Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

Hydropower Flexibility Framework (Final Technical Report)

The Hydropower Flexibility Framework (HFF) tool focuses on providing the hydropower community with an effective means of assessing optimized hydropower plant outcomes. This tool combines both site specific characteristics, which act to constrain plant operation, and the hydrologic and grid characteristics which drive hydropower plant operation. The hydropower community faces a confluence of factors which drive the importance of developing such a capability, including an aging hydropower fleet subject to a range of modernization opportunities, a large number of hydropower plant relicensing activities which may affect operational requirements, an electrical grid with increasing levels of variable resources which must be balanced to maintain grid stability, and climate change influencing riverine hydrologic patterns outside of design characteristics. With support from the hydropower community, the project team developed the HFF tool and demonstrated the tool through a series of Use Cases. This guidance was developed as a part of the larger HFF tool User’s Manual (see Appendix B), a resource designed to inform other users and to empower community uptake of the tool. The HFF tool, hosted at https://hfftool.com/, was developed with the support of the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). EPRI is currently exploring alternatives to support the continued maintenance and functionally of the online tool.

13 HYDRO ENERGY↗

Enhanced Simulation Tools for Scheduling Solar Plus Storage Power Plants

This is the final technical report for the Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) under the Solar Energy Technology's Office Balance of Systems program, Award Number 38429. This report summarizes the key outputs and findings of the project, which was focused on long-duration energy storage (LDES) and solar. In particular, one of the most significant challenges of maximizing the value of variable solar energy is the timing of charging and discharging stored energy from LDES devices. Power systems often fail to capture the benefits of LDES and can undervalue the role of storage in providing energy arbitrage, reliability support, and resiliency. This project examined those challenges and proposed alternative methodologies that better capture the value that LDES can provide.

14 SOLAR ENERGY↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Contingency Management with Human Autonomy Teaming

Automation is playing an increasingly important role in many operations. It is often cheaper faster and more precise than human operators. However, automation is not perfect. There are many situations in which a human operator must step in. We refer to these instances as contingencies and the act of stepping in contingency management. Here we propose coupling Human Autonomy Teaming (HAT) with contingency management. We describe two aspects to HAT, bi-directional communication, and working agreements (or plays). Bi-directional communication like Crew Resource Management in traditional aviation, allows all parties to contribute to a decision. Working agreements specify roles and responsibilities. Importantly working agreements allow for the possibility of roles and responsibilities changing depending on environmental factors (e.g., situations the automation was not designed for, workload, risk, or trust). This allows for the automation to "automatically" become more autonomous as it becomes more trusted and/or it is updated to deal with a more complete set of possible situations. We present a concrete example using a prototype contingency management station one might find in a future airline operations center. Automation proposes reroutes for aircraft that encounter bad weather or are forced to divert for environmental or systems reasons. If specific conditions are met, these recommendations may be autonomously datalinked to the affected aircraft.

dispatch↗

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast: Preprint

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗