Search NASA⌕ Search

SEARCH · Search NASA

Results for “variable resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Electric Power Industry Challenges Due to Increasing Shares of Inverter-Based Resources in Power Systems

The large-scale integration of variable renewable energy technologies around the world is forcing electric power systems into an unprecedented transition. This paper reports on power grid modernization and reliability issues related to the planning and operation of power systems with high levels of variable renewable energy. The contents of this paper stem from recent qualitative research in the form of a summary of an industry survey. The technical feedback from the interviewed 37 industry experts helped us identify 12 key areas of potential concern, which are discussed throughout this paper.

power system operation↗

Modeling and Integration of Flexible Demand in Heat and Electricity Integrated Energy System

This paper is focused on utilizing customers' flexible energy demand, including both heat demand and electricity demand, to provide balancing resources and relieve the difficulties of integrating variable wind power with the combined heat and power. The integration of heat and electricity energy systems providing customers with multiple options for fulfilling their energy demand is described. Customer aggregators are introduced to supply downstream demand in the most economical way. Controlling customers' energy consumption behaviors enables aggregators to adjust their energy demand in response to supply conditions. Incorporating aggregators' flexible energy demand into the centralized energy dispatch model, a two-level optimization problem (TLOP) is first formed where the system operatormaximizes social welfare subject to aggregators' strategies, which minimize the energy purchase cost. Furthermore, the subproblems are linearized based on several reasonable assumptions. Optimal conditions of the subproblems are then transformed as energy demands to be described as explicit piecewise-linear functions of electricity prices corresponding to the demand bid curves. In this way, the TLOP is transformed to a standard optimization problem, which requires aggregators to only submit a demand bid to run the centralized energy dispatch program. All the parameters pertaining to the aggregators' energy consumption models are internalized in the bid curves. The proposed technique is illustrated in a modified testing system.

combined heat and power (CHP)↗

Advanced Methods for Incorporating Solar Energy Technologies into Electric Sector Capacity-Expansion Models: Literature Review and Analysis

Because solar power is a rapidly growing component of the electricity system, robust representations of solar technologies should be included in capacity-expansion models. This is a challenge because modeling the electricity system--and, in particular, modeling solar integration within that system--is a complex endeavor. This report highlights the major challenges of incorporating solar technologies into capacity-expansion models and shows examples of how specific models address those challenges. These challenges include modeling non-dispatchable technologies, determining which solar technologies to model, choosing a spatial resolution, incorporating a solar resource assessment, and accounting for solar generation variability and uncertainty.

14 SOLAR ENERGY↗

Cross-Border Electricity Trade between India and Sri Lanka: Impact on Power System Operations

Recent developments in South Asia have the potential to increase the incentives for cross-border energy trade (CBET) between India and Sri Lanka. India's surplus power, including from its rapid expansion of wind and solar generation, provides an incentive for it to increase investment returns through exports. Sri Lanka is considering options to increase its power supply, and CBET could alleviate the need for investments in new thermal generation capacity, while giving it access to India's large and diverse power system. Finally, CBET can facilitate renewable energy (RE) integration by allowing the two countries to more efficiently harness balancing resources and smooth out wind and solar variability over larger geographic areas. This study builds on several prior analyses of a potential high-voltage direct current transmission link between India and Sri Lanka. Uniquely, the study makes use of a detailed one-year, 30-minute resolution unit commitment and economic dispatch (UC&ED) model of both countries to examine the technical and economic impacts of CBET between India and Sri Lanka in the year 2025. The study finds that CBET, enabled by a 500-MW high voltage direct current transmission link, could generate annual production cost savings of USD 180 million and improve power system operations. Through better utilization of the most efficient generators, generation from relatively expensive natural gas plants in Sri Lanka is displaced by lower cost imports from India. In addition, increased flexibility through exports reduces RE curtailment in India's Southern region by 400 GWh annually. While the study captures many previously unconsidered intertemporal operational constraints, it does not provide a complete characterization of system operations with a high-voltage direct current interconnection. Additional work should include a dynamic analysis of system stability following interruptions to the direct current interconnection, an AC power flow analysis and consideration of any non-technical barriers to trade which might prevent the optimization of CBET between India and Sri Lanka at 30-minute timescales.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The sensitivity of the Fitch wind farm parameterization to a three-dimensional planetary boundary layer scheme

Abstract. Wind plant wake impacts can be estimated with a number of simulation methodologies, each with its own fidelity and sensitivity to model inputs. In turbine-free mesoscale simulations, hub-height wind speeds often significantly vary with the choice of a planetary boundary layer (PBL) scheme. However, the sensitivity of wind plant wakes to a PBL scheme has not been explored because, as of the Weather Research and Forecasting model v4.3.3, wake parameterizations were only compatible with one PBL scheme. We couple the Fitch wind farm parameterization with the new NCAR 3DPBL scheme and compare the resulting wakes to those simulated with a widely used PBL scheme. We simulate a wind plant in pseudo-steady states under idealized stable, neutral, and unstable conditions with matching hub-height wind speeds using two PBL schemes: MYNN and the NCAR 3DPBL. For these idealized scenarios, average hub-height wind speed losses within the plant differ between PBL schemes by between −0.20 and 0.22 m s−1, and correspondingly, capacity factors range between 39.5 %–53.8 %. These simulations suggest that PBL schemes represent a meaningful source of modeled wind resource uncertainty; therefore, we recommend incorporating PBL variability into future wind plant planning sensitivity studies as well as wind forecasting studies.

17 WIND ENERGY↗

Repetitive ERTS-1 observations of surface water variability along rivers and low-lying areas

The Earth Resources Technology Satellite, ERTS-1, provides an 18 day repetitive coverage capability and observations in the 0.8-1.1 micron spectral region where the contrast between water and adjacent surfaces is relatively large. Using these capabilities, observations in Virginia, Iowa, Missouri, and California have been acquired showing distinct patterns of flooding. Repetitive views of these areas before and after flooding have been examined, and flood mapping was performed. Sloughs in California can be seen to expand in terms of the area covered by standing water as time extends from summer to autumn. The results indicate that ERTS-1 imagery can be a valuable adjunct to conventional and aircraft survey methods for ascertaining the amount of area covered by water or affected by flooding.

Rango, A.↗

The experience factory: Can it make you a 5? or what is its relationship to other quality and improvement concepts?

The concepts of quality improvements have permeated many businesses. It is clear that the nineties will be the quality era for software and there is a growing need to develop or adapt quality improvement approaches to the software business. Thus we must understand software as an artifact and software as a business. Since the business we are dealing with is software, we must understand the nature of software and software development. The software discipline is evolutionary and experimental; it is a laboratory science. Software is development not production. The technologies of the discipline are human based. There is a lack of models that allow us to reason about the process and the product. All software is not the same; process is a variable, goals are variable, etc. Packaged, reusable, experiences require additional resources in the form of organization, processes, people, etc. There have been a variety of organizational frameworks proposed to improve quality for various businesses. The ones discussed in this presentation include: Plan-Do-Check-Act, a quality improvement process based upon a feedback cycle for optimizing a single process model/production line; the Experience Factory/Quality Improvement Paradigm, continuous improvements through the experimentation, packaging, and reuse of experiences based upon a business's needs; Total Quality Management, a management approach to long term success through customer satisfaction based on the participation of all members of an organization; the SEI capability maturity model, a staged process improvement based upon assessment with regard to a set of key process areas until you reach a level 5 which represents a continuous process improvement; and Lean (software) Development, a principle supporting the concentration of the production on 'value added' activities and the elimination of reduction of 'not value added' activities.

Basili, Victor R.↗

Optimization of Operations Resources via Discrete Event Simulation Modeling

The resource levels required for operation and support of reusable launch vehicles are typically defined through discrete event simulation modeling. Minimizing these resources constitutes an optimization problem involving discrete variables and simulation. Conventional approaches to solve such optimization problems involving integer valued decision variables are the pattern search and statistical methods. However, in a simulation environment that is characterized by search spaces of unknown topology and stochastic measures, these optimization approaches often prove inadequate. In this paper, we have explored the applicability of genetic algorithms to the simulation domain. Genetic algorithms provide a robust search strategy that does not require continuity and differentiability of the problem domain. The genetic algorithm successfully minimized the operation and support activities for a space vehicle, through a discrete event simulation model. The practical issues associated with simulation optimization, such as stochastic variables and constraints, were also taken into consideration.

Joshi, B.↗

Irrigation Water Demand Sensitivity to Climate Variability across the Contiguous United States

Climate variability is an important driver of irrigation water use in many regions. Efforts to anticipate climate change impacts on future water availability can benefit from understanding how irrigation water demand has responded to these drivers to date. Here we apply satellite derived data, meteorological reanalysis, an advanced land surface model, and available state level reports to quantify irrigation demand sensitivities to temperature and precipitation across the Contiguous United States, for the period of 2002-2017. As expected, strong negative correlations are found between precipitation and irrigation withdrawals, both simulated and reported. Temperature sensitivities, however, vary by region and season, as do the interactive effects of temperature and precipitation on irrigation. Climate-induced irrigation variability is largest in transitional climate zones. These transitional zones are generally separate from the regions where rates of irrigation withdrawals are greatest, such that climate-induced variability in irrigation demand represents a water resource consideration that is distinct from chronic over pumping.

Wanshu Nie↗

Experimentation of Synchronous and Variable Speed Small Scale Hydropower Systems

Hydropower is the one of the oldest renewable energy technologies and is wrongly thought of today as having little room to grow. The opportunity for new hydropower capacity is immense through both technology advancement and run-of-river new stream reach projects. Despite the age of hydropower, a divide in opinion is forming regarding how we should proceed with generating power from smaller undisturbed rivers and canals. Hydropower generation techniques have been primarily fixed speed since its inception in the late 19th century, but it seems as though variable speed generation could hold the key to more efficiently utilizing new stream reach resources. This research aims to provide a cost benefit analysis of fixed speed vs. variable speed hydropower generation topologies, and distinguish the performance advantages that variable speed generation could hold in other aspects of hydropower. Simulation results are validated with hardware.

13 HYDRO ENERGY↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma: Preprint

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Techno-Economic Analysis for a Potential Geothermal District Heating System in Tuttle, Oklahoma

Geothermal deep direct use (DDU) has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for a large-scale and variable heat demand. The National Renewable Energy Laboratory (NREL) and University of Oklahoma evaluated the feasibility of a geothermal district heating (GDH) and cooling system in two schools and 250 houses by utilizing existing oil and gas (O&G) wells in Tuttle, Oklahoma. Heating and cooling demand in the two schools and a typical single-family house were modeled using EnergyPlus building energy simulation software. The modeling results indicated that annual heating demand in two schools and 250 houses is approximately 2.61 GWhth, and cooling demand in the two schools is approximately 2.65 GWhth. In this scope, the techno-economic analysis (TEA) was conducted using the GEOPHIRES tool combined with the TOUGH2 reservoir simulator. The reservoir performance, including geothermal heat production capacity, was modeled by the reservoir simulator TOUGH2. Then, levelized cost of heat (LCOH) was calculated using GEOPHIRES version 3.0, which includes new features such as hourly heat load optimization and peak performance evaluation. Geothermal reservoir temperature was estimated as 90.5 degrees C at a total depth of 3.3 km by the regional average temperature gradient of 22.8 degrees C/km and validated by cation geothermometer calculations. Four production scenarios with two different well configurations and two different heat load profiles have been developed for well flow rates ranging between 3.1 kg/s and 9.3 kg/s. The LCOH of the district heating and cooling system was calculated between $95 and $210/MWh ($28/MMBtu to $62/MMBtu) for four different production scenarios. Typical natural gas prices for residential customers in Oklahoma have ranged from 9 to 19 $/MMBtu over the past decade, which indicates a challenge for deployment of such a GDH system.

deep direct-use↗

Impacts of Regional Coordination on Transmission Needs for Power System Resource Adequacy [Slides]

Resource adequacy (RA) is an important component of bulk power system reliability that addresses whether there are sufficient resources available to meet electricity demand at all times. RA analysis is used to assess whether the planned power system will provide reliable electricity to consumers while accounting for equipment outages, weather variability, and load uncertainty. Coordination between regions can enable resource sharing to meet RA needs if sufficient transmission capacity exists. Transmission's role in RA coordination can be particularly pronounced for large power systems like the U.S. electricity grid which contains geographically diverse demand and weather-dependent resources. Depending on the level of coordination desired, existing inter-regional transmission capacity may not be sufficient. This study is designed to assess optimal pathways for the development of inter-regional transmission in the U.S. under varying levels of RA coordination. Results can inform long-term grid infrastructure planning and provide insights into potential benefits of greater coordination for generation and transmission planning between regional U.S. power systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing

The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

Johnson, Kenneth L.↗

Understanding Inter-Annual Variability of PV Energy Production in the Contiguous United States

Year-to-year variability of photovoltaic (PV) generation is an important factor for project financing as well as for modeling the reliability and resource adequacy of power systems. In this work, we analyze inter-annual variability of PV generation across the contiguous United States using the National Solar Radiation Database (NSRDB) from 1998 to 2014. We compare the estimated PV generation from the typical meteorological year (TMY) against the long-term mean, and find that on average the TMY tends to overpredict estimated PV production. However, we also found significant regional bias and spatial clustering in that comparison, such that there are many regional pockets of underprediction as well. Finally, we show that there is not a single year of data that most closely approximates a representative 'resource year' for all regions of the United States. These results point to the need to understand inter-annual variability at individual sites and to be aware of the shortcomings of using TMY or a single year of data for project or grid modeling.

14 SOLAR ENERGY↗

Assessing the Economic Value of Underground Thermal Storage for Hybrid Geothermal Power

Solutions are needed to address resource adequacy in the electric power system for highly decarbonized systems. The storage duration, the length of time a storage device can provide continuous output at its rated capacity, must be sufficient to receive full credit toward resource adequacy. Longer peaks and high fractions of variable renewable generation have increased the required duration to potentially seasonal durations. Underground Thermal Energy Storage (UTES) can be adapted to a hybrid storage power plant or heating and cooling applications to satisfy the need for long-duration storage. In this study, we use the Renewable Energy Deployment System (ReEDS) capacity expansion model to evaluate the increase in value for an enhanced geothermal system (EGS) resources by adding UTES. In modeled scenarios, using geothermal without storage as a baseline we compare the increase in economic value for plants with a range of storage characteristics. The added value of a hybrid storage plant changes depending on assumptions including the length of storage duration, efficiency, and ability to charge storage from the grid during periods of low energy prices. Relating proposed characteristics for geothermal UTES hybrids to the modeled economic value provides insight into economically viable costs for developing UTES as well as what combination of technology characteristics and future energy and policy assumptions drive significant value increases.

capacity expansion model↗

Photovoltaic Plant and Battery Energy Storage System Integration at NREL's Flatirons Campus

Although utility-scale solar photovoltaic (PV) power plants are becoming a cost-effective energy resource, there is belief within the energy industry that the increasing penetrations of PV technologies could potentially impact grid reliability. This is due to the variability across timescales, the forecast uncertainty of the solar energy resource, and the impacts on both distribution and transmission systems. This can cause utilities to severely limit PV installations or to assign PV integration costs when considering a least-cost portfolio of resources. As California and other regions in the United States are marching toward fulfilling - and probably exceeding - their renewables portfolio standards goals, grid operators are beginning to face operational challenges that could have implications for existing renewable and nonrenewable generators and that will shape opportunities for future projects. In this work, we focused on developing controls and conducting demonstrations for AC-coupled PV-battery energy storage systems (BESS) in which PV and BESS are collocated and share a point of common coupling (PCC).

14 SOLAR ENERGY↗

Deep Direct-Use for Industrial Applications: Producing Chilled Water for Gas-Turbine Inlet Cooling

Direct use of deep, low-temperature geothermal resources is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are historically small-scale, variable-demand projects. This project assesses the feasibility of geothermal energy integration in natural-gas combined cycle power stations in the Sabine Uplift and Gulf Coast regions of Texas. The low-grade geothermal resource is tapped to drive absorption chillers for production of chilled water at 5-10 degrees C (41-50 degrees F). This chilled water is stockpiled and dispatched to provide turbine inlet cooling (TIC) at the inlet to the compressor of a natural-gas combined cycle power plant, thereby boosting power production during periods of high temperature and high-power demand. This presentation focuses on the system design related to geothermal well-site selection (proximity vs. resource quality), absorption chiller size and location, chilled-water storage capacity, and dispatch logic to realize the maximum financial benefit.

15 GEOTHERMAL ENERGY↗