Search NASA⌕ Search

SEARCH · Search NASA

Results for “linear collider”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

A New Chicane Experiment in PEP-II to Test Mitigations of the Electron Cloud Effect for Linear Colliders

Beam instability caused by the electron cloud has been observed in positron and proton storage rings, and it is expected to be a limiting factor in the performance of future colliders [1-3]. The effect is expected to be particularly severe in magnetic field regions. To test possible mitigation methods in magnetic fields, we have installed a new 4-dipole chicane experiment in the PEP-II Low Energy Ring (LER) at SLAC with both bare and TiN-coated aluminum chambers. In particular, we have observed a large variation of the electron flux at the chamber wall as a function of the chicane dipole field. We infer this is a new high order resonance effect where the energy gained by the electrons in the positron beam depends on the phase of the electron cyclotron motion with respect to the bunch crossing, leading to a modulation of the secondary electron production. Presumably the cloud density is modulated as well and this resonance effect could be used to reduce its magnitude in future colliders. We present the experimental results obtained during January 2008 until the April final shut-down of the PEP-II machine.

43 PARTICLE ACCELERATORS↗

Accelerators for Electroweak Physics and Higgs Boson Studies

We discuss the goals, the designs, the state of technical readiness, and the critical R&D needs of the accelerators that are currently under discussion as Higgs and electroweak factories. We also address the respective staging options enabling future energy-frontier colliders. The accelerators covered are based on many different techniques and approaches. They include several circular colliders, various linear colliders, colliders based on energy recovery linacs (ERLs), ERL-ring combinations, as well as γγ colliders. The linear colliders proposed consist of options for the International Linear Collider (ILC), for the Compact Linear Collider (CLIC), for the Cold Copper Collider (C 3 ), and for the more recent Higgs-Energy Lepton Collider (HELEN). ERLs are key components of the Recycling Linear e + e - Collider (ReLiC),of the Energy Recovery Linear Collider (ERLC), and of the Circular Energy Recovery Collider (CERC). Among the more conventional ring colliders the following proposals are featured: the Future Circular Collider (FCC-ee), the Circular Electron Positron Collider (CEPC), the Electron Positron Circular Collider at Fermilab (EPCCF), and the Large Electron Positron collider #3 (LEP-3). In addition, we consider the X-ray FEL based gamma- gamma Collider Higgs Factory (XCC) and the High-Energy High-Luminosity γ-γ collider (HE&HL γγ). Finally, a Higgs factory based on a circular muon collider is mentioned for completeness.

43 PARTICLE ACCELERATORS↗

Infrared weak corrections to strongly interacting gauge boson scattering

We evaluate the impact of electroweak corrections of infrared origin on strongly interacting longitudinal gauge boson scattering, calculating all-order resummed expressions at the double log level. As a working example, we consider the standard model with a heavy Higgs. At energies typical of forthcoming experiments (LHC, International Linear Collider, Compact Linear Collider), the corrections are in the 10%-40% range, with the relative sign depending on the initial state considered and on whether or not additional gauge boson emission is included. We conclude that the effect of radiative electroweak corrections should be included in the analysis of longitudinal gauge boson scattering.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

International Linear Collider-A Technical Progress Report

The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

43 PARTICLE ACCELERATORS↗

CESR Conversion Damping Ring Studies of Electron Cloud Instabilities (CESR-TA)

In the International Linear Collider, two linear accelerators will accelerate bunches of positrons and electrons to over a hundred billion electron volts and collide them in a central detector. In order to obtain useful collision rates, the bunches, each containing twenty billion particles, must be compressed to a cross section of a few nanometers by a few hundred nanometers. In order to prepare these ultra high density bunches, damping rings (DRs) are employed before the linear accelerators. The DRs take the high emittance bunches that are provided by the electron and positron sources and, through the process of radiation damping, squeeze them into ultra low emittance beams that are ready for the main linear accelerators. In the damping rings, a number of effects can prevent the successful preparation of the beams. In the electron ring, an effect known as the fast ion instability can lead to beam growth and, in the positron ring, the build-up of an electron cloud (EC), which interacts with the circulating bunches, can produce the same effect. EC build-up and the subsequent interaction of the cloud with the positron beam in the DR have been identified as major risks for the successful construction of a linear collider. The CESRTA research program at the Cornell Electron Storage Ring (CESR) was developed in order to study the build-up of the EC, the details of its impact on ultra low emittance beams, as well as methods to mitigate the impact of the cloud. In the DR, the EC forms when synchrotron photons radiated from the circulating beam strike the walls of the vacuum chamber, resulting in the emission of photoelectrons. These low energy electrons can be accelerated across the vacuum chamber by the electric field of the beam, and strike the walls, causing the emission of secondary electrons. The secondary electrons are subsequently accelerated into the walls yet again via the same mechanism. The result is that the EC can rapidly begin to fill the vacuum chamber. In an electron DR, the EC build-up is limited by the Coulomb repulsion. But in a positron ring, the electrons are pulled into the potential well of the beam. The resulting interaction of the circulating bunches of positrons with the EC that ultimately limits DR performance. Typically we store long trains of closely space bunches in the damping ring. The interaction of stored beam and the EC that is generated by the long train is manifested by different mechanisms: (1) The cloud focuses the beam, which causes a tune shift that increases along the bunch train as the cloud density increases. (2) The cloud electrons couple the motion of bunches along a train. Transverse motion of a leading bunch is transferred to the cloud, and subsequently to a trailing bunch which can result in a multi-bunch instability. (3) The cloud couples the positrons in the head of the bunch to those in the tail of the same bunch, which can excite a 'head-tail' instability. (4) The nonlinear fields of the EC can lead to emittance growth before the onset of instabilities. The CESRTA collaboration, which includes researchers from Cornell University's Laboratory for Elementary-Particle Physics as well as more than 50 senior staff members from over a dozen accelerator laboratories and universities around the world, has operated CESR as a damping ring for the past three years to study these EC effects. A range of specialized instrumentation has been deployed to study the local build-up of the cloud in the vacuum chambers as well as the complicated dynamics exhibited when the beam and the EC interact. The program has significantly advanced our understanding of these issues and has helped identify the most promising methods to mitigate the impact of the EC on the DR beams. It has pointed the way towards a DR design that can meet the stringent specifications of the ILC.

43 PARTICLE ACCELERATORS↗

Working Group Report: Higgs Boson

This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $CP$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities from detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).

43 PARTICLE ACCELERATORS↗

Doubly charged Higgs through photon-photon collisions in 3-3-1 models

We study the production and signatures of doubly charged Higgs bosons (DCHBs) in the process {gamma}{gamma}{r_reversible}H{sup --}H{sup ++} at the e{sup -}e{sup +} International Linear Collider and CERN Linear Collider, where the intermediate photons are given by the Weizsaecker-Willians and laser backscattering distributions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

B-Target Room Tunnel Redesigned

Several groups at SLAC National Accelerator Laboratory are currently working on a RF Modulator prototype for a future linear collider known as the International Linear Collider (ILC). The ILC runs using about a 1000 Klystrons which create high power carrier waves for the particle acceleration. Klystrons receive their electrical input power from modulators. In order to move beyond the prototype phase, the laboratory might expand its ground base further down a tunnel located at the End Station B (ESB) in order to house four new Klystron Modulator Test Stations. This area is known as the B-Target Room Tunnel, and the task was to redesign the tunnel layout for the upcoming changes. The project first began by collecting substantial amount of information about the prototyped project, the tunnel and the researchers feedback of what they would like to see in the upcoming design. Subsequent to numerous planning and presentations, one particular design was. Calculations for this design were then performed for the most complex aspects of the project. Based on the results of the calculations, specific sample beams, welds, bolts and materials were chosen for the possible future construction.

43 PARTICLE ACCELERATORS↗

Linac Alignment Algorithm: Analysis on 1-to-1 Steering

In a linear accelerator, it is important to achieve a good alignment between all of its components (such as quadrupoles, RF cavities, beam position monitors et al.), in order to better preserve the beam quality during acceleration. After the survey of the main linac components, there are several beam-based alignment (BBA) techniques to be applied, to further optimize the beam trajectory and calculate the corresponding steering magnets strength. Among these techniques the most simple and straightforward one is the one-to-one (1-to-1) steering technique, which steers the beam from quad center to center, and removes the betatron oscillation from quad focusing. For a future linear collider such as the International Linear Collider (ILC), the initial beam emittance is very small in the vertical plane (flat beam with {gamma}{epsilon}{sub y} = 20-40nm), which means the alignment requirement is very tight. In this note, we evaluate the emittance growth with one-to-one correction algorithm employed, both analytically and numerically. Then the ILC main linac accelerator is taken as an example to compare the vertical emittance growth after 1-to-1 steering, both from analytical formulae and multi-particle tracking simulation. It is demonstrated that the estimated emittance growth from the derived formulae agrees well with the results from numerical simulation, with and without acceleration, respectively.

43 PARTICLE ACCELERATORS↗