Simulations of Comet Impacts into the Atmospheres of Titan and Venus

We present results of three-dimensional numerical hydrodynamical calculations of the impacts of comets into the atmosphere of Titan. Our goal is to develop formulae that may be used to predict the sizes and distributions of craters that are expected to exist on Titan's surface and be found by the Huygens probe of the Cassini mission that will arrive at the Saturn system in 2004. We also compare our results with similar calculations done by us for asteroid impacts into the atmosphere of Venus

Korycansky, D. G.↗

Performance of the Dragonfly Mass Spectrometer (DraMS) Programmable UV Laser Source Engineering Test Unit (ETU)

NASA’s Dragonfly mission will sample surface materials from multiple sites on Saturn’s largest moon, Titan, in exploration of its potential for prebiotic chemistry. We report on the performance of our short-pulsed UV laser transmitter, developed for the Dragonfly’s on-board Mass Spectrometer (DraMS). Our engineering test unit (ETU) has completed flight qualification and demonstrated its operational science requirements, such that the final flight unit build can begin. The Titan Hydrocarbon Analysis Nanosecond Optical Source (THANOS) ETU laser produces 266 nm laser pulses at programmable energy levels in order to create high resolution laser desorption mass spectrometry (LDMS) measurements. The laser operates in short bursts of 1-50 pulses, each at < 2 ns pulse width, at a 100 Hz repetition rate. Creating a sealed Titanium unit, capable of operation on the extreme environment of Titan’s surface was a major engineering challenge. The laser successfully demonstrated its ability to meet all operational requirements in terms of pulse energy, beam pointing on target and repeatability even after extensive environmental testing.

Matthew W Mullin↗

Performance of the Dragonfly Mass Spectrometer (DraMS) Programmable UV Laser Source Engineering Test Unit (ETU)

NASA’s Dragonfly mission will sample surface materials from multiple sites on Saturn’s largest moon, Titan, in exploration of its potential for prebiotic chemistry. We report on the performance of our short-pulsed UV laser transmitter, developed for the Dragonfly’s on-board Mass Spectrometer (DraMS). Our engineering test unit (ETU) has completed flight qualification and demonstrated its operational science requirements, such that the final flight unit build can begin. The Titan Hydrocarbon Analysis Nanosecond Optical Source (THANOS) ETU laser produces 266 nm laser pulses at programmable energy levels in order to create high resolution laser desorption mass spectrometry (LDMS) measurements. The laser operates in short bursts of 1-50 pulses, each at < 2 ns pulse width, at a 100 Hz repetition rate. Creating a sealed Titanium unit, capable of operation on the extreme environment of Titan’s surface was a major engineering challenge. The laser successfully demonstrated its ability to meet all operational requirements in terms of pulse energy, beam pointing on target and repeatability even after extensive environmental testing.

Matthew Mullin↗

Dragonfly Mission Entry and Descent Modeling and Simulation Overview

Dragonfly is a New Frontiers Program mission, led by The Johns Hopkins Applied Physics Laboratory, that will deliver a rotorcraft lander to Saturn’s moon, Titan. The focus of this work is to analyze the trajectory of the entry vehicle from cruise stage separation until lander separation. This analysis is done by the NASA Langley Research Center Entry, Descent, and Landing team using the Program to Optimize Trajectories II. This paper provides an overview of the current design and the robustness of the overall entry sequence using a Monte Carlo uncertainty analysis. The work presented in this study includes the updated design, models, and analysis completed since the Dragonfly Entry, Descent, and Landing Mission Preliminary Design Review.

Simulation↗

NASA Experience with Pogo in Human Spaceflight Vehicles

An overview of more than 45 years of NASA human spaceflight experience is presented with respect to the thrust axis vibration response of liquid fueled rockets known as pogo. A coupled structure and propulsion system instability, pogo can result in the impairment of the astronaut crew, an unplanned engine shutdown, loss of mission, or structural failure. The NASA history begins with the Gemini Program and adaptation of the USAF Titan II ballistic missile as a spacecraft launch vehicle. It continues with the pogo experienced on several Apollo-Saturn flights in both the first and second stages of flight. The defining moment for NASA s subsequent treatment of pogo occurred with the near failure of the second stage on the ascent of the Apollo 13 mission. Since that time NASA has had a strict "no pogo" philosophy that was applied to the development of the Space Shuttle. The "no pogo" philosophy lead to the first vehicle designed to be pogo-free from the beginning and the first development of an engine with an integral pogo suppression system. Now, more than 30 years later, NASA is developing two new launch vehicles, the Ares I crew launch vehicle propelling the Orion crew excursion vehicle, and the Ares V cargo launch vehicle. A new generation of engineers must again exercise NASA s system engineering method for pogo mitigation during design, development and verification.

Larsen, Curtis E.↗

The Science Goals of NASA's Exploration Initiative

The recently released policy directive, "A Renewed Spirit of Discovery: The President's Vision for U. S. Space Exploration," seeks to advance the U. S. scientific, security and economic interest through a program of space exploration which will robotically explore the solar system and extend human presence to the Moon, Mars and beyond. NASA's implementation of this vision will be guided by compelling questions of scientific and societal importance, including the origin of our Solar System and the search for life beyond Earth. The Exploration Roadmap identifies four key targets: the Moon, Mars, the outer Solar System, and extra-solar planets. First, a lunar investigation will set up exploration test beds, search for resources, and study the geological record of the early Solar System. Human missions to the Moon will serve as precursors for human missions to Mars and other destinations, but will also be driven by their support for furthering science. The second key target is the search for past and present water and life on Mars. Following on from discoveries by Spirit and Opportunity, by the end of the decade there will have been an additional rover, a lander and two orbiters studying Mars. These will set the stage for a sample return mission in 2013, increasingly complex robotic investigations, and an eventual human landing. The third key target is the study of underground oceans, biological chemistry, and their potential for life in the outer Solar System. Beginning with the arrival of Cassini at Saturn in July 2004 and a landing on Titan in 2006, the next decade will see an extended investigation of the Jupiter icy moons by a mission making use of Project Prometheus, a program to develop space nuclear power and nuclear-electric propulsion. Finally, the search for Earth-like planets and life includes a series of telescopic missions designed to find and characterize extra-solar planets and search them for evidence of life. These missions include HST and Spitzer, operating now; Kepler, SIM, JWST, and TPF, currently under development; and the vision missions, Life Finder and Planet Imager, which will possibly be constructed in space by astronauts.

Gardner, Jonathan P.↗

Dragonfly Mission Entry and Descent Modeling and Simulation Overview

Dragonfly is a New Frontiers Program mission, led by The Johns Hopkins Applied Physics Laboratory, that will deliver a rotorcraft lander to Saturn’s moon, Titan. The focus of this work is to analyze the trajectory of the entry vehicle from cruise stage separation until lander separation. This analysis is done by the NASA Langley Research Center Entry, Descent, and Landing team using the Program to Optimize Trajectories II. This paper provides an overview of the current design and the robustness of the overall entry sequence using a Monte Carlo uncertainty analysis. The work presented in this study includes the updated design, models, and analysis completed since the Dragonfly Entry, Descent, and Landing Mission Preliminary Design Review.

Simulation↗

Cassini Solstice Mission Maneuver Experience: Year Three

The Cassini spacecraft is now in its second Saturn tour extension, the Solstice Mission. By emphasizing propellant preservation over minimizing maneuver cycles, the Cassini Project is meeting the challenge of mission completion in 2017. Since June 2012, 18 of 21 maneuvers were performed to closely maintain the prescribed trajectory, saving downstream propellant. These and other maneuvers during the third year of the Solstice Mission (June 2012 to August 2013) are highlighted in this paper: 31 planned maneuvers targeted to 11 Titan flybys and the last planned Rhea encounter. An assessment of the updated maneuver execution-error models will also be presented.

Cassini↗

Low-Cost Approaches to Deep Space Missions

The past decade has brought about a radical transformation in NASA's planetary exploration program. At the beginning of this decade, NASA was focused on the Cassini mission to Saturn. Following on the heels of the successful Voyager and Galileo missions, Cassini represents the culmination of an evolution towards successively larger, more complex, and more expensive spacecraft. The Cassini spacecraft weighs in at over 5 metric tons, and carries an entry probe and a sophisticated suite of sensors supporting 27 different science investigations enabling a comprehensive scientific investigation of Saturn with a single spacecraft. The cost of this spacecraft exceeded $2B, including the cost of the large Titan IV launch vehicle. During Cassini development, NASA realized that it could no longer afford these "flagship" missions, and the agency moved aggressively towards a "faster, better, cheaper" design philosophy of focused science goals and simpler, rapidly-developed spacecraft, allowing much more frequent launches of smaller, lower-cost missions. The Mars Global Surveyor, launched in November 1996, is an example of this new paradigm. Developed in less than 3-years, MGS is only one-fifth the mass of Cassini, and only cost on the order of $220M. The reduced spacecraft mass allows use of the smaller, lower cost Delta launch vehicle. Currently in orbit about Mars, MGS carries a focused suite of six science instruments that are currently returning high-resolution remote sensing of the Martian surface. The future calls for continued even more aggressive mass and cost targets. Examples of these next-generation goals are embodied in the Mars Micromission spacecraft concept, targeted for launch in 2003. With a mass of only 200kg, this lightweight bus can be tailored to carry a variety of payloads to Mars or other inner-planet destinations. The design of the Micromission spacecraft enable them to be launched at extremely low cost as a secondary "piggyback" payload.

Squibb, G. F.↗

Operational thermal control of Cassini Titan flybys

The Cassini spacecraft will fly by Saturn's largest moon, Titan, forty-five times during its science tour. Twenty-five of the flybys will have a relatively low closest approach target altitude in Titan's atmosphere and are of thermal concern. The Thermal Devices Team on the Cassini Project in Mission Operations at the Jet Propulsion Laboratory has designed an operational thermal control strategy for these flybys. The challenge was to provide flyby operational thermal control that enabled science and remained within design limitations and Project constraints.

Cassini aeroheating Titan flyby thermal analysis↗

Adding "Missed" Science to Cassini's Ops Plan

The phenomenal success of the Cassini Mission at Saturn is largely due to flagship instruments, in a target rich environment, for a long period of time, executing almost error free complex mission operations. A smooth transition from cruise operations through the prime science mission and extended science (Equinox) mission culminating in the currently executing Solstice mission has folded in necessary procedural alterations due to improved understanding of the spacecraft, instruments, uplink and planning systems as well as additional science objectives. These have come with the maturation of the mission along with management of workforce reductions. One important set of operational changes has been initiated due to scientific findings highlighting "missed" science opportunities. This is the case for the Titan Meteorology Campaigns and Saturn Storm Watch Campaigns. These observations involve long term monitoring of the atmospheres of Titan and Saturn while the spacecraft and science teams are focused on other high priority targets of opportunity (like Enceladus). Our objective in this paper is to emphasize how a non-invasive strategy to get additional remarkable science was conceived and implemented in a mission with an already well defined operational plan. To illustrate this we will detail Titan Meteorology Campaign and Saturn Storm Watch Campaign integration and implementation strategies as well as the scientific goals and achievements of both.

Roy, Mou↗

Adding "Missed" Science to Cassini's Ops Plan

The phenomenal success of the Cassini Mission at Saturn is largely due to flagship instruments, in a target rich environment, for a long period of time, executing almost error free complex mission operations. A smooth transition from cruise operations through the prime science mission and extended science (Equinox) mission culminating in the currently executing Solstice mission has folded in necessary procedural alterations due to improved understanding of the spacecraft, instruments, uplink and planning systems as well as additional science objectives. These have come with the maturation of the mission along with management of workforce reductions. One important set of operational changes has been initiated due to scientific findings highlighting "missed" science opportunities. This is the case for the Titan Meteorology Campaigns and Saturn Storm Watch Campaigns. These observations involve long term monitoring of the atmospheres of Titan and Saturn while the spacecraft and science teams are focused on other high priority targets of opportunity (like Enceladus). Our objective in this paper is to emphasize how a non-invasive strategy to get additional remarkable science was conceived and implemented in a mission with an already well defined operational plan. To illustrate this we will detail Titan Meteorology Campaign and Saturn Storm Watch Campaign integration and implementation strategies as well as the scientific goals and achievements of both.

Roy, Mou↗

Study of a comet rendezvous mission, volume 1

The feasibility, scientific objectives, modes of exploration and implementation alternatives of a rendezvous mission to Encke's comet in 1984 are considered. Principal emphasis is placed on developing the scientific rationale for such a mission, based on available knowledge and best estimates of this comet's physical characteristics, including current theories of its origin, evolution and composition. Studied are mission profile alternatives, performance tradeoffs, preferred exploration strategy, and a spacecraft design concept capable of performing this mission. The study showed that the major scientific objectives can be met by a Titan IIID/Centaur-launched 17.5 kw solar electric propulsion spacecraft which carries 60 kg of scientific instruments and is capable of extensive maneuvering within the comet envelope to explore the coma, tail and nucleus.

Source record↗

Exploration of Pluto

Two NASA-sponsored cost-constrained mission implementations for the exploration of Pluto are described. One is the Pluto Fast Flyby (PFF) mission, which utilizes an 83 kg spacecraft to be launched in 1998 aboard a Titan IV (Solid Rocket Motor Upgrade)/Centaur) for an about 7-year-long direct trajectory to Pluto, which will carry an integrated CCD-imaging/UV spectrometer, with a possible integrated IR spectrometer. The other is the Pluto-350 spacecraft, weighing about 316 kg, which will carry a broader instrument set, greater redundancy, and which will require greater than 11 year flight time. Pluto-350 will be launched in 2001 aboard a Delta or Atlas, toward earth and Jupiter swingbys to provide the energy to reach Pluto.

Staehle, Robert L.↗