Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Automated Test Systems for Toxic Vapor Detectors

The NASA Toxic Vapor Detection Laboratory (TVDL) at the Kennedy Space Center (KSC), Florida, has been using Personal Computer based Data Acquisition and Control Systems (PCDAS) for about nine years. These systems control the generation of toxic vapors of known concentrations under controlled conditions of temperature and humidity. The PCDAS also logs the test conditions and the test article responses in data files for analysis by standard spreadsheets or custom programs. The PCDAS was originally developed to perform standardized qualification and acceptance tests in a search for a commercial off-the-shelf (COTS) toxic vapor detector to replace the hydrazine detectors for the Space Shuttle launch pad. It has since become standard test equipment for the TVDL and is indispensable in producing calibration standards for the new hydrazine monitors at the 10 part per billion (ppb) level. The standard TVDL PCDAS can control two toxic vapor generators (TVG's) with three channels each and two flow/ temperature / humidity (FTH) controllers and it can record data from up to six toxic vapor detectors (TVD's) under test and can deliver flows from 5 to 50 liters per minute (L/m) at temperatures from near zero to 50 degrees Celsius (C) using an environmental chamber to maintain the sample temperature. The concentration range for toxic vapors depends on the permeation source installed in the TVG. The PCDAS can provide closed loop control of temperature and humidity to two sample vessels, typically one for zero gas and one for the standard gas. This is required at very low toxic vapor concentrations to minimize the time required to passivate the sample delivery system. Recently, there have been several requests for information about the PCDAS by other laboratories with similar needs, both on and off KSC. The purpose of this paper is to inform the toxic vapor detection community of the current status and planned upgrades to the automated testing of toxic vapor detectors at the Kennedy Space Center.

Mattson, C. B.↗

Lightning Effects in the Payload Changeout Room

Analytical and empirical studies have been performed to provide better understanding of the electromagnetic environment inside the Payload Changeout Room and Orbiter payload bay resulting from lightning strikes to the launch pad lightning protection system. The analytical studies consisted of physical and mathematical modeling of the pad structure and the Payload Changeout Room. Empirical testing was performed using a lightning simulator to simulate controlled (8 kA) lightning strikes to the catenary wire lightning protection system. In addition to the analyses and testing listed above, an analysis of the configuration with the vehicle present was conducted, in lieu of testing, by the Finite Difference, Time Domain method.

Thomas, Garland L.↗

Performance of the Spacecraft Propulsion Research Facility During Altitude Firing Tests of the Delta 3 Upper Stage

The Spacecraft Propulsion Research Facility at the NASA Lewis Research Center's Plum Brook Station was reactivated in order to conduct flight simulation ground tests of the Delta 3 cryogenic upper stage. The tests were a cooperative effort between The Boeing Company, Pratt and Whitney, and NASA. They included demonstration of tanking and detanking of liquid hydrogen, liquid oxygen and helium pressurant gas as well as 12 engine firings simulating first, second, and third burns at altitude conditions. A key to the success of these tests was the performance of the primary facility systems and their interfaces with the vehicle. These systems included the structural support of the vehicle, propellant supplies, data acquisition, facility control systems, and the altitude exhaust system. While the facility connections to the vehicle umbilical panel simulated the performance of the launch pad systems, additional purge and electrical connections were also required which were unique to ground testing of the vehicle. The altitude exhaust system permitted an approximate simulation of the boost-phase pressure profile by rapidly pumping the test chamber from 13 psia to 0.5 psia as well as maintaining altitude conditions during extended steady-state firings. The performance of the steam driven ejector exhaust system has been correlated with variations in cooling water temperature during these tests. This correlation and comparisons to limited data available from Centaur tests conducted in the facility from 1969-1971 provided insight into optimizing the operation of the exhaust system for future tests. Overall, the facility proved to be robust and flexible for vehicle space simulation engine firings and enabled all test objectives to be successfully completed within the planned schedule.

Meyer, Michael L.↗

Lightning Characteristics and Lightning Strike Peak Current Probabilities as Related to Aerospace Vehicle Operations

A summary is presented of basic lightning characteristics/criteria for current and future NASA aerospace vehicles. The paper estimates the probability of occurrence of a 200 kA peak lightning return current, should lightning strike an aerospace vehicle in various operational phases, i.e., roll-out, on-pad, launch, reenter/land, and return-to-launch site. A literature search was conducted for previous work concerning occurrence and measurement of peak lighting currents, modeling, and estimating probabilities of launch vehicles/objects being struck by lightning. This paper presents these results.

Johnson, Dale L.↗

Historical Footage of John Glenn Friendship 7

The Friendship mission launch on the 20th day of February marked the first time that an American attempts to orbit the Earth. Historical footage of John Glenn's suit up, ride out to the launch pad, countdown, liftoff, booster engine cutoff, and separation of the booster engine escape tower is shown. Views of the Earth, Glenn's manual control of the electrical fly-by wire system, and the recovery of the landing vehicle from the ocean are presented.

Source record↗

Lightning Strike Peak Current Probabilities as Related to Space Shuttle Operations

A summary is presented of basic lightning characteristics/criteria applicable to current and future aerospace vehicles. The paper provides estimates on the probability of occurrence of a 200 kA peak lightning return current, should lightning strike an aerospace vehicle in various operational phases, i.e., roll-out, on-pad, launch, reenter/land, and return-to-launch site. A literature search was conducted for previous work concerning occurrence and measurement of peak lighting currents, modeling, and estimating the probabilities of launch vehicles/objects being struck by lightning. This paper presents a summary of these results.

Johnson, Dale L.↗

[STS-51C Launch and Landing]

This NASA KSC video release is comprised of live shots covering the day launch and landing of STS-51C/Discovery. The flight crew members were: Thomas K. Mattingly II, Commander; Loren J. Shriver, Pilot; Ellison S. Onizuka, Mission Specialist; James F. Buchli, Mission Specialist; and Gary E. Payton, Payload Specialist. The launch video is presented from several different vantage points and covers the countdown from the launch pad, main engine ignition, liftoff, and solid rocket booster separation. The landing footage contains final descent and approach, landing gear deployment, and touchdown, which was also captured from different locations including a helicopter. STS-51C carried the DoD 85-1 payload and was the first mission dedicated to the Department of Defense.

Source record↗

STS-41D Post Flight Press Conference with Highlights

The crew, Commander Henry W. Hartsfield, Jr., Pilot Michael L. Coats, Mission Specialists Judith A. Resnik, Steven A. Hawley, and Richard M. Mullane, and Payload Specialist Charles D. Walker are seen participating a panel discussion. Live footage of the Press Conference begins with a brief introduction of all the crew, followed by highlights of the flight, a selection of slides and still pictures, and ends with a question and answer segment. The highlights consist of the astronauts walk out to the Astro-Van, panoramic views of the Discovery on the launch pad, main engine start, ignition of the solid rocket boosters, liftoff, and separation of the boosters. Images of the opening of the sun shield and the deployment of the three communication satellites (Satellite Business System (SBS-D), SYNCOM IV-2, and TELSTAR) are also seen. The crew is seen working on experiments, dumping the wastewater, eating supper, and sleeping. Concluding the live footage are slides, and stills of various areas around the world, including the Libyan Desert, Angola, Namibia, and Australia. The Press Conference ends with questions from Houston, NASA Headquarter, Kennedy Space Center, and Marshall Space Flight Center.

Source record↗

STS-103 Rollout From VAB

Live footage of the fully assembled Discovery Orbiter transported from the VAB (Vehicle Assembly Building) to the Launching Pad is shown.

Source record↗

STS-93: Columbia Flight Crew Arrival on FSS 195' Level, Walk Across OAA and Ingress into White Room

The primary objective of the STS-93 mission was to deploy the Advanced X-ray Astrophysical Facility, which had been renamed the Chandra X-ray Observatory in honor of the late Indian-American Nobel Laureate Subrahmanyan Chandrasekhar. The mission was launched at 12:31 on July 23, 1999 onboard the space shuttle Columbia. The mission was led by Commander Eileen Collins. The crew was Pilot Jeff Ashby and Mission Specialists Cady Coleman, Steve Hawley and Michel Tognini from the Centre National d'Etudes Spatiales (CNES). This videotape opens with a view of the shuttle on the launch pad. It then shows the flight crew arrival on the 195 foot level of the fixed service structure (FSS), walks across the orbiter access arm (OAA) into the white room, where the crew is assisted in putting on the final stages of their spacesuits, and then their crawl into the orbiter.

Source record↗

STS-96 Flight Crew Press Q & A at KSCNF for TCDT

Live footage shows Commander of STS-96 mission, Kent V. Rominger, introducing the other crewmembers, Pilot Rick D. Husband, and Mission Specialists Tamara E. Jernigan, Ellen Ochoa, Daniel T. Barry, Julie Payette and Valery Ivanovich Tokarev. During the introduction, Rominger describes each crewmember's responsibilities. He also mentions the deployment of STARSHINE, and the scheduled space walk with Jernigan and Barry. Panoramic views of the shuttle on the launch pad are also shown.

Source record↗

STS-96 Crew Training, Mission Animation, Crew Interviews, STARSHINE, Discovery Rollout and Repair of Hail Damage

Live footage shows the crewmembers of STS-96, Commander Kent V. Rominger, Pilot Rick D. Husband, Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette and Valery Ivanovich Tokarev during various training activities. Scenes include astronaut suit-up, EVA training in the Virtual Reality Lab, Orbiter space vision training, bailout training, and crew photo session. Footage also shows individual crew interviews, repair activities to the external fuel tank, and Discovery's return to the launch pad. The engineers are seen sanding, bending, and painting the foam used in repairing the tank. An animation of the deployment of the STARSHINE satellite, International Space Station, and the STS-96 Mission is presented. Footage shows the students from Edgar Allen Poe Middle School sanding, polishing, and inspecting the mirrors for the STARSHINE satellite. Live footage also includes students from St. Michael the Archangel School wearing bunny suits and entering the clean room at Goddard Space Flight Center.

Source record↗

STS-99 Rollout to SRTM 39A

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. The mission was launched at 12:31 on February 11, 2000 onboard the space shuttle Endeavour. and led by Commander Kevin Kregel. The crew was Pilot Dominic L. Pudwill Gorie and Mission Specialists Janet L. Kavandi, Janice E. Voss, Mamoru Mohri from the National Space Development Agency (Japanese Space Agency), and Gerhard P. J. Thiele from DARA (German Space Agency). This videotape shows the shuttle with the solid rocket boosters being rolled out to launch pad 39A.

Source record↗

STS-99 Countdown Status Briefing

Live footage shows the participants in the Press Conference disclosing the status of the STS-99 flight. The panelists consists of NASA's test Director Steve Altemus, the STS-99 Payload Manager Scott Higginbotham, and the Shuttle Weather Officer Ed Priselac. Joel Wells NASA's Public Affairs introduces each panelist as they discuss the problems with the left hand ignition cable, the potential change of the GPS receiver, payload status, and favorable weather conditions. The panel members also answered questions from members of the audience. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

STS-99 Countdown Status Press Conference

Live footage shows the participants in the Press Conference disclosing the status of the STS-99 flight. The panelists consists of NASA's test Director Jeff Spaulding, the STS-99 Payload Manager Scott Higginbotham, and the Shuttle Weather Officer Ed Priselac. Bruce Buckingham NASA's Public Affairs introduces each panelist as they discuss the servicing of fuel tanks, checkout, closeouts, payload status, and favorable weather conditions. The panelists also answer questions from the audience. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

STS-99 Pre-Launch Press Conference

Live footage shows the participants in the Pre-Launch Press Conference disclosing the status of the STS-99 flight. The panelists consists of Ron Dittemore the Shuttle Program Manager from JSC (Johnson Space Center), Dave King Director of Shuttle Operation from KSC (Kennedy Space Center), Klaus Damian Head of ESA Astronaut Training Division, and Capt. Clif Stargardt Meteorologist 45th Weather Squadron. George Diller, NASA's Public Affairs Office, introduces each panelist as they discuss the failure of a segment of the tip seal, the international contributions made to this mission, and the weather condition. The panelists also answer questions from the audience about the rejected component of the tip seal, how this error was made, and the effects that this has on the flight plans. Also shown are various night shots of the Shuttle on the launch pad.

Source record↗

STS-99 Post-Launch Press Conference

Live footage shows the participants in the Post-Launch Press Conference disclosing the status of the STS-99 flight. The panelists consist of Bill Gerstenmaier, Acting Manager of Launch Integration and Dave King, Director of Shuttle Operations at KSC (Kennedy Space Center). Joel Wells, of NASA's Public Affairs Office, introduces each panelist as they discuss the mapping to the Earth, and improve safety of the shuttle. The panelists also answer questions from the audience about the countdown. Also shown are various shots of the Shuttle on the launch pad.

Source record↗

STS-99 / Endeavour Pre Launch Press Conference

Live footage shows the participants in the Pre Launch Press Conference disclosing the status of the STS-99 flight. The panelists consists of Ron Dittemore the Shuttle Program Manager from JSC (Johnson Space Center), Dave King Director of Shuttle Processing from KSC (Kennedy Space Center), and Capt. Clif Stargardt Meteorologist 45th Weather Squadron. George Diller NASA's Public Affairs Office introduces each panelist as they discuss the hardware change, re-test, and the weather condition. The panelists also answer questions from the audience about the GPS box that failed early that morning, the deployment of the mass, and vehicle safety today as it compares to the past. Also shown are various shots of the Shuttle on the launch pad.

Source record↗