Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

APS Science 2020 (Vol. 2)

The U.S. Department of Energy's Advanced Photn Source (APS) is one of the world’s most productive x-ray light source facilities. Each year, the APS provides high-brightness x-ray beams to a diverse community of more than 5,000 researchers in materials science, chemistry, condensed matter physics, the life and environmental sciences, and applied research. Researchers using the APS produce over 2,000 publications each year detailing impactful discoveries, and solve more vital biological protein structures than users of any other x-ray light source research facility. APS x-rays are ideally suited for explorations of materials and biological structures; elemental distribution; chemical, magnetic, electronic states; and a wide range of technologically important engineering systems from batteries to fuel injector sprays, all of which are the foundations of our nation’s economic, technological, and physical well-being. The APS occupies an 80-acre site on the Argonne campus, about 25 miles from downtown Chicago, Illinois. It shares a site with the Center for Nanoscale Materials and the Advanced Protein Characterization Facility.

01 COAL, LIGNITE, AND PEAT↗

Improving Thermal Management Strategies for Data Centers: A Physical Testbed Incorporating Small Modular Reactor and Microreactor Technology

This study aims to accelerate the demonstration of various thermal management systems for data centers using nuclear-generated heat to enhance energy and grid reliability. Utilizing mobile containerized and stationary test beds at INL's High Performance Computing (HPC) facility, this project integrates with various nuclear-related energy systems testing facilities. Key components include immersion cooling apparatus, absorption chillers, and adjustable thermal management simulators. Tasks involve acquiring necessary hardware, sensors, and cooling apparatus, engaging with data center industry stakeholders, and providing a testing platform for algorithms, models, tools, and software. The objective is to expedite the deployment of nuclear-powered data centers, thereby improving energy reliability and affordability.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Field Validation of a Building Operating System Platform

The U.S General Services Administration's (GSA's) Green Proving Ground program, in partnership with the National Renewable Energy Laboratory. completed a large pilot study of an Energy Management Information Systems (EMIS) with Automated System Optimization (ASO). Four test bed facilities, each with different building characteristics and systems, were chosen for the implementation of cloud-based EMIS with ASO. Depending on functionality, this tool can be extremely effective in energy management and energy optimization in buildings. The capabilities evaluated in the pilot ranged from energy savings and energy consumption predictions to evaluations of user acceptance, operability, and ease of installation. This report presents the methodology, lessons learned and best practices, and deployment recommendations for the GSA's portfolio of commercial office space, comprising more than 8,500 properties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Workflow Submit Nodes as a Service on Leadership Class Systems

DOE scientists, today, have access to high performance computing (HPC) facilities with very powerful systems that enable them to execute their computations faster, more efficiently, and at greater scales than ever before. To further their knowledge and produce new discoveries, scientists rely on workflows - sometimes very complex - that provide them with an easy way to automate, reproduce and verify their computations. However, historically, creating workflow submission environments in large HPC facilities has been cumbersome, requires expertise and many man-hours of effort due to the peculiarities, policies, and the restrictions that these systems present. In this paper we discuss the approach a large DOE facility (OLCF) is taking in order to provide containers as a service to its users. This capability is used to create Pegasus workflow management system submit nodes as a service (WSaaS) at the Oak Ridge Leadership Computing Facilities (OLCF), targeting the Summit supercomputer. This deployment builds upon the Kubernetes/Openshift cluster (Slate) that exists within OLCF’s DMZ and its automation triggers. Additionally, we evaluate our approach’s overhead and effort to deploy the solution as compared to previous solutions, such as setting up a Pegasus submission environment on OLCF’s login nodes or submitting jobs remotely via the rvGAHP.

Papadimitriou, George↗

Human Supervision of Autonomous Vehicle Fleet Operations and Associated Passenger Communications: Preprint

Advances in automated vehicle (AV) technology and expanded operations are rapidly emerging with Automated Mobility District (AMD) deployments in global cities. NLR's AMD research addresses critical elements of human supervision of AV fleet operations and associated passenger communications for vehicles in which no driver or safety attendant is present. Although sufficiently advanced AVs no longer have direct oversight by a driver, fleet management remains staffed with operations personnel at the operations command and control (OCC) facility. This paper examines the functionality of the OCC, drawing comparisons of how automated train control and automated people mover OCCs operate. Within an AMD, the OCC manages various vehicle types, sizes, and operational modes, including on-demand and fixed route service, to facilitate a 'network of networks' for transport within a metropolitan area. The OCC serves as oversight for multiple AV fleets assisting AVs via remote operation of vehicles, communication, and dispatching personnel to resolve problems. The OCC also coordinates system operation, geographically staging vehicles, and managing weather, police, and emergency events. Informed by traffic management center (TMC) strategies using highly integrated software and communications, OCCs facilitate seamless information flows. OCC personnel remotely assist passengers and oversee multi-party operation to ensure safety and security. Although social norms mitigate large-capacity unattended vehicle operations, social interaction in multi-party automated small vehicles has little precedent. This poses a new frontier for society and requires research to effectively understand and manage. Future research will monitor OCC implementations, passenger interfaces, and deployment scaling of initial AMD systems.

33 ADVANCED PROPULSION SYSTEMS↗

Decision-making Framework to Support the End-of-Life Management of High-Activity Radioactive Sources

Sealed radioactive sources are used for an extremely wide range of purposes, including as radiation sources in various nuclear facilities, universities, hospitals, biomedical and industrial applications, as well as for geological prospecting and exploration. The proper management of these sealed radioactive sources once they have reached their end-of-life is still a global challenge. Very few field-tested Mobile Hot Cells (MHC) exist in the world to support the end-of-life management of disused high-activity radioactive sources. One of the critical challenges that a source recovery team encounters on each site is to find adequate space, and access to that space to complete the staging and recapture process with a MHC; this process is tedious, uncertain, and time-consuming. Therefore, it is essential to understand the planning and management of the MHC setup and takedown. Currently, there isn't an single capable planning tool that will provide an effective medium to plan, inform, educate, and communicate knowledge about the environment where the MHC will be deployed. We present a novel approach for the planning and management of the deployment of the MHC to several different sites that relies on technology. Furthermore, this planning tool will support collaboration, promote information sharing, and foster better decision making processes, resulting in a more efficient, and reliable setup and source recovery with the MHC.

61 RADIATION PROTECTION AND DOSIMETRY↗

Presentation on the INL Remote-Handled Low-Level Waste Disposal Facility FY-2023 Annual Summary Report

The abstract below is from the report INL/RPT-24-76103. The powerpoint presentation contains information taken from the report. This Fiscal Year (FY) 2023 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical basis documents for the Remote Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2023, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. Sixteen total waste-canister shipments were received at the RHLLW Disposal Facility, and 15 total waste canisters were emplaced.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada, Revision 2

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102), which are currently in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) stage of the Federal Facility Agreement and Consent Order (FFACO) UGTA Strategy. The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in the Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan (DOE/EMNV, 2024a). The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b).

54 ENVIRONMENTAL SCIENCES↗

RAMM-TM for detection of gas leakage from canisters containing spent nuclear fuel

Remote Area Modular Monitoring (RAMM) for canister surface temperature measurement (TM), or RAMM-TM, is a novel remote monitoring device for detection of gas leakage based on surface temperature measurements of canisters containing spent nuclear fuel. Here we describe the development of RAMM-TM, as is the demonstration of its performance in detecting canister gas leakage from a small, simulated chloride-induced stress corrosion crack in experiments using a 1/4.5-scale model cask. Both helium and air gas leakage from a canister were detected within hours after the start of the leakage. The change in surface temperatures at the top and bottom of the canister (ΔTBT) during gas leakage (depressurization) triggered automatic alarms, providing a sound basis for early detection of gas leakage from the canister. This methodology would allow consequence management through the implementation of mitigatory actions to continue effective aging management and to reduce risks to public safety, health, and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The dissolution of simulant vitrified intermediate level nuclear waste in young cement water

Abstract It is pertinent to the safety case for geological disposal in the UK that the behaviour of vitrified wastes in proximity to cementitious materials is understood. In this study, vitrified simulant intermediate level nuclear waste (ILW) was subject to dissolution in a synthetic cement water solution to simulate disposal conditions. Results show that the presence of alkali / alkaline earth elements in the cementitious solution can be favourable, at least in the short-term, leading to lower dissolution rates associated with incorporation of these elements into the altered layer of the glass.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Requirements for Cataloging Hanford Geophysical Datasets

Environmental management activities at the Hanford Site produce extensive data about site conditions, contaminants, cleanup, and more. Managing and archiving that data requires a high degree of collaboration among site contractors and a high level of awareness by project managers and staff. Part of that effort is developing a Hanford Environmental Information and Data Index (HEIDI) to organize the data and maximize its value by making it findable and available for reuse. The objective is to catalog the disparate data sets collected to address the evolving needs of planning, executing, and documenting cleanup over several decades up to the present day, including links to active data sources when available. A properly implemented data catalog makes finding environmental datasets related to an area or theme a routine, reliable process, without requiring the searcher to have special knowledge that a data set exists and where it may be stored. In this project, a working group, including the U.S. Department of Energy, the Hanford Site contractors, and Pacific Northwest National Laboratory staff, identified needs and requirements for handling complex site data. Geophysical data was chosen as a test case because it can be large and complex and often involves multiple processing steps to extract the information incorporated into deliverables. The ability to document those steps was one of the requirements identified for the catalog. In addition to developing requirements, other activities included selecting a metadata schema and initial testing with the objective of determining whether the workflow and capabilities of selected data catalog software platforms were sufficient to implement and impose the identified requirements. This initial testing involved running the default catalog instance using the software platform of interest and altering the configuration to achieve each requirement, if possible. Where configuration alone was insufficient, the possibility of modifying the software by changing the code was examined, but not implemented. A follow-on task is planned to reprogram the code as necessary to implement requirements in a prototype catalog.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Laboratories for Environmental Management and Stewardship (NNLEMS) National Lab Capabilities in Unmanned Aerial Systems (UAS) (Revision 1)

The Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) formed an Unoccupied Aircraft Systems (UAS) topical team in spring 2025 for the purpose of documenting the capabilities of the National Laboratories relevant to the goals and needs of the Department of Energy (DOE) Office of Legacy Management (LM). The team was comprised of representatives from eight National Laboratories (Table 1), thereby bringing diverse skillsets from across the DOE complex. Recognizing that LM has extensive experience working with UAS contractors and using data collected from UAS, the topical team focused on the National Laboratories’ unique capabilities and types of scientific investigations that are not yet commercially available or easily contracted as services.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 94: US DOE Procurement Opportunities and End-State Contracting Model Status

This panel focused on DoE's procurement implementation strategy and planned activities for its first-tier contractors (Tier 1 procurements). This panel also focused on the implementation status of DoE's End State Contracting Model, which uses a single-award ID/IQ approach to give DOE flexibility to better define discrete scopes of work for site closure or end states. The panelists provided their prospective on progress toward the implementation of this new approach, lessons learned and the path forward for upcoming opportunities utilizing this contracting model. Panelists with presentations: EFCOG (Billy Morrison); DOE Procurement Opportunities - 4 Ways for Small Business Participation (Anne Marie Bird); US DOE Procurement and Contracting Opportunities (Aaron Deckard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097C - Panel: Reuse of Federal Land on the Oak Ridge Reservation, TN (3/4) (R.16c)

This panel was to focus on what is being done to enable federal reuse across the DOE's Oak Ridge Reservation, including how the Community Reuse Organization of East Tennessee (CROET) plays a critical role, how the community is benefiting, and the experience of the private sector companies now occupying the site. The Panelists were to discuss how resources from the East Tennessee Technology Park (ETTP) are being transitioned to support cleanup efforts that enable critical NNSA and Office of Science missions. This session integrated with panel sessions 97A, 97B, and 97D. Panelists with presentations: Community Reuse Organization of East Tennessee (CROET) (Ryan Overton); Community Perspective (Ron Woody); ETTP Tenant Point of View (Bradley Spears); Enabling NNSA and Office of Science Missions (Stephen Phillips); Enabling Federal Land Reuse (David Adler)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗