Search NASA⌕ Search

SEARCH · Search NASA

Results for “allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Two phase sampling for wheat acreage estimation

A two-phase Landsat-based sample allocation and wheat proportion estimation method was developed. The technique employs manual, Landsat full frame-based wheat or cultivated land proportion estimates from a large number of segments comprising a first sample phase to optimally allocate a small phase-two sample of computer or manually processed segments. Proportion estimates from each phase are then linked by regression or probability proportional to estimated size estimators to provide wheat proportion estimates and standard errors by reporting unit. Application to the Kansas Southwest CRD (Crop Reporting District) for 1974 produced a wheat acreage estimate for that CRD within 2.42% of the USDA SRS-based estimate using a lower CRD inventory budget than for a simulated reference LACIE (Large Area Crop Inventory Experiment) system.

Thomas, R. W.↗

The 1977 WARC on broadcasting satellites - Spectrum management aspects and implications

Broadcasting satellites are allocated as a primary service in the band 11.7-12.2 GHz (11.7-12.5 GHz in Europe, Africa, and the USSR), but the band is also allocated on a primary basis (equal sharing) to other services - fixed, mobile, broadcasting, and fixed satellite. Presented with these difficult sharing situations, delegates from over 100 countries met at an ITU World Administrative Radio Conference in 1977 to develop a plan for broadcasting satellites. Many nations wanted a plan that would assign to them now, reserved orbital locations and channel asignments for their future use. Other countries wanted a plan adopted now for future broadcasting satellites which assigned specific channels to specific areas on the ground so that they could use the remaining frequencies to provide terrestrial service right away. This paper describes the 'Plan' developed at the conference and points out how the principles of spectrum management were employed. It also discusses the implications for future international management of the spectrum growing out of this meeting.

Gould, R. G.↗

Regimes for the ocean, outer space, and weather

The allocation of resources among users of the oceans, outer space and the weather is discussed. Attention is given to the international management of maritime navigation, the control of fisheries, offshore oil and gas exploitation, mineral exploitation in the deep seabed (especially the mining of manganese nodules), and the regulation of oceanographic studies. The management of outer space is considered, with special reference to remote sensing by satellites, television broadcasting, the technical requirements of maritime satellites, and problems associated with satellite frequency and orbit allocation. Rainmaking and typhoon modification, as well as the distribution of weather modification capabilities in the world, are also mentioned. The United Nations, international agencies and tribunals, and multi- or bilateral agreements are some of the implements suggested for use in the regulation of the oceans, outer space and the weather.

Brown, S.↗

Two phase sampling for wheat acreage estimation

A two phase Landsat-based sample allocation and wheat proportion estimation method was developed. This technique employs manual, Landsat full frame-based wheat or cultivated land proportion estimates from a large number of segments comprising a first sample phase to optimally allocate a smaller phase two sample of computer or manually processed segments. Application to the Kansas Southwest CRD for 1974 produced a wheat acreage estimate for that CRD within 2.42 percent of the USDA SRS-based estimate using a lower CRD inventory budget than for a simulated reference LACIE system. Factor of 2 or greater cost or precision improvements relative to the reference system were obtained

Thomas, R. W.↗

An approach to the multi-axis problem in manual control

The multiaxis control problem is addressed within the context of the optimal pilot model. The problem is developed to provide efficient adaptation of the optimal pilot model to complex aircraft systems and real world, multiaxis tasks. This is accomplished by establishing separability of the longitudinal and lateral control problems subject to the constraints of multiaxis attention and control allocation. Control solution adaptation to the constrained single axis attention allocations is provided by an optimal control frequency response algorithm. An algorithm is developed to solve the multiaxis control problem. The algorithm is then applied to an attitude hold task for a bare airframe fighter aircraft case with interesting multiaxis properties.

Harrington, W. W.↗

Prediction of pilot reserve attention capacity during air-to-air target tracking

Reserve attention capacity of a pilot was calculated using a pilot model that allocates exclusive model attention according to the ranking of task urgency functions whose variables are tracking error and error rate. The modeled task consisted of tracking a maneuvering target aircraft both vertically and horizontally, and when possible, performing a diverting side task which was simulated by the precise positioning of an electrical stylus and modeled as a task of constant urgency in the attention allocation algorithm. The urgency of the single loop vertical task is simply the magnitude of the vertical tracking error, while the multiloop horizontal task requires a nonlinear urgency measure of error and error rate terms. Comparison of model results with flight simulation data verified the computed model statistics of tracking error of both axes, lateral and longitudinal stick amplitude and rate, and side task episodes. Full data for the simulation tracking statistics as well as the explicit equations and structure of the urgency function multiaxis pilot model are presented.

Onstott, E. D.↗

Pricing of NASA Space Shuttle transportation system cargo

A two-part pricing policy is investigated as the most feasible method of pricing the transportation services to be provided by NASA's SSTS. Engineering cost estimates and a deterministic operating cost model generate a data base and develop a procedure for pricing the services of the SSTS. It is expected that the SSTS will have a monopoly on space material processing in areas of crystal growth, glass processing, metallurgical space applications, and biomedical processes using electrophoresis which will require efficient pricing. Pricing problems, the SSTS operating costs based on orbit elevation, number of launch sites, and number of flights, capital costs of the SSTS, research and development costs, allocation of joint transportation costs of the SSTS to a particular space processing activity, and rates for the SSTS are discussed. It is concluded that joint costs for commercial cargoes carried in the SSTS can be most usefully handled by making cost allocations based on proportionate capacity utilization.

Hale, C. W.↗

LACIE sampling design

The sampling design in LACIE consisted of two major components, one for wheat acreage estimation and one for wheat yield prediction. The acreage design was basically a classical survey for which the sampling unit was a 5- by 6-nautical mile segment; however, there were complications caused by measurement errors and loss of data. Yield was predicted by sampling meteorological data from weather stations within a region and then using those data as input to previously fitted regression equations. Wheat production was not estimated directly, but was computed by multiplying yield and acreage estimates. The allocation of samples to countries is discussed as well as the allocation and selection of segments in strata/substrata.

Feiveson, A. H.↗

LACIE area, yield, and production estimate characteristics: U.S.S.R.

No estimates were generated for the U.S.S.R. during LACIE phase 1. Phase 2 effort was limited to two indicator regions: winter wheat areas where 385 segments were allocated, and spring wheat areas with 362 allocated segments. The level of activity for phase 3 was extended to the entire country which automatically increased the segment workload from 747 to 1947 segments. Production, area, and yield estimates, and their accuracy are discussed for phases 2 and 3 with emphasis on scope, sampling strategy, data base, LANDSAT data, yield analysis for winter and spring wheat, area and production analysis for winter and spring wheat, and technical issues and problems.

Hickman, J. R.↗

LACIE area, yield, and production estimate characteristics: Canada

Sampling segment allocation for Canada placed 283 segments within three provinces: Saskatchewan (170), Alberta (75), and Manitoba (38). The data base was comprised of five data sets: allocation, historical, ratio, LANDSAT, and yield. In-season area, yield, and production estimates were generated only during phase 2. These data are presented and analyzed.

Conte, D.↗

Research on the applications of space technology

Communication satellites and technology transfer are discussed in seven individual reports. Topics cover: (1) NASA'S technological alternatives assuming that the orbit-spectrum resource will continue to be allocated to communication satellite service providers at zero price; (2) the economic aspects of orbit-spectrum allocation; (3) the cost structure of local distribution systems for satellite communication; (4) the economic basis for national science and technology policy; (5) the economics of the household economy; (6) government patent policy; and (7) screening and evaluation in information dissemination.

Source record↗

The impact of WARC-79 on space applications

It is pointed out that the decisions of WARC-79 are crucial to the future utility of applications evolving from research and development of space techniques. WARC-79 provided the spectrum allocations and protection which will permit continued development of a broad range of space applications. Space research and earth-exploration satellite services are discussed, taking into account remote sensing, spectrum requirements, implications for designers and regulators, and space research and earth exploration satellite services. Meteorological satellites are considered along with search-and-rescue operations, standard frequency and time satellites, the search for extraterrestrial intelligence, and the solar-power satellite. The WARC rejected a U.S. allocation proposal for the solar-power satellite on the basis that the proposal was premature because spectrum, biological, and ecological impacts have not yet been fully examined.

Kiebler, J. W.↗

PROCRU: A model for analyzing flight crew procedures in approach to landing

A model for the human performance of approach and landing tasks that would provide a means for systematic exploration of questions concerning the impact of procedural and equipment design and the allocation of resources in the cockpit on performance and safety in approach-to-landing is discussed. A system model is needed that accounts for the interactions of crew, procedures, vehicle, approach geometry, and environment. The issues of interest revolve principally around allocation of tasks in the cockpit and crew performance with respect to the cognitive aspects of the tasks. The model must, therefore, deal effectively with information processing and decision-making aspects of human performance.

Baron, S.↗

Distributed processing on the Space Shuttle - A case study

A Power Extension Package (PEP) has been designed to provide additional electrical power and energy during Shuttle sortie missions. The considered investigation was conducted to determine the most suitable allocation of PEP monitoring and control functions between the Orbiter's existing (centralized) Systems Management General Purpose Computer and an embedded PEP processor. PEP monitoring and control functions are examined, and a configuration definition is considered, taking into account the 'functional migration' process, function allocation criteria, and candidate functional configurations. A trade study is conducted, giving attention to an assessment of four candidate configurations. Assessment factors are related to cost, development risk, aspects of reliability and safety, PEP design complexity, PEP/STS integration complexity, flight operations, and launch/landing site operations. A thorough (subjective) assessment of the PEP system life cycle indicates substantial benefits from a distributed processing approach.

Schoonmaker, P. B.↗

A model of human decisionmaking in multiple process monitoring situations

It is proposed that human decisionmaking performance in multiple process monitoring situations can be modeled in terms of the detection of process related events and the allocation of attention among processes once events are felt to have occurred. An elementary pattern recognition technique, discriminant analysis, is used to generate estimates of event occurrence probability. A queueing theory framework is then utilized to incorporate these probabilities as well as other task characteristics into the solution of the attention allocation problem. The performance of the model is compared with that of subjects in two experiments.

Greenstein, J. S.↗

Requirements for a mobile communications satellite system. Volume 1: Executive summary

Three types of satellite-aided mobile communications are considered for users in areas not served by (terrestrial) cellular radio systems. In System 1, mobile units are provided a direct satellite link to a gateway station, which serves as the interface to the terrestrial toll network. In System 2, a terrestrial radio link similar to those in cellular systems connects the mobile unit to a translator station; each translator relays the traffic from mobile units in its vicinity, via satellite, to the regional gateway. It is not feasible for System 2 to provide ubiquitous coverage. Therefore, System 3 is introduced, in which the small percentage of users not within range of a translator are provided a direct satellite link as in System 1. While System 2 can operate with leased satellite capacity, Systems 1 and 3 require a dedicated satellite. A major portion of this study is concerned with the design of a satellite for System 1. A weight limit of 10,000 lbs, corresponding to the projected 1990 STS capability, is imposed on the design. Frequency re-use of the allocated spectrum, through multiple satellite beams, is employed to generate the specified system capacity. Both offset-fed and center-fed reflectors are considered. For an assumed 10-MHz allocation and a population of 350,000 subscribers, a two-satellite system is required. The reflector diameters corresponding to offset-fed and center-fed geometries are 46 m and 62 m, respectively. Thus, large-space-structure technology is inherent to the implementation of System 1. In addition to establishing the technical requirements for the three types of satellite systems, the monthly service charge needed to provide a specified return on invested capital is computed. A net present value analysis is used for this purpose.

Source record↗

Distributed multiport memory architecture

A multiport memory architecture is diclosed for each of a plurality of task centers connected to a command and data bus. Each task center, includes a memory and a plurality of devices which request direct memory access as needed. The memory includes an internal data bus and an internal address bus to which the devices are connected, and direct timing and control logic comprised of a 10-state ring counter for allocating memory devices by enabling AND gates connected to the request signal lines of the devices. The outputs of AND gates connected to the same device are combined by OR gates to form an acknowledgement signal that enables the devices to address the memory during the next clock period. The length of the ring counter may be effectively lengthened to any multiple of ten to allow for more direct memory access intervals in one repetitive sequence. One device is a network bus adapter which serially shifts onto the command and data bus, a data word (8 bits plus control and parity bits) during the next ten direct memory access intervals after it has been granted access. The NBA is therefore allocated only one access in every ten intervals, which is a predetermined interval for all centers. The ring counters of all centers are periodically synchronized by DMA SYNC signal to assure that all NBAs be able to function in synchronism for data transfer from one center to another.

Kohl, W. H.↗