Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Installation and Testing of a Jorin Visual Process Analyzer

The Jorin Visual Process Analyzer (ViPA) is an on-line instrument that uses video microscope imaging to detect and measure the physical characteristics of dispersed objects within a process stream or laboratory sample. Object analysis is performed by capturing an on-going sequence of single frames from the video feed and relaying the images in real time to a nearby control computer where the ViPA software then processes and transfigures the information from the images into meaningful process data. The ViPA captures and analyzes approximately 15 images per second and continuously records 17 material parameters including size, shape and optical density. The ViPA software uses the measured parameters to differentiate between different classes of objects including organic droplets, gas bubbles, and solid particles. Procurement of this instrument provides a unique capability to support predictive modeling and further understanding of mass transfer during solvent extraction processes. Organic droplet data collected using the ViPA can be used to develop dispersion profiles of the liquid-liquid mixing and disengagements sections for each type of process equipment. These profiles will provide insight into mixing dynamics and will guide the prevention of emulsion formation that leads to system losses. Additionally, the measurement capabilities of the ViPA will provide the input needed to create new two-phase Computational Fluid Dynamics (CFD) models that characterize both mixing and separation operations in the various types of equipment. These models can then be used to improve process efficiency by optimizing operation parameters for each proposed extraction cycle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results of Aging Tests of Vendor-Produced Blended Feed Simulant

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is procuring through Pacific Northwest National Laboratory (PNNL) a minimum of five 3,500 gallon batches of waste simulant for Phase 1 testing in the Pretreatment Engineering Platform (PEP). To make sure that the quality of the simulant is acceptable, the production method was scaled up starting from laboratory-prepared simulant through 15-gallon vendor prepared simulant and 250-gallon vendor prepared simulant before embarking on the production of the 3500-gallon simulant batch by the vendor. The 3500-gallon PEP simulant batches were packaged in 250-gallon high molecular weight polyethylene totes at NOAH Technologies. The simulant was stored in an environmentally controlled environment at NOAH Technologies within their warehouse before blending or shipping. For the 15-gallon, 250-gallon, and 3500-gallon batch 0, the simulant was shipped in ambient temperature trucks with shipment requiring nominally 3 days. The 3500-gallon batch 1 traveled in a 70-75°F temperature controlled truck. Typically the simulant was uploaded in a PEP receiving tank within 24-hours of receipt. The first uploading required longer with it stored outside. Physical and chemical characterization of the 250-gallon batch was necessary to determine the effect of aging on the simulant in transit from the vendor and in storage before its use in the PEP. Therefore, aging tests were conducted on the 250-gallon batch of the vendor-produced PEP blended feed simulant to identify and determine any changes to the physical characteristics of the simulant when in storage. The supernate was also chemically characterized. Four aging scenarios for the vendor-produced blended simulant were studied: 1) stored outside in a 250-gallon tote, 2) stored inside in a gallon plastic bottle, 3) stored inside in a well mixed 5-L tank, and 4) subject to extended temperature cycling under summer temperature conditions in a gallon plastic bottle. The following series of aging tests were conducted to accomplish these objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories, California Pollution Prevention Program annual report.

The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA. Pollution Prevention supports the goals and objectives to increase the procurement and use of environmentally friendly products and materials and minimize the generation of waste (nonhazardous, hazardous, radiological, wastewater). Through participation on the Interdisciplinary Team P2 provides guidance for integration of environmentally friendly purchasing and waste minimization requirements into projects during the planning phase. Table 7 presents SNL's corporate objectives and targets that support the elements of the Pollution Prevention program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrow Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.

03 NATURAL GAS↗

DEGRADATION EVALUATION OF HEAVY WATER DRUMS AND TANKS

Heavy water with varying chemistries is currently being stored in over 6700 drums in L- and K-areas and in seven tanks in L-, K-, and C-areas. A detailed evaluation of the potential degradation of the drums and tanks, specific to their design and service conditions, has been performed to support the demonstration of their integrity throughout the desired storage period. The 55-gallon drums are of several designs with Type 304 stainless steel as the material of construction. The tanks have capacities ranging from 8000 to 45600 gallons and are made of Type 304 stainless steel. The drums and tanks were designed and fabricated to national regulations, codes and standards per procurement specifications for the Savannah River Site. The drums have had approximately 25 leakage failures over their 50+ years of use with the last drum failure occurring in 2003. The tanks have experienced no leaks to date. The failures in the drums have occurred principally near the bottom weld, which attaches the bottom to the drum sidewall. Failures have occurred by pitting, crevice and stress corrosion cracking and are attributable, in part, to the presence of chloride ions in the heavy water. Probable degradation mechanisms for the continued storage of heavy water were evaluated that could lead to future failures in the drum or tanks. This evaluation will be used to support establishment of an inspection plan which will include susceptible locations, methods, and frequencies for the drums and tanks to avoid future leakage failures.

36 MATERIALS SCIENCE↗

Quality Assurance Protocol for AFCI Advanced Structural Materials Testing

The objective of this letter is to inform you of recent progress on the development of advanced structural materials in support of advanced fast reactors and AFCI. As you know, the alloy development effort has been initiated in recent months with the procurement of adequate quantities of the NF616 and HT-UPS alloys. As the test alloys become available in the coming days, mechanical testing, evaluation of optimizing treatments, and screening of environmental effects will be possible at a larger scale. It is therefore important to establish proper quality assurance protocols for this testing effort in a timely manner to ensure high technical quality throughout testing. A properly implemented quality assurance effort will also enable preliminary data taken in this effort to be qualified as NQA-1 during any subsequent licensing discussions for an advanced design or actual prototype. The objective of this report is to describe the quality assurance protocols that will be used for this effort. An essential first step in evaluating quality protocols is assessing the end use of the data. Currently, the advanced structural materials effort is part of a long-range, basic research and development effort and not, as yet, involved in licensing discussions for a specific reactor design. After consultation with Mark Vance (an ORNL QA expert) and based on the recently-issued AFCI QA requirements, the application of NQA-1 quality requirements will follow the guidance provided in Part IV, Subpart 4.2 of the NQA-1 standard (Guidance on Graded Application of QA for Nuclear-Related Research and Development). This guidance mandates the application of sound scientific methodology and a robust peer review process in all phases, allowing for the data to be qualified for use even if the programmatic mission changes to include licensing discussions of a specific design or prototype. ORNL has previously implemented a QA program dedicated to GNEP activities and based on an appropriately graded application of NQA-1 requirements at the site. The current program is being revised to incorporate changes imposed through the recently revised AFCI Technical Integration Office QA requirements. Testing conducted under the AFCI QA program for the advanced structural materials effort shall incorporate the following quality assurance expectations: (1) personnel are adequately trained to perform assigned work; (2) activities are controlled to ensure consistency of results; (3) records necessary to substantiate how the work was performed are maintained (dedicated laboratory notebooks will be used); (4) the pedigree and traceability of the various tested materials are maintained throughout the described processes using consistent sample numbering and adequate record keeping; (5) equipment with the potential to affect the quality of the planned work is calibrated and maintained in accordance with applicable operating requirements. In addition, all reporting or related dissemination by ORNL personnel of the results of the work described in this subcontract shall be conducted in accordance with the requirements described or referenced in the ORNL Standards Based Management System subject area entitled Scientific and Technical Information. Reporting or publications at other institutions will be conducted in accordance with the requirements of that institution. Successful implementation of these protocols will provide a sound basis for future decisions and research. In addition, these steps will also help ensure that results can also be applied to licensing discussions at a future date.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines, April 2009 - December 2010

Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interimguidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. The Guidelines contained here are specifically written for parabolic trough collector systems with a heat-transport system using a high-temperature synthetic oil, but the basic principles are relevant to other CSP systems.

14 SOLAR ENERGY↗

Covered Product Categories (Fact Sheet)

Overview of the U.S. Department of Energy Federal Energy Management Program Energy-Efficient Product Procurement Program and its designated product category list.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improved Performance of an Air Cooled Condenser (ACC) Using SPX Wind Guide Technology at Coal-Based Thermoelectric Power Plants

This project added a new airflow enhancement technology to an existing ACC cooling process at a selected coal power plant. Airflow parameters and efficiency improvement for the main plant cooling process using the applied technology were determined and compared with the capabilities of existing systems. The project required significant planning and pre-test execution in order to reach the required Air Cooled Condenser system configuration for evaluation. A host Power Plant ACC system had to be identified, agreement finalized, and addition of the SPX ACC Wind Guide Technology completed on that site. Design of the modification, along with procurement, fabrication, instrumentation, and installation of the new airflow enhancement technology were executed. Baseline and post-modification cooling system data was collected and evaluated. The improvement of ACC thermal performance after SPX wind guide installation was clear. Testing of the improvement indicates there is a 5% improvement in heat transfer coefficient in high wind conditions and 1% improvement at low wind speed. The benefit increased with increasing wind speed. This project was completed on schedule and within budget.

01 COAL, LIGNITE, AND PEAT↗

Noise Performance Evaluation of the Candidate Digitizers for the MAJORANA DEMONSTRATOR

The noise performance evaluation of the two digitizer cards being considered for the MAJORANA DEMONSTRATOR (MJD) is presented in this document. The procurement of the data acquisition electronics for the MJD is scheduled to happen this year. At the time of writing this document, there are two candidate digitizer electronic boards. One aspect that is being considered by the collaboration is the feasibility of using the MJD for dark matter searches. The feasibility of using the MJD for this application is going to be dictated by the ability of the demonstrator to reach sub-keV energy resolution. One of the potential sources of noise in the MJD is the data acquisition system. This document will is concluded with a recommendation for the final digitizer board by comparing the noise performance of the two electronics systems. Noise parameters such as the effective number of bits, input range linearity and signal to noise ratio are experimentally determined. The two digitizer cards feature different on-board digital signal processing and these features are compared. The experimental set-up was also used to identify sources of noise. This paper describes these sources of noise in the data acquisition system, along with mitigation strategies. Issues such as grounding and wiring scheme have an impact in the overall data acquisition system performance and are discussed in detail. As a conclusion, the suitability of each one of the cards to become the back bone of the data acquisition system of the MJD is discussed.

99 GENERAL AND MISCELLANEOUS↗

Solar-Assisted Electric Vehicle Charging Station Interim Report

Oak Ridge National Laboratory (ORNL) has been awarded $6.8 million in the Department of Energy (DOE) American Recovery and Reinvestment Act (ARRA) funds as part of an overall $114.8 million ECOtality grant with matching funds from regional partners to install 125 solar-assisted Electric Vehicle (EV) charging stations across Knoxville, Nashville, Chattanooga, and Memphis. Significant progress has been made toward completing the scope with the installation of 25 solar-assisted charging stations at ORNL; six stations at Electric Power Research Institute (EPRI); and 27 stations at Nissan's Smyrna and Franklin sites, with three more stations under construction at Nissan's new lithium-ion battery plant. Additionally, the procurement process for contracting the installation of 34 stations at Knoxville, the University of Tennessee Knoxville (UTK), and Nashville sites is underway with completion of installation scheduled for early 2012. Progress is also being made on finalizing sites and beginning installations of 30 stations in Nashville, Chattanooga, and Memphis by EPRI and Tennessee Valley Authority (TVA). The solar-assisted EV charging station project has made great strides in fiscal year 2011. A total of 58 solar-assisted EV parking spaces have been commissioned in East and Middle Tennessee, and progress on installing the remaining 67 spaces is well underway. The contract for the 34 stations planned for Knoxville, UTK, and Nashville should be underway in October with completion scheduled for the end of March 2012; the remaining three Nissan stations are under construction and scheduled to be complete in November; and the EPRI/TVA stations for Chattanooga, Vanderbilt, and Memphis are underway and should be complete by the end of March 2012. As additional Nissan LEAFs are being delivered, usage of the charging stations has increased substantially. The project is on course to complete all 125 solar-assisted EV charging stations in time to collect meaningful data by the end of government fiscal year 2012. Lessons learned from the sites completed thus far are being incorporated and are proving to be invaluable in completion of the remaining sites.

14 SOLAR ENERGY↗

TV Energy Consumption Trends and Energy-Efficiency Improvement Options

The SEAD initiative aims to transform the global market by increasing the penetration of highly efficient equipment and appliances. SEAD is a government initiative whose activities and projects engage the private sector to realize the large global energy savings potential from improved appliance and equipment efficiency. SEAD seeks to enable high-level global action by informing the Clean Energy Ministerial dialogue as one of the initiatives in the Global Energy Efficiency Challenge. In keeping with its goal of achieving global energy savings through efficiency, SEAD was approved as a task within the International Partnership for Energy Efficiency Cooperation (IPEEC) in January 2010. SEAD partners work together in voluntary activities to: (1) ?raise the efficiency ceiling? by pulling super-efficient appliances and equipment into the market through cooperation on measures like incentives, procurement, awards, and research and development (R&D) investments; (2) ?raise the efficiency floor? by working together to bolster national or regional policies like minimum efficiency standards; and (3) ?strengthen the efficiency foundations? of programs by coordinating technical work to support these activities. Although not all SEAD partners may decide to participate in every SEAD activity, SEAD partners have agreed to engage actively in their particular areas of interest through commitment of financing, staff, consultant experts, and other resources. In addition, all SEAD partners are committed to share information, e.g., on implementation schedules for and the technical detail of minimum efficiency standards and other efficiency programs. Information collected and created through SEAD activities will be shared among all SEAD partners and, to the extent appropriate, with the global public.As of April 2011, the governments participating in SEAD are: Australia, Brazil, Canada, the European Commission, France, Germany, India, Japan, Korea, Mexico, Russia, South Africa, Sweden, the United Arab Emirates, the United Kingdom, and the United States. More information on SEAD is available from its website at http://www.superefficient.org/.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Turbo-Charging Research and Development

The objective of this project is to conduct analysis, design, procurement and test of a high pressure ratio, wide flow range, and high EGR system with two stages of turbocharging. The system needs to meet the stringent 2010MY emissions regulations at 20% + better fuel economy than its nearest gasoline competitor while allowing equivalent vehicle launch characteristics and higher torque capability than its nearest gasoline competitor. The system will also need to meet light truck/ SUV life requirements, which will require validation or development of components traditionally used only in passenger car applications. The conceived system is termed 'seriessequential turbocharger' because the turbocharger system operates in series at appropriate times and also sequentially when required. This is accomplished using intelligent design and control of flow passages and valves. Components of the seriessequential system will also be applicable to parallel-sequential systems which are also expected to be in use for future light truck/SUV applications.

02 PETROLEUM↗

Covered Product Categories (Fact Sheet)

List of Federal Energy Management Program (FEMP)-designated product categories for energy-efficient procurement requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using Supercomputers to Speed Execution of the CAISO/PLEXOS 33% RPS Study

The study's official title is 'ISO Study of Operational Requirements and Market Impacts at 33% Renewable Portfolio Standard (RPS).' The stated objectives are twofold: (1) identifying operational requirements and resource options to reliably operate the ISO-controlled grid under a 33% RPS in 2020; and (2) inform market, planning, and policy/regulatory decisions by the ISO, state agencies, market participants, and other stakeholders. The first of these objectives requires the hourly estimates of integration requirements, measured in terms of operational ramp, load following and regulation capacity and ramp rates, as well as additional capacity to resolve operational violations. It also involves consideration of other variables that affect the results, such as the impact of different mixes of renewable technologies, and the impact of forecasting error and variability. The second objective entails supporting the CPUC to identify long-term procurement planning needs, costs, and options, as well as informing other decisions made by the CPUC and state agencies. For the ISO itself this includes informing state-wide transmission planning needs for renewables up to a 33% RPS, and informing design of wholesale markets for energy and ancillary services to facilitate provision of integration capacities. The study is designed in two phases. The first (current) phase is focused on operational requirements and addressing these requirements with existing and new conventional fossil generation; for instance, gas turbines and/or combined cycle units. The second (planned) phase will address the same operational requirements with a combination of conventional fossil generation resources, new non-generation resources, and a renewable resource dispatch. There are seven different scenarios considered in the current phase: a 20% RPS reference case; four 33% RPS cases (a reference case, a high out-of-state case, a high distributed generation case, and a low load case); an alternative 27.5% RPS case; and an all-gas case (no new renewables after 2008). In addition, the CPUC is planning a new set of cases that will alter the anticipated sets of runs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Puncture Test Characterization of Glovebox Gloves

An experiment was conducted to determine the puncture resistance of 15 gloves that are used or proposed for use in the Tritium Facility at Savannah River Site (SRS). These data will serve as a baseline for characterization and may be incorporated into the glove procurement specification. The testing was conducted in agreement with ASTM D120 and all of the gloves met or exceeded the minimum requirements. Butyl gloves exhibited puncture resistance nearly 2.5 times the minimum requirements at SRS while Polyurethane was nearly 7.5x the minimum.

36 MATERIALS SCIENCE↗

Characterization of Tensile Strength of Glovebox Gloves

A task was undertaken to compare various properties of different glovebox gloves, having various compositions, for use in gloveboxes at the Savannah River Site (SRS). One aspect of this project was to determine the tensile strength (TS) of the gloves. Longitudinal tensile samples were cut from 15 different gloves and tensile tested. The stress, load, and elongation at failure were determined. All of the gloves that are approved for glovebox use and listed in the glovebox procurement specification met the tensile and elongation requirements. The Viton * compound gloves are not listed in the specification, but exhibited lower tensile strengths than permissible based on the Butyl rubber requirements. Piercan Polyurethane gloves were the thinnest samples and exhibited the highest tensile strength of the materials tested.

36 MATERIALS SCIENCE↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗