Search NASA⌕ Search

SEARCH · Search NASA

Results for “Administration and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Taking the Risk Out of Risk Assessment

The ability to understand risks and have the right strategies in place when risky events occur is essential in the workplace. More and more organizations are being confronted with concerns over how to measure their risks or what kind of risks they can take when certain events transpire that could have a negative impact. NASA is one organization that faces these challenges on a daily basis, as effective risk management is critical to the success of its missions especially the Space Shuttle missions. On July 29, 1996, former NASA Administrator Daniel Goldin charged NASA s Office of Safety and Mission Assurance with developing a probabilistic risk assessment (PRA) tool to support decisions on the funding of Space Shuttle upgrades. When issuing the directive, Goldin said, "Since I came to NASA [in 1992], we've spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk." Work on the PRA tool began immediately. The resulting prototype, the Quantitative Risk Assessment System (QRAS) Version 1.0, was jointly developed by NASA s Marshall Space Flight Center, its Office of Safety and Mission Assurance, and researchers at the University of Maryland. QRAS software automatically expands the reliability logic models of systems to evaluate the probability of highly detrimental outcomes occurring in complex systems that are subject to potential accident scenarios. Even in its earliest forms, QRAS was used to begin PRA modeling of the Space Shuttle. In parallel, the development of QRAS continued, with the goal of making it a world-class tool, one that was especially suited to NASA s unique needs. From the beginning, an important conceptual goal in the development of QRAS was for it to help bridge the gap between the professional risk analyst and the design engineer. In the past, only the professional risk analyst could perform, modify, use, and perhaps even adequately understand PRA. NASA wanted to change this by developing a PRA tool that would be friendlier, more understandable, and more useful to the broader engineering community. This concept ultimately led to the look, feel, and functionality that QRAS has today.

Source record↗

Decision Support Methods and Tools

This paper is one of a set of papers, developed simultaneously and presented within a single conference session, that are intended to highlight systems analysis and design capabilities within the Systems Analysis and Concepts Directorate (SACD) of the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC). This paper focuses on the specific capabilities of uncertainty/risk analysis, quantification, propagation, decomposition, and management, robust/reliability design methods, and extensions of these capabilities into decision analysis methods within SACD. These disciplines are discussed together herein under the name of Decision Support Methods and Tools. Several examples are discussed which highlight the application of these methods within current or recent aerospace research at the NASA LaRC. Where applicable, commercially available, or government developed software tools are also discussed

Green, Lawrence L.↗

Searching Across the International Space Station Databases

Data access in the enterprise generally requires us to combine data from different sources and different formats. It is advantageous thus to focus on the intersection of the knowledge across sources and domains; keeping irrelevant knowledge around only serves to make the integration more unwieldy and more complicated than necessary. A context search over multiple domain is proposed in this paper to use context sensitive queries to support disciplined manipulation of domain knowledge resources. The objective of a context search is to provide the capability for interrogating many domain knowledge resources, which are largely semantically disjoint. The search supports formally the tasks of selecting, combining, extending, specializing, and modifying components from a diverse set of domains. This paper demonstrates a new paradigm in composition of information for enterprise applications. In particular, it discusses an approach to achieving data integration across multiple sources, in a manner that does not require heavy investment in database and middleware maintenance. This lean approach to integration leads to cost-effectiveness and scalability of data integration with an underlying schemaless object-relational database management system. This highly scalable, information on demand system framework, called NX-Search, which is an implementation of an information system built on NETMARK. NETMARK is a flexible, high-throughput open database integration framework for managing, storing, and searching unstructured or semi-structured arbitrary XML and HTML used widely at the National Aeronautics Space Administration (NASA) and industry.

Maluf, David A.↗

Global Precipitation Measurement (GPM) Safety Inhibit Timeline Tool

The Global Precipitation Measurement (GPM) Observatory is a joint mission under the partnership by National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA), Japan. The NASA Goddard Space Flight Center (GSFC) has the lead management responsibility for NASA on GPM. The GPM program will measure precipitation on a global basis with sufficient quality, Earth coverage, and sampling to improve prediction of the Earth's climate, weather, and specific components of the global water cycle. As part of the development process, NASA built the spacecraft (built in-house at GSFC) and provided one instrument (GPM Microwave Imager (GMI) developed by Ball Aerospace) JAXA provided the launch vehicle (H2-A by MHI) and provided one instrument (Dual-Frequency Precipitation Radar (DPR) developed by NTSpace). Each instrument developer provided a safety assessment which was incorporated into the NASA GPM Safety Hazard Assessment. Inhibit design was reviewed for hazardous subsystems which included the High Gain Antenna System (HGAS) deployment, solar array deployment, transmitter turn on, propulsion system release, GMI deployment, and DPR radar turn on. The safety inhibits for these listed hazards are controlled by software. GPM developed a "pathfinder" approach for reviewing software that controls the electrical inhibits. This is one of the first GSFC in-house programs that extensively used software controls. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As part of this process a new tool "safety inhibit time line" was created for management of inhibits and their controls during spacecraft buildup and testing during 1& Tat GSFC and at the Range in Japan. In addition to understanding inhibits and controls during 1& T the tool allows the safety analyst to better communicate with others the changes in inhibit states with each phase of hardware and software testing. The tool was very useful for communicating compliance with safety requirements especially when working with a foreign partner.

Dion, Shirley↗

Initial Concept of Operations for Full Management by Trajectory

This document describes Management by Trajectory (MBT), a concept for future air traffic management (ATM) in which flights are assigned four-dimensional trajectories (4DTs) through a negotiation process between the Federal Aviation Administration (FAA) and flight operators that respects the flight operator's goals while complying with National Airspace System (NAS) constraints.

Fernandes, Alicia D.↗

Simulation of a Representative Future Trajectory-Based Operations Environment

Trajectory-Based Operations in the National Airspace System is a key aspect of advanced air traffic management research. Trajectory-Based Operations focuses on modernizing the current operating paradigm to increase efficiency, predictability, resilience, and flexibility while migrating toward greater operational autonomy across the airspace. Research conducted at the National Aeronautics and Space Administration supports the transition from current airspace operations to Trajectory-Based Operations targeting a 2035-2045 implementation timeframe. Simulation scenarios that demonstrate a representative Trajectory-Based Operations environment in that timeframe, and enable the evaluation of advanced airborne tools such as strategic airborne trajectory management services, are necessary to support this research effort. This report describes characteristics and assumptions made about the future operating environment that were applied to a scenario development methodology to study a representative 2040 Trajectory-Based Operations environment in a simulation use case. This report also includes descriptions of the study design and analysis approach, discussion of the simulation results, and application of these scenarios to future research activities.

Trajectory Based Operations↗

A Study to Estimate the Effectiveness of Visual Testing Training for Aviation Maintenance Management

The Air Commerce Act of 1926 set the beginning for standards in aviation maintenance. Even after deregulation in the late l970s, maintenance standards and requirements still have not changed far from their initial criteria. After a potential candidate completes Federal Aviation Administration training prerequisites, they may test for their Airframe and Powerplant (A&P) certificate. Performing maintenance in the aviation industry for a minimum of three years, the technician may then test for their Inspection Authorization (IA). After receiving their Airframe and Powerplant certificate, a technician is said to have a license to perform. At no time within the three years to eligibility for Inspection Authorization are they required to attend higher-level inspection training. What a technician learns in the aviation maintenance industry is handed down from a seasoned technician to the new hire or is developed from lessons learned on the job. Only in Europe has the Joint Aviation Authorities (JAA) required higher-level training for their aviation maintenance technicians in order to control maintenance related accidents (Lu, 2005). Throughout the 1990s both the General Accounting Office (GAO) and the National Transportation Safety Board (NTSB) made public that the FAA is historically understaffed (GAO, 1996). In a safety recommendation the NTSB stated "The Safety Board continues to lack confidence in the FAA's commitment to provide effective quality assurance and safety oversight of the ATC system (NTSB, 1990)." The Federal Aviation Administration (FAA) has been known to be proactive in creating safer skies. With such reports you would suspect the FAA to also be proactive in developing more stringent inspection training for aviation maintenance technicians. The purpose of this study is to estimate the effectiveness of higher-level inspection training, such as Visual Testing (VT) for aviation maintenance technicians, to improve the safety of aircraft and to make recommendations to management with regard to the value of such training.

Law, Lewis Lyle↗

Space manufacturing facilities: Space colonies; Proceedings of the Princeton Conference, Princeton University, Princeton, N.J., May 7-9, 1975

Reports submitted to the conference encompass: administration and law relating to inhabited space facilities and colonies; space manufacturing and processing; organization and construction of space habitats and management of space colony farms; winning and acquisition of lunar and asteroidal materials for sustaining autonomous space colonies. Attention is given to trajectories between earth, low earth orbit, earth-moon libration points (specifically L5), circumlunar parking orbits, and trajectories in translunar space; effects of low gravity and zero gravity on human physiology and on materials processing; architecture and landscaping for space colonies; closed ecosystems of space colonies. Varieties of human cultures and value hierarchies around the earth are examined for broader perspectives on the social organization of space colonies.

Grey, J.↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation, volume 1

This document is the Executive Summary of a technical report on a probabilistic risk assessment (PRA) of the Space Shuttle vehicle performed under the sponsorship of the Office of Space Flight of the US National Aeronautics and Space Administration. It briefly summarizes the methodology and results of the Shuttle PRA. The primary objective of this project was to support management and engineering decision-making with respect to the Shuttle program by producing (1) a quantitative probabilistic risk model of the Space Shuttle during flight, (2) a quantitative assessment of in-flight safety risk, (3) an identification and prioritization of the design and operations that principally contribute to in-flight safety risk, and (4) a mechanism for risk-based evaluation proposed modifications to the Shuttle System. Secondary objectives were to provide a vehicle for introducing and transferring PRA technology to the NASA community, and to demonstrate the value of PRA by applying it beneficially to a real program of great international importance.

Fragola, Joseph R.↗

Crystal Growth Furnace System Configuration and Planned Experiments on the Second United States Microgravity Laboratory Mission

The Crystal Growth Furnace (CGF) is currently undergoing modifications and refurbishment and is currently undergoing modifications and refurbishment and is manifested to refly on the Second United States Microgravity Laboratory (USML-2) mission scheduled for launch in September 1995. The CGF was developed for the National Aeronautics and Space Administration (NASA) under the Microgravity Science and Applications Division (MSAD) programs at NASA Headquarters. The refurbishment and reflight program is being managed by the Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Funding and program support for the CGF project is provided to MSFC by the office of Life and Microgravity Sciences and Applications at NASA Headquarters. This paper presents an overview of the CGF system configuration for the USML-2 mission, and provides a brief description of the planned on-orbit experiment operation.

Srinivas, R.↗

Application of Fault Management Theory to the Quantitative Selection of a Launch Vehicle Abort Trigger Suite

This paper describes the quantitative application of the theory of System Health Management and its operational subset, Fault Management, to the selection of abort triggers for a human-rated launch vehicle, the United States' National Aeronautics and Space Administration's (NASA) Space Launch System (SLS). The results demonstrate the efficacy of the theory to assess the effectiveness of candidate failure detection and response mechanisms to protect humans from time-critical and severe hazards. The quantitative method was successfully used on the SLS to aid selection of its suite of abort triggers.

Lo, Yunnhon↗

Application of Fault Management Theory to the Quantitative Selection of a Launch Vehicle Abort Trigger Suite

This paper describes the quantitative application of the theory of System Health Management and its operational subset, Fault Management, to the selection of Abort Triggers for a human-rated launch vehicle, the United States' National Aeronautics and Space Administration's (NASA) Space Launch System (SLS). The results demonstrate the efficacy of the theory to assess the effectiveness of candidate failure detection and response mechanisms to protect humans from time-critical and severe hazards. The quantitative method was successfully used on the SLS to aid selection of its suite of Abort Triggers.

Lo, Yunnhon↗

Foundations of Supply Chain Management for Space Application

Supply Chain Management (SCM) is a key piece of the framework for America's space technology investment as the National Aeronautics and Space Administration (NASA), the aerospace industry, and international partners embark on a bold new vision of human and robotic space exploration beyond Low-Earth-Orbit (LEO). This type of investment is driven by the Agency's need for cost efficient operational support associated with, processing and operating space vehicles and address many of the biggest operational challenge including extremely tight funding profiles, seamless program-to-program transition activities and the reduction of the time gap with human spaceflight capabilities in the post-Shuttle era. An investment of this magnitude is a multiyear task and must include new patterns of thought within the engineering community to respect the importance of SCM and the integration of the material and information flow. Experience within the Department of Defense and commercial sectors which has shown that support cost reductions and or avoidances of upwards to 35% over business as usual are achievable. It is SCM that will ultimately bring the solar system within the economic sphere of our society.

supply chain managemen↗

ATD-2 Phase 3 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. ATD-2 Phase 1 & 2 have successfully demonstrated new technologies developed to manage the IADS capabilities at a single airport. The Phase 3 builds upon Phases 1 and 2 by extending the capabilities to a Metroplex environment where multiple airports are interacting and competing for resources at the terminal boundary. This document describes the metrics used to inform the flight operators, Air Traffic Control (ATC) tower, FAA, and even broader aviation community about opportunities to reroute aircraft and the metrics used to assess the performance of the ATD-2 Phase 3 system including benefits. This document provides definitions and detailed calculation methods of identified Phase 3 benefit metrics such as OFF Delay Savings, IN Delay Savings, and Aggregate System-Wide Savings. This document also describes the mechanism to translate delay savings metrics into fuel and emissions savings.

ATD-2 Phase 3↗

GRACE Follow-On Early In-Flight Challenges

The Gravity Recovery and Climate Experiment (GRACE) Follow-On Mission is a successor to the highly successful GRACE Mission, which operated from 2002-2017. It is a partnership between the National Aeronautics and Space Administration (NASA) and the German Research Center for Geosciences, GeoForschungsZentrum Potsdam (GFZ). Under this partnership, the United States provides the project management, satellites and instruments, Germany provides the launch and mission operations. The partners share responsibilities for producing science data products. GRACE Follow-On, like its predecessor GRACE, consists of twin satellites which fly in a tandem formation at a near polar orbit separated by about 200 km along track. The mission continues the work of GRACE by tracking the movement of water, observing changes in ice sheets and sea level to provide a unique view of Earth’s changing climate. The satellites were launched May 22, 2018 from Vandenberg Air Force Base, in California, on a SpaceX Falcon 9 Rocket. Launch and Early Operations (LEOP) were completed within the first week and on-orbit commissioning proceeded for the next 8 months. The GRACE Follow-On mission is designed to last five years. The mission operations team has had to address several technical challenges early into the planned five-year mission life. The commissioning period was extended by 5 months to successfully address these issues, making it possible for the mission to meet key requirements for delivery and quality of the science data products. This paper will address the challenges faced by GRACE Follow-On and the actions taken by the mission operations team to continue to safely operate the mission.

Witkowski, M.M.↗

Air Traffic Management TestBed: Non-Java Programming Language Support

The Air Traffic Management (ATM) TestBed provides a simple and easy capability to connect high-fidelity simulations for supporting National Aeronautics and Space Administration (NASA) and community research. Simulation components are connected to the TestBed via plugin adapters which can be publishers, subscribers, or both. Though the plugin adapters are written in Java programming language, connectivity between TestBed and non-Java applications are supported. This document describes procedures to access the TestBed data exchange messages using external applications such as MATLAB and web browsers, as well as non-Java programming language such as C, Python, and JavaScript. Example simulation layouts are presented. Step-by-step instructions to run adapters, and to connect to the external tools are also provided.

Chok Fung Lai↗

Interim Measures Report for the Headquarters Building Area Location of Concern (LOC) 2E East SWMU 104 John F. Kennedy Space Center, Florida

The Hazardous and Solid Waste Amendment portion of the National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) Permit issued by the Florida Department of Environmental Protection (FDEP), requires identification and evaluation of all known Solid Waste Management Units (SWMUs) and Locations of Concern (LOCs) located on Kennedy Space Center (KSC) property. The KSC Headquarters Building Area (KHQA) has been identified as SWMU 104 under KSC's RCRA Program. This report summarizes the Interim Measure (IM) conducted by Geosyntec Consultants (Geosyntec) for NASA under Indefinite Delivery Indefinite Quantity Contract NNK12CA13B at the KHQA to mitigate potential exposure to polychlorinated biphenyl (PCB)-affected media at the eastern side of LOC 2E. The IM activities were conducted in June and July 2015 to remediate PCBs above the FDEP Residential Direct-Exposure (R-) Soil Cleanup Target Level (SCTL) of 0.5 milligram per kilogram (mg/kg) established by Chapter 62-777, Florida Administrative Code. The IM was performed in accordance with the IM Work Plan (IMWP) approved by the FDEP, dated August 2012. IM activities were conducted in accordance with the KSC Generic PCB Work Plan (NASA 2007).

Sager, Eric D.↗

Safety Risk Knowledge Elicitation in Support of Aeronautical R and D Portfolio Management: A Case Study

Aviation is a problem domain characterized by a high level of system complexity and uncertainty. Safety risk analysis in such a domain is especially challenging given the multitude of operations and diverse stakeholders. The Federal Aviation Administration (FAA) projects that by 2025 air traffic will increase by more than 50 percent with 1.1 billion passengers a year and more than 85,000 flights every 24 hours contributing to further delays and congestion in the sky (Circelli, 2011). This increased system complexity necessitates the application of structured safety risk analysis methods to understand and eliminate where possible, reduce, and/or mitigate risk factors. The use of expert judgments for probabilistic safety analysis in such a complex domain is necessary especially when evaluating the projected impact of future technologies, capabilities, and procedures for which current operational data may be scarce. Management of an R&D product portfolio in such a dynamic domain needs a systematic process to elicit these expert judgments, process modeling results, perform sensitivity analyses, and efficiently communicate the modeling results to decision makers. In this paper a case study focusing on the application of an R&D portfolio of aeronautical products intended to mitigate aircraft Loss of Control (LOC) accidents is presented. In particular, the knowledge elicitation process with three subject matter experts who contributed to the safety risk model is emphasized. The application and refinement of a verbal-numerical scale for conditional probability elicitation in a Bayesian Belief Network (BBN) is discussed. The preliminary findings from this initial step of a three-part elicitation are important to project management practitioners as they illustrate the vital contribution of systematic knowledge elicitation in complex domains.

Shih, Ann T.↗