Search NASA⌕ Search

SEARCH · Search NASA

Results for “function as a service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

A simple hyperbolic model for communication in parallel processing environments

We introduce a model for communication costs in parallel processing environments called the 'hyperbolic model,' which generalizes two-parameter dedicated-link models in an analytically simple way. Dedicated interprocessor links parameterized by a latency and a transfer rate that are independent of load are assumed by many existing communication models; such models are unrealistic for workstation networks. The communication system is modeled as a directed communication graph in which terminal nodes represent the application processes that initiate the sending and receiving of the information and in which internal nodes, called communication blocks (CBs), reflect the layered structure of the underlying communication architecture. The direction of graph edges specifies the flow of the information carried through messages. Each CB is characterized by a two-parameter hyperbolic function of the message size that represents the service time needed for processing the message. The parameters are evaluated in the limits of very large and very small messages. Rules are given for reducing a communication graph consisting of many to an equivalent two-parameter form, while maintaining an approximation for the service time that is exact in both large and small limits. The model is validated on a dedicated Ethernet network of workstations by experiments with communication subprograms arising in scientific applications, for which a tight fit of the model predictions with actual measurements of the communication and synchronization time between end processes is demonstrated. The model is then used to evaluate the performance of two simple parallel scientific applications from partial differential equations: domain decomposition and time-parallel multigrid. In an appropriate limit, we also show the compatibility of the hyperbolic model with the recently proposed LogP model.

Stoica, Ion↗

Industry Consolidation and Future Airline Network Structures in Europe

In the current downturn in demand for air travel, major airlines are revising and rationalizing their networks in an attempt to improve financial performance and strengthen their defences against both new entrants and traditional rivals. Expansion of commercial agreements or alliances with other airlines has become a key reaction to the increasingly competitive marketplace. In the absence, for regulatory reasons, of cross-border mergers these are the principal means by which the industry can consolidate internationally. This paper analyzes the developments which have been taking place and attempts to itentify the implications for airline network structures and the function of different hub airports. The range of services available to passengers in long-haul markets to/from Europe is evaluated before and after recent industry reorganization. Hubs are crucial to interlink the route networks of parmers in an alliance. However, duplication between nearby hub airports that find themselves within the same airline alliance can lead to loss of service at the weaker locations. The extent to which the alliance hubs in Europe duplicate or complement each other in terms of network coverage is assessed and this methodology also enables the optimal partnerships for "unattached" airlines to be identified. The future role of the various European hubs is considered under different scenarios of global alliance development. The paper concludes by considering possible longer-term developments. In an environment where the low-cost carriers will provide a major element of customer choice, it is suggested that the traditional airlines will retrench around their hubs, surrendering many secondary cities to the low-cost sector. Further reduction in the number of alliances could threaten more of the European hubs. For both regulatory and commercial reasons, the end result may be just one airline alliance - so recreating in the deregulated market the historic rule of IATA.

Dennis, Nigel↗

Portfolio Management

Enterprise Business Information Services Division (EBIS) supports the Laboratory and its functions through the implementation and support of business information systems on behalf of its business community. EBIS Five Strategic Focus Areas: (1) Improve project estimating, planning and delivery capability (2) Improve maintainability and sustainability of EBIS Application Portfolio (3) Leap forward in IT Leadership (4) Comprehensive Talent Management (5) Continuous IT Security Program. Portfolio Management is a strategy in which software applications are managed as assets

Information Technology Applications↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 micrometers in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 micrometers or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in April 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This presentation presents relevant results of the post-test inspection for both discharge and neutralizer cathodes.

Lifetime↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 μm in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 μm or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Rohit Shastry↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 h of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Ion engine↗

Developing a Set of Indicators to Identify, Monitor, and Track Impacts and Change in Forests of the United States

United States forestland is an important ecosystem type, land cover, land use, and economic resource that is facing several drivers of change including climatic. Because of its significance, forestland was identified through the National Climate Assessment(NCA) as a key sector and system of concern to be included in a system of climate indicators as part of a sustained assessment effort. Here, we describe 11 informative core indicators of forests and climate change impacts with metrics available or nearly available for use in the NCA efforts. The recommended indicators are based on a comprehensive conceptual model which recognizes forests as a land use, an ecosystem, and an economic sector. The indicators cover major forest attributes such as extent, structural components such as biomass, functions such as growth and productivity, and ecosystem services such as biodiversity and outdoor recreation. Interactions between humans and forests are represented through indicators focused on the wildland-urban interface, cost to mitigate wildfire risk, and energy produced from forest-based biomass. Selected indicators also include drought and disturbance from both wildfires and biotic agents. The forest indicators presented are an initial set that will need further refinement in coordination with other NCA indicator teams. Our effort ideally will initiate the collection of critical measurements and observations and lead to additional research on forest-climate indicators.

U.S. forests↗

USPS – Lean Green Teams

Institutional change case study details the U.S. Postal Service's Lean Green Teams, which collaborate across functions to identify and implement low- and no-cost ways to conserve natural resources, purchase fewer consumable products, and reduce waste.

FEMP↗

The Development of the Corrosion Control Limits for Direct Feed Low-Activity Waste Melter-Off Gas Returns to Hanford Tank Farms - 18196

The Savannah River National Laboratory has been developing a corrosion model to facilitate implementation of Hanford's Direct Feed Low Waste (DFLAW) flowsheet. Laboratory testing and statistical analysis have been used to determine the necessary corrosion controls for returning effluent from the Hanford Waste Treatment and Immobilization Plant's Low Activity Waste Vitrification melter off-gas treatment system to the tank farms. The stream compositions are projected to contain components at relative concentrations that are significantly more corrosive toward carbon steel, specifically halide and sulfate anions, than the current waste compositions in the tank farms. Administrative programs are in place to mitigate potential corrosion mechanisms and thereby maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. Waste chemistry and temperature control are the means by which corrosion degradation of the waste tanks is minimized. The current administrative specification for chemical composition and temperature for the underground carbon steel waste tanks is not designed to control the higher halide or sulfate composition. The content of the DFLAW waste streams will be diverse and depend on several factors, such as the melter feed composition and melter idle time. Other factors, such as effluent management of the off gas water collections, will impact the variability of the return streams even more. The work performed by the Savannah River National Laboratory has confirmed that the halide ions are the most aggressive species in the return stream compositions projected using a flowsheet simulation, and nitrite is the most effective inhibitor at pH 10 and 40 deg. C. This test program has employed statistically designed test matrices to determine the dependent variables and the interaction terms between the variables that are significant for the corrosion model and definition of the corrosion control specifications. The first phase of testing focused on identifying aggressive species in off-gas condensate return compositions that present a propensity for localized corrosion attack, namely pitting corrosion. The second phase of testing focused on developing a corrosion model from the interaction terms that will predict the susceptibility of pitting in the double shell tank system based on waste composition and the required amount of corrosion inhibitor. The data collected from this testing program in conjunction with other testing programs, both at the Savannah River Site and the Hanford Site, along with operations knowledge, has determined the chemistry ranges and chemical species requirements for corrosion control in the Hanford double-shell tank system for the effluents generated in the Hanford Waste Treatment and Immobilization Plant's Low Activity Waste facility during the DFLAW phase of operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

42 ENGINEERING↗

Doppler Lidar System Design via Interdisciplinary Design Concept at NASA Langley Research Center - Part I

Optimized designs of the Navigation Doppler Lidar (NDL) instrument for Autonomous Landing Hazard Avoidance Technology (ALHAT) were accomplished via Interdisciplinary Design Concept (IDEC) at NASA Langley Research Center during the summer of 2013. Three branches in the Engineering Directorate and three students were involved in this joint task through the NASA Langley Aerospace Research Summer Scholars (LARSS) Program. The Laser Remote Sensing Branch (LRSB), Mechanical Systems Branch (MSB), and Structural and Thermal Systems Branch (STSB) were engaged to achieve optimal designs through iterative and interactive collaborative design processes. A preliminary design iteration was able to reduce the power consumption, mass, and footprint by removing redundant components and replacing inefficient components with more efficient ones. A second design iteration reduced volume and mass by replacing bulky components with excessive performance with smaller components custom-designed for the power system. Mechanical placement collaboration reduced potential electromagnetic interference (EMI). Through application of newly selected electrical components and thermal analysis data, a total electronic chassis redesign was accomplished. Use of an innovative forced convection tunnel heat sink was employed to meet and exceed project requirements for cooling, mass reduction, and volume reduction. Functionality was a key concern to make efficient use of airflow, and accessibility was also imperative to allow for servicing of chassis internals. The collaborative process provided for accelerated design maturation with substantiated function.

Boyer, Charles M.↗

Charter for Systems Engineer Working Group

This charter establishes the International Space Station Program (ISSP) Mobile Servicing System (MSS) Systems Engineering Working Group (SEWG). The MSS SEWG is established to provide a mechanism for Systems Engineering for the end-to-end MSS function. The MSS end-to-end function includes the Space Station Remote Manipulator System (SSRMS), the Mobile Remote Servicer (MRS) Base System (MBS), Robotic Work Station (RWS), Special Purpose Dexterous Manipulator (SPDM), Video Signal Converters (VSC), and Operations Control Software (OCS), the Mobile Transporter (MT), and by interfaces between and among these elements, and United States On-Orbit Segment (USOS) distributed systems, and other International Space Station Elements and Payloads, (including the Power Data Grapple Fixtures (PDGFs), MSS Capture Attach System (MCAS) and the Mobile Transporter Capture Latch (MTCL)). This end-to-end function will be supported by the ISS and MSS ground segment facilities. This charter defines the scope and limits of the program authority and document control that is delegated to the SEWG and it also identifies the panel core membership and specific operating policies.

Suffredini, Michael T.↗

Guidance and Navigation for Rendezvous and Proximity Operations with a Non-Cooperative Spacecraft at Geosynchronous Orbit

The feasibility and benefits of various spacecraft servicing concepts are currently being assessed, and all require that the servicer spacecraft perform rendezvous, proximity, and capture operations with the target spacecraft to be serviced. Many high-value spacecraft, which would be logical targets for servicing from an economic point of view, are located in geosynchronous orbit, a regime in which autonomous rendezvous and capture operations are not commonplace. Furthermore, existing GEO spacecraft were not designed to be serviced. Most do not have cooperative relative navigation sensors or docking features, and some servicing applications, such as de-orbiting of a non-functional spacecraft, entail rendezvous and capture with a spacecraft that may be non-functional or un-controlled. Several of these challenges have been explored via the design of a notional mission in which a nonfunctional satellite in geosynchronous orbit is captured by a servicer spacecraft and boosted into super-synchronous orbit for safe disposal. A strategy for autonomous rendezvous, proximity operations, and capture is developed, and the Orbit Determination Toolbox (ODTBX) is used to perform a relative navigation simulation to assess the feasibility of performing the rendezvous using a combination of angles-only and range measurements. Additionally, a method for designing efficient orbital rendezvous sequences for multiple target spacecraft is utilized to examine the capabilities of a servicer spacecraft to service multiple targets during the course of a single mission.

Barbee, Brent William↗

A systematic solution to quantify economic values of vehicle grid integration

We report Vehicle-Grid-Integration (VGI) supplies one of the potential benefit extensions for electric vehicles (EVs) to make use of their parking time, which enables the EVs to provide grid services while still meeting consumer driving needs. However, the costs, benefits and risks of VGI still remain unclear, which limits the development of the VGI to promote the interaction between the EV and grid. In this study, we propose an integrated framework to quantify and utilize the aggregate flexibility of the EVs to supply the grid services in electricity markets. The integrated solution includes five sub-modules that cover end-to-end functionalities from individual EV energy consumption estimation to final monetary values calculation of providing grid services. Both wholesale market and local level charging management are formulated in the optimization module. A predictive control algorithm is proposed to allocate power to individual vehicles in real time, considering uncertainties from dispatch signal and travel behavior. Simulation results from 10,000 EVs indicate that the proposed optimization methods can significantly reduce the system cost in both wholesale market and retail market. Local tariff optimization reduces the electricity cost by 24.4% compared to uncontrolled charging. Wholesale market optimization results show that $\$$691 and $\$$255 revenues can be captured by each EV in ERCOT and CAISO markets per year, although with a conservative assumption on battery throughput cost at 0.16$\$$/kWh.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lawrence Livermore National Security CFO Processes Functional Management Assessment

The scope of the Functional Management Assessment of the CFO included a review of the CFO Organizational Structure, including deployed financial services and the division of responsibilities and internal controls between CFO and other organizations that perform financial functions across the Laboratory. In addition, the assessment team solicited input from end users and reviewers. Three issues discussed are: ISSUE 1: Financial activities and cash transactions are occurring outside the CFO organization. Approximately $200M of non-purchase order spending occurs in seven areas outside CFO control (travel, relocation, special disbursements, IPO, legal, risk management, and freight). NIF financial services have not been integrated into the CFO organization and operate outside CFO control. Business risks--There is no single point of financial accountably; Currently within the CFO and Business and Operations organizations there is a lack of clarity of roles and responsibilities for financial activities; Financial talent within the laboratory is fragmented; and Inefficiencies exist based on the current structure; An example of the above business risks associated with organizational structure can be observed in the process for reimbursement of relocation costs to employees. Currently, Human Resources and Travel both administer portions of an employee's relocation. Costs are reviewed for compliance with FAR travel guidelines and for compliance with the offer letter but there is no financial review for allowability of costs nor is there a single point where the total relocation costs are reviewed. Through the e-pay system the check is processed by the CFO organization but there is no review by that organization. ISSUE 2: Impact of involuntary separation on current and future activities. 3 risks are: (1) Loss of internal controls--with the upcoming involuntary reductions there will be a loss of personnel with institutional knowledge which will increase the risk of losing internal control on some processes. The organization needs to be cognizant of this risk and take measures to minimize financial risk and ensure on-going A-123 compliance. (2) Project Costing Implementation (PCI) delay--the implementation of PCI is key to achieving integration and reporting of financial data. Presently, business analysts spend half of their time collecting and compiling data and 94% of the labs financial management reports are created using spreadsheets. Currently, the PCI project is on schedule but the involuntary reductions may result in loss of support in this area. (3) Financial Performance Milestones not met--for FY-08 there are fixed, base and stretch financial performance milestones for the laboratory. With reductions in staff the risk of missing key milestones increases. ISSUE 3: Strategically growing the Work for Others (WFO) Portfolio. A key objective of the laboratory is to increase WFO. Greater reliance on WFO will result in additional funding sources and increase the number of control points and financial activities to be monitored thus increasing the level of financial complexity at the lab. The CFO organization should work now to improve controls and processes to accommodate these changes. In particular the following areas should be focused on: (1) Cost reporting needs to be streamlined; (2) Cost Transfer controls need to be increased; and (3) Timely monitoring and close out of contracts needs occur.

99 GENERAL AND MISCELLANEOUS↗

Rolling Beam Umbilical System

The decision to make the Centaur Vehicle a Space Transportation System (STS) payload meant that new ground support equipment provisions at Launch Pads Pads 39A and 39B were required. These new equipment provisions were needed to service the Centaur vehicle while it was installed in the Orbiter's payload bay prior to launch. This paper describes the design of a new rolling beam umbilical syste (RBUS) being added to the pad fixed service structure (FSS) in order to provide the primary functions of liquid hydrogen (LH2) fill, drain, and vent. The carrier plate itself is a Government-furnished equipment item and of necessity became a T-O disconnect. This permits quick offloading in the event of an abort prior to lift-off. In addition to the rolling beam structure, mechanisms, and fluid lines, it was necessary to design and build a carrier plate simulator to support early development testing of the mast at the Launch Equipment Test Facility at Kennedy Space Center. The RBUS is designed to be compatible with the rotating service structure (RSS) to the extent that the umbilical may be deployed with the RSS mated with the vehicle. It is also designed to clear the RSS as the RSS rotates back out of the way. Accessibility to the Orbiter aft compartment via the 50-1 door had to be maintained.

Tatem, B. C., Jr.↗