Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Advanced flight control system study

The architecture, requirements, and system elements of an ultrareliable, advanced flight control system are described. The basic criteria are functional reliability of 10 to the minus 10 power/hour of flight and only 6 month scheduled maintenance. A distributed system architecture is described, including a multiplexed communication system, reliable bus controller, the use of skewed sensor arrays, and actuator interfaces. Test bed and flight evaluation program are proposed.

Mcgough, J.↗

Transitioning to Intel-based Linux Servers in the Payload Operations Integration Center

The MSFC Payload Operations Integration Center (POIC) is the focal point for International Space Station (ISS) payload operations. The POIC contains the facilities, hardware, software and communication interface necessary to support payload operations. ISS ground system support for processing and display of real-time spacecraft and telemetry and command data has been operational for several years. The hardware components were reaching end of life and vendor costs were increasing while ISS budgets were becoming severely constrained. Therefore it has been necessary to migrate the Unix portions of our ground systems to commodity priced Intel-based Linux servers. hardware architecture including networks, data storage, and highly available resources. This paper will concentrate on the Linux migration implementation for the software portion of our ground system. The migration began with 3.5 million lines of code running on Unix platforms with separate servers for telemetry, command, Payload information management systems, web, system control, remote server interface and databases. The Intel-based system is scheduled to be available for initial operational use by August 2004 The overall migration to Intel-based Linux servers in the control center involves changes to the This paper will address the Linux migration study approach including the proof of concept, criticality of customer buy-in and importance of beginning with POSlX compliant code. It will focus on the development approach explaining the software lifecycle. Other aspects of development will be covered including phased implementation, interim milestones and metrics measurements and reporting mechanisms. This paper will also address the testing approach covering all levels of testing including development, development integration, IV&V, user beta testing and acceptance testing. Test results including performance numbers compared with Unix servers will be included. need for a smooth transition while maintaining real-time support. An important aspect of the paper will involve challenges and lessons learned. product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support. This paper will also address the deployment approach including user involvement in testing and the , This includes COTS product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support.

Guillebeau, P. L.↗

Flight-test determination of aircraft cruise characteristics using acceleration and deceleration techniques

A flight-test technique has been developed under NASA Dryden sponsorship NSG 4028 to predict aircraft cruise performance characteristics. The technique used acceleration and deceleration maneuvers to define baseline aerodynamic and propulsion system characteristics, which were then input to a performance modeling prediction program. Conventional stabilized 'speed power' tests, which are normally used for cruise performance definition, can comprise a large portion of the flight time in a program. A significant reduction in flight time was estimated using the performance modeling approach with associated savings in cost and schedule. A 20-h verification flight-test program was accomplished.

Yechout, T. R.↗

Orbiter Auxiliary Power Unit Flight Support Plan

This paper discussed the development of an integrated Orbiter Auxiliary Power Unit (APU) and Improved APU (IAPU) Flight Suuport Plan. The plan identifies hardware requirements for continued support of flight activities for the Space Shuttle Orbiter fleet. Each Orbiter vehicle has three APUs that provide power to the hydraulic system for flight control surface actuation, engine gimbaling, landing gear deployment, braking, and steering. The APUs contain hardware that has been found over the course of development and flight history to have operating time and on-vehicle exposure time limits. These APUs will be replaced by IAPUs with enhanced operating lives on a vehicle-by-vehicle basis during scheduled Orbiter modification periods. This Flight Support Plan is used by program management, engineering, logistics, contracts, and procurement groups to establish optimum use of available hardware and replacement quantities and delivery requirements for APUs until vehicle modifications and incorporation of IAPUs. Changes to the flight manifest and program delays are evaluated relative to their impact on hardware availability.

Guirl, Robert↗

Coping with Irregular Operations: Implications for a Free Flight Environment

Irregular operations involve disruption of scheduled airline operations. They ate of concern to the carriers because they cost money, require personnel effort, and may harm customer good will. Irregular operations may result from aircraft system malfunctions that take planes out of service or result in cancellations, Might system problems or passenger medical emergencies that require diversions, local airport problems that may close down a runway, or weather systems that restrict flow into airports or regions. At the heart of responding to irregular operations is distributed decision making by members of airline operations centers, pilots, and the air traffic control system. Six U.S. carriers participated in a study in which we observed strategies used by operations center personnel to handle various classes of irregular operations. We focused on situations that are most disruptive to regular operations and are most difficult to cope with. We also sought to identify classes of events that would be most affected by changes in the air traffic management system. How a carrier deals with disruptions to its schedule reflects its philosophy and primary goals, as well as its resources. Size and type of operations (short or long-haul) determine which problems have priority. Each airline has different technological support tools to aid in flight planning and replanning, and some carriers have established contingency procedures for coping with various situations. We also examined differences in extent and type of interaction between ABC personnel and various elements of the air traffic system as they managed various problems: who interacts with AM what situations prompt interaction, how often these occur, and the outcomes and Perceived benefits. Use of the expanded NRP program was also studied, along with its advantages to the individual companies. We also examined the implications of the proposed change to a free flight environment on airline strategies for coping with irregular operations.

Orasanu, Judith↗

Strategic and Tactical Functions in an Autonomous Air Traffic Management System

This paper evaluates, by means of fast-time simulation, performance of a candidate system for autonomous air traffic management. Advancing towards autonomy in air traffic management may be necessary in order for new air vehicle types such as electric Vertical Take Off and Landing (eVTOL) to operate safely and efficiently in airspace shared with conventional traffic. To account for uncertain prediction, autonomous air traffic management was divided into two integrated and coordinated subsystems: strategic scheduling, performed at predeparture, and tactical conflict detection and resolution, performed throughout the flight. The conflict detection and resolution subsystem contained a second tactical scheduling function that applied to flights operating in the airspace near the destination airport. This paper compares and contrasts the two subsystems and uses fast-time simulation to demonstrate the comparisons. A scenario of 54 flights inbound to Newark Liberty International Airport was simulated multiple times with different parameters. The scenario was created using flight plans recorded from the National Airspace System on a low weather, average traffic day in April 2018. Whereas the routes were not changed, the departure times of the flights were modified to increase arrival rates at the Newark runway and arrival meter fixes. Results of the simulations showed that the autonomous air traffic management system was able to safely manage the traffic, even with prediction uncertainty. In addition, they showed the importance of including flight holding maneuvers, in addition to path stretching, in conflict detection and resolution and of coordinating strategic and tactical scheduling. Finally, a tradeoff between absorbing the delay calculated by strategic scheduling on the ground versus in the air showed that taking most of the delay on the ground is cost effective for a simple idealized cost function. However, taking a little of the delay in the air prevented throughput on the runway from dropping for short periods due to trajectory prediction uncertainty.

air traffic control↗

Strategic and Tactical Functions in an Autonomous Air Traffic Management System

This paper evaluates, by means of fast-time simulation, performance of a candidate system for autonomous air traffic management. Advancing towards autonomy in air traffic management may be necessary in order for new air vehicle types such as electric Vertical Take Off and Landing (eVTOL) to operate safely and efficiently in airspace shared with conventional traffic. To account for uncertain prediction, autonomous air traffic management was divided into two integrated and coordinated subsystems: strategic scheduling, performed at predeparture, and tactical conflict detection and resolution, performed throughout the flight. The conflict detection and resolution subsystem contained a second tactical scheduling function that applied to flights operating in the airspace near the destination airport. This paper compares and contrasts the two subsystems and uses fast-time simulation to demonstrate the comparisons. A scenario of 54 flights inbound to Newark Liberty International Airport was simulated multiple times with different parameters. The scenario was created using flight plans recorded from the National Airspace System on a low weather, average traffic day in April 2018. Whereas the routes were not changed, the departure times of the flights were modified to increase arrival rates at the Newark runway and arrival meter fixes. Results of the simulations showed that the autonomous air traffic management system was able to safely manage the traffic, even with prediction uncertainty. In addition, they showed the importance of including flight holding maneuvers, in addition to path stretching, in conflict detection and resolution and of coordinating strategic and tactical scheduling. Finally, a tradeoff between absorbing the delay calculated by strategic scheduling on the ground versus in the air showed that taking most of the delay on the ground is cost effective for a simple idealized cost function. However, taking a little of the delay in the air prevented throughput on the runway from dropping for short periods due to trajectory prediction uncertainty.

air traffic control↗

Experiment K-7-20: Pituitary Oxytocin and Vasopressin Content of Rats Flown on Cosmos 2044

Pituitary levels of oxytocin (OT) and vasopressin (VP) were measured in rats exposed to 14 days of spaceflight (FLT) as well as in ground-based controls; one group synchronously maintained in flight-type cages with similar feeding schedules (SYN), one group in vivarium cages (VIV), and a group of tail suspended (SUS) animals. Flight rats had significantly less (p less than 0.05) pituitary OT and VP (4.48 +/- 0.31 and 7.48 +/- 0.53 mg hormone / mg protein, n = 5) than either the SYN (6.66 +/- 0..59 and 10.98 + 1.00, n = 5), VIV (6.14 +/- 0.40 and 10.98 +/- 0..81, n = 5) or SUS (5.73 +/- 0.24, n = 4) control groups, respectively. The reduced levels of pituitary OT and VP are similar to measurements made on rats from the previous 12.5 day Cosmos 1887 mission and appear to be a direct result of exposure to spaceflight.

Keil, L.↗

A Technology Demonstration Experiment for Laser Cooled Atomic Clocks in Space

We have been developing a laser-cooling apparatus for flight on the International Space Station (ISS), with the intention of demonstrating linewidths on the cesium clock transition narrower than can be realized on the ground. GLACE (the Glovebox Laser- cooled Atomic Clock Experiment) is scheduled for launch on Utilization Flight 3 (UF3) in 2002, and will be mounted in one of the ISS Glovebox platforms for an anticipated 2-3 week run. Separate flight definition projects funded at NIST and Yale by the Micro- gravity Research Division of NASA as a part of its Laser Cooling and Atomic Physics (LCAP) program will follow GLACE. Core technologies for these and other LCAP missions are being developed at JPL, with the current emphasis on developing components such as the laser and optics subsystem, and non-magnetic vacuum-compatible mechanical shutters. Significant technical challenges in developing a space qualifiable laser cooling apparatus include reducing the volume, mass, and power requirements, while increasing the ruggedness and reliability in order to both withstand typical launch conditions and achieve several months of unattended operation. This work was performed at the Jet Propulsion Laboratory under a contract with the National Aeronautics and Space Administration.

Klipstein, W. M.↗

Development of the ECOSAR P-Band Synthetic Aperture Radar

This paper describes objectives and recent progress on the development of the EcoSAR, a new P-band airborne radar instrument being developed at the NASA/ Goddard Space Flight Center (GSFC) for the polarimetric and interferometric measurements of ecosystem structure and biomass. These measurements support science requirements for the study of the carbon cycle and its relationship to climate change. The instrument is scheduled to be completed and flight tested in 2013. Index Terms SAR, Digital Beamforming, Interferometry.

Rincon, R. F.↗

Assessing Tactical Scheduler Options for Time-Based Surface Metering

NASA is committed to demonstrating a concept of integrated arrival, departure, and surface operations by 2020 under the Airspace Technology Demonstration 2 (ATD2) sub-project. This will be accomplished starting with a demonstration of flight specific time-based departure metering at Charlotte Douglass International Airport (CLT). ATD2 tactical metering capability is based on NASAs Spot And Runway Departure Advisor (SARDA) which has been tested successfully in human-in-the-loop simulations of CLT. SARDA makes use of surface surveillance data and surface modeling to estimate the earliest takeoff time for each flight active on the airport surface or ready for pushback from the gate. The system then schedules each flight to its assigned runway in order of earliest takeoff time and assigns a target pushback time, displayed to ramp controllers as an advisory gate hold time. The objective of this method of departure metering is to move as much delay as possible to the gate to minimize surface congestion and engine on-time, while keeping sufficient pressure on the runway to maintain throughput. This flight specific approached enables greater flight efficiency and predictability, facilitating trajectory-based operations and surface-airspace integration, which ATD2 aims to achieve.Throughout ATD2 project formulation and system development, researchers have continuously engaged with stakeholders and future users, uncovering key system requirements for tactical metering that SARDA did not address. The SARDA scheduler is updated every 10 seconds using real-time surface surveillance data to ensure the most up-to-date information is used to predict runway usage. However, rapid updates also open the potential for fluctuating advisories, which Ramp controllers at a busy airport like CLT find unacceptable. Therefore, ATD2 tactical metering requires that all advisories freeze once flights are ready so that Ramp controllers may communicate a single hold time when responding to pilot ready calls.

Zelinski, Shannon↗

Requirements and feasibility study of flight demonstration of Active Controls Technology (ACT) on the NASA 515 airplane

A preliminary design study was conducted to evaluate the suitability of the NASA 515 airplane as a flight demonstration vehicle, and to develop plans, schedules, and budget costs for fly-by-wire/active controls technology flight validation in the NASA 515 airplane. The preliminary design and planning were accomplished for two phases of flight validation.

Gordon, C. K.↗

Preflight and In-Flight Exercise Conditions for Astronauts on the International Space Station

The physiological demands of spaceflight require astronauts to have certain physical abilities. They must be able to perform routine and off-nominal physical work during flight and upon re-entry into a gravity environment to ensure mission success, such as an Extra Vehicular Activity (EVA) or emergency egress. To prepare the astronauts for their mission, a Wyle Astronaut Strength Conditioning and Rehabilitation specialist (ASCR) works individually with the astronauts to prescribe preflight strength and conditioning programs and in-flight exercise, utilizing Countermeasure Systems (CMS) exercise hardware. PURPOSE: To describe the preflight and in-flight exercise programs for ISS crewmembers. METHODS: Approximately 2 years before a scheduled launch, an ASCR is assigned to each astronaut and physical training (PT) is routinely scheduled. Preflight PT of astronauts consists of carrying out strength, aerobic and general conditioning, employing the principles of periodization. Exercise programs are prescribed to the astronauts to account for their individual fitness levels, planned mission-specific tasks, areas of concern, and travel schedules. Additionally, astronauts receive instruction on how to operate CMS exercise hardware and receive training for microgravity-specific conditions. For example, astronauts are scheduled training sessions for the International Space Station (ISS) treadmill (TVIS) and cycle ergometer (CEVIS), as well as the Advanced Resistive Exercise Device (ARED). In-flight programs are designed to maintain or even improve the astronauts pre-flight levels of fitness, bone health, muscle strength, power and aerobic capacity. In-flight countermeasure sessions are scheduled in 2.5 h blocks, six days a week, which includes 1.5 h for resistive training and 1 h for aerobic exercise. CONCLUSIONS: Crewmembers reported the need for more scheduled time for preflight training. During flight, crewmembers have indicated that the in-flight exercise is sufficient, but would like more reliable and capable hardware.

Guilliams, Mark E.↗

Thermal, Avionics, and Power Considerations for Designing a Nuclear Thermal Propulsion Flight Demonstrator

As part of the Appropriations Bill passed by the US Congress in February 2019, NASA was instructed to develop a nuclear thermal propulsion (NTP) flight demonstrator by 2024. [4] In response to this directive, the Advanced Concepts Office (ACO) at Marshall Space Flight Center (MSFC) was tasked with beginning concept studies for the flight demonstration (FD) mission. During the NTP study formulation, two philoso- phies emerged with regards to FD concept design. The first, Flight Demo 1 (FD1), strictly observes the 2024 schedule requirement at the expense of lower engine performance than expected of theoretical NTP engines. The second concept, Flight Demo 2 (FD2), relaxes the schedule requirement to allow for higher engine performance and more traceability to future operational systems. Both the FD1 and FD2 concepts present considerable challenges for subsystem design, specifically in the areas of thermal control, avionics, and power. To guard against undesired graveyard orbits, a requirement to keep the NTP engine and the reaction control system (RCS) separate was put in place. As a result of this requirement, the avionics subsystem must provide separate command and data handling (CDH) and instrumentation for each propulsion system. In-space instrumentation and monitoring of a NTP system has never been done before, necessitating the development of novel strategies and unique hardware. The heating rates produced by the NTP engine are extremely high, leading to difficulties with thermal control. The FD1 concept utilizes high-pressure gaseous hydrogen (GH2), which is largely insensitive to temperature fluctuations. The FD2 concept, however, utilizes cryogenic liquid hydrogen (LH2) which must be kept stable near 20 Kelvin. A high-performance thermal control system (TCS) will be required to ensure all components and subsystems are maintained within their operational temperature ranges. This paper will highlight the thermal, avionics, and power solutions required for the full scope of challenges for a NTP flight demonstrator.

Johnson, W. E.↗

AVCOAT Density Characterization for Orion Multi-Purpose Crew Vehicle

The Orion Multi-Purpose Crew Vehicle (MPCV) will transport four crew members to and from lunar-class orbital destinations. The first orbital Exploration Flight Test (EFT-1) is scheduled for December 2014 and will provide valuable data on several systems, including the heat shield. The heat shield material is AvcoatTM, a mid-density ablator. Specifically, the heat shield contains a fiberglass-phenolic honeycomb structure filled with an ablative epoxy novolac resin. Post-flight characterization of the EFT-1 thermal protection system will be conducted in order to study the material response and measure the char front of the material. Avcoat density profiling will be conducted to study three critical material zones: char, pyrolysis, and virgin states as a function of material depth. As part of a ground test campaign, Avcoat coupons are tested at the NASA Ames Research Center Arc Jet Complex. The test campaign is set forth to study material response based on environments, perform Avcoat material density characterization, and compare the char depths from the HEAT sensor and density profiling studies. These investigations will then be compared to flight data in order to improve upon TPS material response models.

AVCOAT↗

STS-103 Crew Activities Report: Flight Day 7 Highlights

Today Discovery's astronauts begin preparing the spacecraft for it's scheduled return to Earth by checking out the flight control system and reaction control jets that support re-entry. Later in the day the astronauts begin stowing equipment used during the past week and start buttoning up on-orbit systems. The Ku-band antenna which provides most of the capacity for data and television relay was stowed around 8:45 p.m. The recently refurbished Hubble Space Telescope moves slowly through it's checkout sequence before resuming science operations. Both the flight control system (FCS) and the reaction control jets (RCS) were without issue, with all systems ready to support Discovery's return to Earth.

Source record↗

Thermal Design and Analysis of the Optical Telescope Assembly for the Gondola for High Altitude Planetary Science

The NASA Gondola for High Altitude Planetary Science (GHAPS) project is an effort to design, build, and fly a balloon-borne platform for planetary science missions. GHAPS observations will be in the 300 nm to 5 micron wavelength region covering UV, visible, and near-mid IR. The primary element of the project is the Optical Telescope Assembly (OTA). It is a one meter aperture narrow-field-of-view telescope that contains the primary and secondary mirrors, the support system/metering structure, a secondary mirror focusing system, baffles, and insulation. This paper presents the thermal design and analysis that has been done to support the design of the OTA. A major part of the thermal analysis was bounding the flight environment for the six potential Columbia Scientific Balloon Facility launch sites. These analyses were used to give input into the Structural Thermal Optical Performance (STOP) analysis of the telescope. Also the analysis was used to select heater sizes for the few OTA associated electronic components. Currently the telescope is scheduled to have its first flight in 2019.

O'Connor, Brian↗

Mars Pathfinder Status at Launch

The Mars Pathfinder Flight System is in final test, assembly and launch preparations at the Kennedy Space Center in Florida. Launch is scheduled for 2 Dec. 1996. The Flight System development, in particular the Entry, Descent, and Landing (EDL) system, was a major team effort involving JPL, other NASA centers and industry. This paper provides a summary Mars Pathfinder description and status at launch. In addition, a section by NASA's Langley Research Center, a key EDL contributor, is provided on their support to Mars Pathfinder. This section is included as an example of the work performed by Pathfinder team members outside JPL.

Spear, A. J.↗