Search NASA⌕ Search

SEARCH · Search NASA

Results for “CLOSURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Lawrence Livermore National Laboratory Ultrafast Closure Valve Use Cases

The purpose of this report is to document several use cases of the Ultra-Fast Closure Valve System (UCVS) at the Joint Actinide Shock Physics Experimental Research (JASPER) facility. The goal is to clearly identify the use cases so that an explosive hazard classification may be assigned.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, NNSS, NV (CY2020, Revision 1)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches.

54 ENVIRONMENTAL SCIENCES↗

CY2020 Annual Closure Monitoring Report for Corrective Action Unit 98: Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2020–December 2020, Revision 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 98, Frenchman Flat (FF), at the Nevada National Security Site (NNSS), Nevada (Figure 1-1). This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]); and verification of use restrictions (URs), institutional controls, and water use. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada (NNSA/NFO, 2016) and its ensuing Records of Technical Change (ROTCs).

54 ENVIRONMENTAL SCIENCES↗

Characterization of Tank 9H Dissolution Batches in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 1 Preparations

Savannah River Remediation (SRR) is currently preparing the first batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A will consist of dissolved saltcake from Tank 9H. Two batches of salt (Batch 1A and Batch 1B) have been dissolved in Tank 9H and subsequently transferred to Tank 10H to prepare Batch 1 for TCCR 1A. Savannah River National Laboratory (SRNL) received samples from each batch of dissolved salt prior to transfer for characterization. SRNL received both a surface and a variable depth sample from Batches 1A and 1B. In both cases no solids were observed in the surface sample, but were observed in the depth sample. For Batch 1A the variable depth sample was only slightly cloudy, while for Batch 1B the variable depth sample contained a significant amount (10.14 wt%) of solids. The solids were determined to be primarily aluminum containing phases, with only a small fraction (0.22 wt%) being sludge solids. In general, the samples from Batch 1A were more concentrated salt solutions than Batch 1B, with sodium concentrations of 8.53 and 8.57 M for the surface and filtered depth samples in Batch 1A, respectively. The sodium concentrations in Batch 1B samples ranged from 4.27 M for the surface sample to 7.57 M for the depth sample filtrate, indicating some stratification within the tank. The 137 Cs activity as well as the total Cs concentration in the filtered Batch 1A depth sample were approximately double the activity and concentration measured in the filtrate from the Batch 1B depth sample. The total Cs concentration in the Batch 1A depth sample filtrate was 22.4 mg/L, while for the Batch 1B depth sample filtrate the total Cs concentration was calculated to be 12.0 mg/L. These Cs concentrations are significantly higher than was measured in Batches 1-3 from Tank 10H dissolved saltcake which was previously processed through the original TCCR unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial use of Nek5000/Cardinal to improve closure models in Pronghorn

Heat transfer coefficient closure models for pebble bed reactors are built using a data-driven approach by leveraging the capabilities of an Evolutionary Algorithm entitled Particle Swarm Optimization (PSO). In the present work, the Computational Fluid Dynamics code nekRS was used in order to collect the high-fidelity flow data for a core with 1,568 pebbles. To characterize the heat transfer, multiple concentric regions were considered to extract the physical quantities of interest, e.g./ the Reynolds number. The PSO algorithm is employed as part of an inverse problem targeting determine what are the coefficients for a Nusselt number correlation to match the collected data. Such correlation should follow any given format that is defined a priori. Finally, two correlations are proposed, one with an implicit dependence on the pebbles’ wall temperatures and another expressed as a fully explicit correlation depending on the flow conditions and the position within the core. Anyway, given the generic nature of the proposed approach, correlations following different formats could be tested. Preliminary results for the high-fidelity simulation of a fast MSR core are presented. The target Reynolds number is currently 20K, with the expectation that this will increase, pending the availability of further computational resources. These simulations will be used to inform lower fidelity models, including a coarse CFD turbulence model in Pronghorn. Additionally, they will serve as a reference for the RANS models in Nek5000/NekRS.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Final Report for Tech-X Corporations’s contribution to Enhancing Understanding of High Energy Density Plasmas from Wire Array and Solid Liner Implosions Using Fluid Modeling with Kinetic Closures

Recent results from experiments and simulation of magnetically driven pulsed power liners have explored the role of the early-time electrothermal instability in the evolution of the magneto-Rayleigh-Taylor instability. Our focus will be on understanding the development of such instabilities and the potential stabilization mechanisms via electron thermal conduction, viscosity, and large magnetic fields which we expect could play a significant role in supporting the success of the MagLIF program. Experiments have shown that studies of high-energy density plasmas from wire-array implosions require physics modeling that goes well beyond simple models such as ideal magnetohydrodynamics. The goal of this work is to provide increased understanding of these experiments by employing simulations with a multi-fluid extended-MHD model which uses kinetic closures for thermal conduction, resistivity and viscosity. We will use codes easily available to the wider research community, including university students, with a secondary goal of providing the community with well-benchmarked tools capable of advanced modeling of high-energy-density plasmas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterization of Tank 9H Salt Dissolution Batch 2A in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Remediation (SRR) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The first batch of salt to make up Batch 2 (Batch 2A) has been dissolved in Tank 9H and will later be transferred to Tank 10H. Savannah River National Laboratory (SRNL) received samples from the batch of dissolved salt for characterization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from November 2021 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from Batch 1 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each waste supernate batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 11H Samples from Tank Closure Cesium Removal 1A (TCCR 1A) Batch 1

Savannah River Mission Completion (SRMC) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR 1A unit processes dissolved salt fed from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST, IONSIV TM R9120-B, 30x60) and the effluent is then discharged to Tank 11H. In support of the TCCR 1A program, SRNL analyzed samples taken from Tank 11H (without tank mixing) before, during, and at the completion of TCCR 1A Batch 1 processing. Tank 11H serves as the receipt tank for the filtered and cesium removed product from the TCCR 1A system. Processing of Batch 1 commenced on January 13, 2022 and completed on February 17, 2022, after processing approximately 70,100 gallons. A pre-production sample was collected from the heel remaining in Tank 11H just before Batch 1 processing began. In addition, five interim surface samples were collected from Tank 11H during processing, and both a surface and a variable depth sample (VDS, ~7” from tank bottom) were collected just after processing completed. Analysis of all samples included density and gamma spectroscopy, in addition to a more comprehensive suite of analytes for the pre- and post-production samples. The density of the pre-production sample was the highest of all samples measured and was then observed to decrease for the first two interim samples, followed by becoming fairly consistent for the remainder of the samples (~1.3 g/mL). The density of 1.3 g/mL is similar to the density measured for one of the three Tank 10H qualification samples (HTF-10-21-126). The 137 Cs activity was found to decrease as additional decontaminated effluent from the TCCR columns was added to Tank 11H during processing; however, an increase in activity was observed during periods of no processing which can be attributed to leaching of 137 Cs from the known solids in Tank 11H. The Cs isotope concentrations in the Tank 11H postproduction surface sample were determined to be 99.7-99.8% lower than the concentrations measured in the Tank 10H feed as measured by mass spectrometry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3013 Inner Container Closure Weld Region (ICCWR) Characterization by Wide Area 3D Measurement System (WAMS) Analysis (FY21 Progress Report)

As part of the 3013 Surveillance Program, through-wall penetration from stress corrosion cracking (SCC) of the 3013 inner containers has been identified as the most credible condition for failure withing the 50- years lifetime. Chlorides contained in Pu-bearing material, together with intra-canister humidity levels, metallurgical conditions, and internal stresses have been found to produce corrosion in the Inner Container Closure Weld Region (ICCWR) of the 3013 canister system. A Laser Confocal Microscope (LCM) is used as part of the 3013 Surveillance Program protocol to identify the prevalence of corrosion and corrosionrelated cracking in the ICCWR2. With the LCM, a close visual examination is made of the ICCWR surface along with measurements of corrosion-related features. LCM inspections produce immense amounts of image data that is time intensive to analyze. There is also a 9-year backlog of images, with approximately 49 canisters that must be evaluated. To expedite data analysis and reduce the amount of generated data, a Wide Area 3D Measurement System (WAMS) microscope has been added to the examination protocol. Although WAMS is a lower resolution microscope, small features of interest can be still identified. The advantage of collecting data for the full circumference using the WAMS is that it can take about 1/16 of the time needed with the LCM. Both systems offer capabilities that combined can be utilized to expedite the examination of the ICCWR. The WAMS is an efficient system for screening and identification of corrosion features while the LCM can be utilized to obtain higher resolution images areas identified by the WAMS. This report explains and justifies the data collection methods used with the WAMS. It includes a summary of the data generated by WAMS in FY21. The goals set for data collection in FY21 were met. A total of twenty-two DE’s were imaged, and analysis was carried out on eleven samples. The analyzed samples showed large numbers of potential cracks and pits distributed throughout the surfaces. Lastly, to explain the advantages of the WAMS, its capabilities were compared to those of a simpler microscope. Micrographs of the samples imaged in FY21 and those analyzed are included in the appendices.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 9H Salt Dissolution Batch 2B in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Mission Completion (SRMC) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The second batch of salt to make up processing Batch 2 (Batch 2B) has recently been dissolved in Tank 9H and transferred to Tank 10H where it was composited with the first part of the batch (Batch 2A) in preparation for processing through the TCCR 1A unit. Savannah River National Laboratory (SRNL) received samples from the recent batch (2B) of dissolved salt for characterization. Two samples from Batch 2B were received for characterization, a surface sample and a variable depth sample (VDS). Neither sample contained significant solids, although the VDS appeared slightly cloudy as compared to the surface sample. The sodium concentrations of both the surface and VDS filtrate samples were approximately 5.8 M, and the 137 Cs activity was 9.8E+07 dpm/mL in the surface sample and 9.5E+07 dpm/mL in the VDS. The total Cs concentrations were 2.5 mg/L and 2.4 mg/L in the surface sample and VDS, respectively, using the gamma activity and the Cs isotopic ratios determined by ICP-MS. The alpha activity was below the detection limit in both samples. Nitrate was the dominant anion present, and the samples were primarily concentrated sodium nitrate solutions with hydroxide, nitrite, and carbonate present at 0.1 – 0.2 M. In general, the Batch 2B samples were more dilute than the previously characterized Batch 2A samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 9h Salt Dissolution Batch 2C In Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Mission Completion (SRMC) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The third batch of salt to make up processing Batch 2 (Batch 2C) has recently been dissolved in Tank 9H and transferred to Tank 10H where it was composited with the first part of the batch (Batches 2A and 2B) in preparation for processing through the TCCR 1A unit. Savannah River National Laboratory (SRNL) received samples from the recent batch (2C) of dissolved salt for characterization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, For Calendar Year 2021 (Revision 1)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection Letter Report for Closed Non-Resource Conservation and Recovery Act (RCRA) Corrective Action Units (CAUs) On the Nevada National Security Site (NNSS), For Calendar Year 2019, With Errata Sheet

Post-Closure inspection letter report for the following CAUs for calendar year 2019 including CAUs located on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. Use restriction issues that were identified in 2018 inspections were addressed in 2019.

54 ENVIRONMENTAL SCIENCES↗

DOESC Closure Leak Test Assembly

This is the functional and operational requirements document (FOR) for the DOESC Closure Leak Test Assembly ("Bell Jar"), as required per LWP-10000.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗