Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Preliminary Public Design Report for the Texas Clean Energy Project: Topical Report - Phase 1, June 2010-July 2011

Summit Texas Clean Energy, LLC (Summit) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin sub-bituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. Front-end Engineering and Design (FEED) commenced in June 2010 and was completed in July 2011, setting the design basis for entering into the detailed engineering phase of the project. During Phase 1, TCEP conducted and completed the FEED, applied for and received its air construction permit, provided engineering and other technical information required for development of the draft Environmental Impact Statement, and completed contracts for the sale of all of the urea and most of the CO 2 . Significant progress was made on the contracts for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine and the sale of electricity to CPS Energy, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site.

Mattes, Karl↗

FY2022 Progress Report for Advanced Re-fabrication/Re-instrumentation Capability Development

In support of performing follow-on irradiation experiments with previously irradiated materials, the Halden Reactor Project developed unique and state of the art capabilities to refabricate and re-instrument previously irradiated materials. Such materials were used in in-pile tests at the Halden reactor, and out-of-pile tests for example using furnaces as a heat source. The decision to close the Halden Reactor Project results in the loss of this refabrication and re-instrumentation capability. As a result, the United States (U.S.) Department of Energy (DOE) has determined to develop refabrication and re-instrumentation capability at the unique shielded facilities at Idaho National Laboratory (INL). The development of refabrication capability has been completed and demonstrated. This report focuses on the complementary aspects of reinstrumentation and the progress to-date. Halden spent nearly 30 years developing both refabrication and re-instrumentation. Collaboration with Halden is allowing Idaho National Laboratory (INL) to develop this capability much more rapidly. In FY-21 the results include development of the capability to drill annular center holes in ceramic UO2 fuel pellets, development of fuel rod end caps with feedthroughs for centerline instrumentation inside the rodlet, The procurement of both fuel drilling and welding demonstration equipment from Halden, evaluation of surface thermocouple attachments to support better understanding of temperature measurement uncertainties, and finally, the conceptual design of a new shielded enclosure where advanced refabrication and re-instrumentation equipment can be housed. In FY-22, the results include; Completing set up of the drilling and welding modules procured from Halden, and early experimental trials using that equipment.; Completing set up of an out-of-cell circumferential weld system to allow for further weld development to take place and support fabrication of fuel for fresh fuel experiments.; Evaluation of the Hot Fuel Examination Facility (HFEF) infrastructure to support future installation of advanced re-fabrication/re-instrumentation equipment, specifically related to necessary infrastructure for cryo-drilling.; Developments in dry-drilling alternative. Including experimental studies showing cordierite is the most suitable surrogate for UO 2 for performing drilling studies. That drilling performance is enhanced when a fuel-clad bonding condition is simulated.; Conceptual design completed for attaching surface thermocouples to irradiated fuel in support of TWIST capsule experiments. The authors would like to thank the numerous colleagues at INL and Halden who provided support in accomplishing this work. Their support both material and intellectual is invaluable in advancing the state of the art and establishing the capabilities for refabrication and re-instrumentation at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Updated NGNP Fuel Acquisition Strategy

A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type. • Additional funding will be made available beginning in fiscal year (FY) 2012 to support pebble bed fuel fabrication process development and fuel testing while maintaining the prismatic fuel schedule. Options for fuel fabrication for prismatic and pebble bed were evaluated based on the credibility of each option, along with a cost and schedule to implement each strategy. The sole prismatic option is Babcock and Wilcox (B&W) producing uranium oxycarbide (UCO) tristructural-isotropic (TRISO) fuel particles in compacts. This option finishes in the middle of 2022 . Options for the pebble bed are Nuclear Fuel Industries (NFI) in Japan producing uranium dioxide (UO2) TRISO fuel particles, and/or B&W producing UCO or UO2 TRISO fuel particles. All pebble options finish in mid to late 2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Engineering and Design for CO 2 Capture from Ethanol Facilities

The Energy & Environmental Research Center, in partnership with the U.S. Department of Energy (DOE) and North Dakota ethanol producer Red Trail Energy, LLC (RTE) and with technical support from Trimeric Corporation and the KLJ engineering firm, completed an initial engineering design (IED) for a hybrid capture system to estimate associated costs for retrofitting the operational RTE ethanol plant. The project goal supports the DOE objective to achieve negative emissions using commercially available technologies to attain Technology Readiness Level 6+ from a facility emitting >100,000 tonnes of carbon dioxide (CO 2 ) annually. The RTE CCS (carbon capture and storage) Project is currently operating a CO 2 capture facility, adjacent to the RTE ethanol facility in western North Dakota, and injecting the CO 2 more than a mile below RTE property for permanent storage. This novel hybrid capture system would process about 310,000 tonnes of CO 2 annually for the RTE host site and includes CO 2 capture and compression from bioprocessing as well as capturing CO 2 produced from natural gas boilers. The bioprocessing capture process, based on past RTE studies investigating ammonia liquefaction technology with CO 2 produced from natural gas boilers captured utilizing chemical absorption with amine, was shown to be technically feasible for the RTE site. Activities conducted to support the project goal included 1) designing a hybrid capture system using CO 2 emissions from both bioprocessing and heat production at the host site facility; 2) conducting a pre-front-end engineering and design analysis of the hybrid capture system to include environmental health and safety, a constructability report, identification of permits, and corporate approvals; and 3) performing a techno-economic assessment in accordance with DOE’s methodology, as demonstrated by the bituminous baseline study. In addition, a life cycle assessment (LCA) was completed for the RTE site to estimate the carbon life cycle for ethanol-CCS implementation using the designed hybrid capture system to determine potential for net-negative carbon emissions. Results of the IED showed the hybrid system to be technically viable, with a moderate estimated cost of $55/tonne CO 2 captured for the hybrid system. The cradle-to-gate LCA showed preliminary net-negative carbon emissions potential anticipated from implementing a hybrid CCS system at a commercial scale. Recommended next steps toward potential implementation include hybrid capture system demonstration testing for detailed engineering and LCA model comparisons with low-carbon fuel incentive programs for financial support.

01 COAL, LIGNITE, AND PEAT↗

Engineering Design of a Polaris Membrane CO 2 Capture System at a Cement Plant

Sargent & Lundy (S&L) and Membrane Technology and Research, Inc. (MTR) in cooperation with CEMEX, completed an initial engineering design study to evaluate the retrofit of MTR’s membrane-based post-combustion carbon dioxide (CO 2 ) capture technology to the CEMEX Balcones cement plant (Balcones) Kiln 2. The CO 2 capture plant is designed to treat the entire flue gas flow from Kiln 2; it is estimated that this system will capture 2,039 tonnes/day per day (TPD) of CO 2 , approximately 75% of current CO 2 emissions from the kiln. The captured CO 2 is compressed to 2,213 psia (152.58 bara) before flowing to the capture plant boundary tie-point. It was assumed for this study that the CO 2 would be pumped off-site and transferred by pipeline to either a CO 2 storage complex for geological sequestration or elsewhere for Enhanced Oil Recovery (EOR).

42 ENGINEERING↗

LCLS-II helium cryoplant and cryo distribution system installation

The helium cryoplant and cryo distribution system (CDS) are key elements of the new superconducting Linac Coherent Light Source (LCLS-II) and will provide superfluid helium to the accelerator. The cryoplant consists of two helium refrigerators with an equivalent 4.5 K refrigeration capacity of 18 kW each. The 37 cryomodules of the LINAC will be operated at a temperature of 2.0 K to accelerate a 4 GeV electron beam that will generate extremely bright X-ray laser light. Two five-stage cold compressor cold boxes will be utilized to provide superfluid helium II for the superconducting cavity structures with a total cooling capacity of 8 kW at 2.0 K. This paper describes the installation of the LCLS-II cryoplant and CDS. The LCLS-II cryoplant was designed and contributed by Jefferson Lab. To expedite the project completion the reuse of proven design and technology from the Jefferson Lab CHL-2 cryoplant was the preferred strategy. The CDS consists of ~260 m thermally shielded and vacuum super insulated transfer lines, two distribution boxes and eight feed and end caps, and was designed and contributed by Fermilab. SLAC installed the cryoplant components into a newly erected building and the CDS components into the existing accelerator tunnel and klystron gallery with strong engineering support from both partner labs.

43 PARTICLE ACCELERATORS↗

Final Assembly and Factory Testing of the Jefferson Lab SHMS Spectrometer Quadrupole and Dipole Superconducting Magnets

Jefferson Lab is constructing an 11 Gev/c electron spectrometer called the Super High Momentum Spectrometer (SHMS) as part of the 12 GeV JLAB upgrade for experimental Hall C. Three of the five superconducting(SC) SHMS magnets are under construction at SigmaPhi in Vannes France as a result of an international competition for design and fabrication. The three magnets Q2 and Q3 60 cm bore quadrupoles and the 60 cm warm bore dipole are complete or near complete and have many design features in common. All three magnets share a common superconductor, collaring system, cryostat design, cold to warm support, cryogenic interface, burnout resistant current leads, DC power supply, quench protection, instrumentation and controls. The three magnets are collared, installed in cryostats and welded up and in various stages of final testing. The Q2 quadrupole is due to ship from France to America in August arriving during this ASC conference and has passed all final hipot, leak and pressure tests. The dipole is in leak and pressure testing as of July 2016 while the Q3 quadrupole requires some outer vacuum vessel assembly. Delivery of the Q3 and Dipole magnets will follow the Q2 at about 1 month intervals. Lastly, factory testing have included hipot and electrical tests, magnetic tests at low field, mechanical alignments to center the coils, leak tests and ASME Code required pressure tests. Upon installation in Hall C at JLAB cold testing will commence.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

The ARGUS Solution Reactor and Molybdenum Production: A Summary Report Based on Open Literature

The (Aqueous Homogeneous Reactor) AHR was conceptualized at Los Alamos for work in advancing weapon design with initial experiments completed at Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) in the early 1940s and 1950s. The reactor design was discovered to be an efficient mean of production for medical radio isotopes (e.g. molybdenum-99 and other fission products) due to its streamlined process of extracting target radioactive sources from the fissile solution via a separation system. As the demand for medical radioisotopes has increased so has the need for a safe and low cost isotope source, the most commonly used of which is technetium-99m (99m Tc), daughter product from molybdenum decay. Studies indicate solution reactors pose a significantly lower hazard to the workers, public and environment, compared to other modern reactors (International Atomic Energy Agency 2008). The inherent safety and ability to selectively extract radionuclides from its fuel solution make AHRs particularly well suited for medical isotope production. This discussion narrows its focus to one of the longest running aqueous homogeneous reactor systems, ARGUS. A study of the conversion of ARGUS to a low-enriched uranyl (LEU) sulfate fuel solution was part of the Global Threat Reduction Initiative (GTRI) program. The goal of this paper is to provide a summary of the ARGUS reactor system based on open literature available.

07 ISOTOPE AND RADIATION SOURCES↗

Lattice design of the integrable optics test accelerator and optical stochastic cooling experiment at Fermilab

The Integrable Optics Test Accelerator (IOTA) storage ring at Fermilab will serve as the backbone for a broad spectrum of Advanced Accelerator R&D (AARD) experiments, and as such, must be designed with signi cant exibility in mind, but without compromising cost e ciency. The nonlinear experiments at IOTA will include: achievement of a large nonlinear tune shift/spread without degradation of dynamic aperture; suppression of strong lattice resonances; study of stability of nonlinear systems to perturbations; and studies of di erent variants of nonlinear magnet design. The ring optics control has challenging requirements that reach or exceed the present state of the art. The development of a complete self-consistent design of the IOTA ring optics, meeting the demands of all planned AARD experiments, is presented. Of particular interest are the precise control for nonlinear integrable optics experiments and the transverse-to-longitudinal coupling and phase stability for the Optical Stochastic Cooling Experiment (OSC). Since the beam time-of- ight must be tightly controlled in the OSC section, studies of second order corrections in this section are presented.

43 PARTICLE ACCELERATORS↗

Influence of the air-cooled supercritical carbon dioxide recompression cycle design-point on molten salt power tower techno-economic performance

Here, this paper investigates the techno-economic performance of a molten salt power tower integrated with an air-cooled supercritical carbon dioxide recompression cycle. Prior research into the cycle design point showed trade-offs between efficiency, cost, and temperature difference across the heat input, resulting in trade-offs between the design-point generation of the molten salt power tower system and the cost of sensible-heat thermal energy storage. Prior research into cycle off-design showed that colder ambient temperature designs have higher efficiencies on cold days but lower efficiency and capacity degradation on hot days. We present a framework to evaluate how cycle design, cost, and corresponding off-design performance affect the techno-economic performance of the molten salt power tower system. We use a steady-state off-design cycle model assuming fixed shaft speeds, inventory control, and air-cooler fan power control and integrate the cycle model with the molten salt power tower model from the National Renewable Energy Laboratory's System Advisor Model. First, we present a surrogate model that uses a heuristic approach to correct the interpolation when the cycle reaches capacity limitations at ambient temperatures hotter than design. Next, we evaluate how the recompression cycle design-point ambient temperature, air-cooler approach temperature, air-cooler fan power, and recuperator conductance influence cycle and system design metrics. Finally, we complete annual simulations using an hourly "duck curve" pricing schedule and present annual performance metrics to evaluate the cumulative effects of the cycle design parameters and corresponding off-design performance on molten salt power tower techno-economics.

14 SOLAR ENERGY↗

Embedded Active Fiber Optic Sensing Network for Structural Health Monitoring in Harsh Environments

This report summarizes technical progress on the program “Embedded Active Fiber Optic Sensing Network for Structural Health Monitoring in Harsh Environments” funded by the National Energy Technology Laboratory of the U.S. Department of Energy, and performed by the Center for Photonics Technology at Virginia Tech. The objective of this project is to develop a first-of-a-kind technology for remote fiber optic generation and detection of acoustic waves for structural health monitoring in harsh environments. During the project period, which is from April 1, 2013 to Septemeber 30, 2016, three different acoustic generation mechanisms were studied in detail for their applications in building a fiber optic acoustic generation unit (AGU), including laser induced plasma breakdown (LIP), Erbium-doped fiber laser absorption, and metal laser absorption. By comparing the performance of the AGUs designed based on these three mechanisms and analyzing the experimental results with simulations, the metal laser absorption method was selected to build a complete fiber optic structure health monitoring (FO-SHM) system for the proposed high temperature multi-parameter structure health monitoring application. Based on the simulation of elastic wave propagation and fiber Bragg grating acoustic pulse detection, an FO-SHM element together with a completed interrogation system were designed and built. This system was first tested on an aluminum piece in the low-temperature range and successfully demonstrated its capability of multi-parameter monitoring and multi-point sensing. In the later stages of the project, the research was focused on improving the surface attachment design and preparing the FO-SHM element for high temperature environment tests. After several upgrades to the surface attachment methods, the FO-SHM element was able to work reliably up to 600oC when attached to P91 pipes, which are the target material of this project. In the final stage of this project, this FO-SHM sensing system was tested in the simulated harsh environment for its multi-parameter monitoring performance and high-temperature survivability.

20 FOSSIL-FUELED POWER PLANTS↗

Interwell Communication Study of UWC and MWC Wells in the HFTS

The focus of this paper is to examine the water, oil and proppant communication between wells at the Hydraulic Fracturing Test Site (HFTS) in the Permian Basin. Unique tracers were employed during the stimulation of the HFTS pad in conjunction with many additional diagnostic technologies to evaluate interwell communication, fracture behavior, proppant transport and reservoir drainage. Water and oil chemical tracers were utilized on four Upper Wolfcamp (UWC) and four Middle Wolfcamp (MWC) horizontal wells on the HFTS pad. Each traced well was divided into three or four uniquely traced segments. The segments consisted of consecutive stage groupings that were stimulated with the same water and oil tracers. During the production phase of the project, oil and water samples from a combined total of 33 horizontal and vertical wells were analyzed for the presence of the tracers from the eight wells. Additionally, proppant tracers were employed in the stimulation of two UWC and one MWC horizontal well. After all the wells were completed, a spectral gamma ray log was run on each well to identify the proppant coverage, cluster efficiency, near-wellbore (NWB) fracture behavior and/or any proppant communication that occurred. The results of this project provide a better understanding of the fluid and hydrocarbon communication that is taking place between and within the UWC and MWC wells over an initial short-term period as well as the long term. Additionally, the target zone, stimulation design, production methodology and stimulation sequencing are discussed so that comparisons could be made with other diagnostic data from this project. The insights from this two-year study highlight the continued need to optimize completion designs, even while targeting different benches of the same formation. Additionally, future fracture modeling and design criteria can be enhanced with the hydraulic fracture and propped

Wood, Tanner↗

Advanced Envelope Research for Factory Built Housing, Phase 3 - Whole-House Prototyping

The Advanced Envelope Research effort will provide factory homebuilders with high performance, cost-effective envelope designs that can be effectively integrated into the plant production process while meeting the thermal requirements of the 2012 IECC standards. Given the affordable nature of manufactured homes, impact on first cost is a major consideration in developing new envelope technologies. This work is part of a multi-phase effort. Phase 1 identified seven envelope technologies and provided a preliminary assessment of three methods for building high performance walls. Phase 2 focused on developing viable product designs, manufacturing strategies, addressing code and structural issues, and cost analysis of the three selected options. An industry advisory committee helped narrow the research focus to perfecting a stud wall design with exterior continuous insulation (CI). Phase 3, completed in two stages, continued the design development effort, exploring and evaluating a range or methods for applying CI to factory built homes. The scope also included material selection, manufacturing and cost analysis, and prototyping and testing. During this phase, a home was built with CI, evaluated, and placed in service. The experience of building a mock up wall section with CI and then constructing on line a prototype home resolved important concerns about how to integrate the material into the production process. First steps were taken toward finding least expensive approaches for incorporating CI in standard factory building practices and a preliminary assessment suggested that even at this early stage the technology is attractive when viewed from a life cycle cost perspective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operator Evaluation of Mobile Robotic Systems for Inventory, Inspection, and Contamination Survey Tasks in D and D Environments - 17314

The Nuclear and Applied Robotics Group (NRG) has developed two mobile systems with simple, intuitive Human-Machine Interfaces (HMIs). Thus, the systems can be operated by operators who are not robotics experts to perform inventory, inspection and routine contamination surveys in areas where Special Nuclear Material (SNM) is stored and handled. This effort presents feedback collected from EM operators using the two systems at the Portsmouth Gaseous Diffusion Plant in Piketon, OH who used the robotic solutions to perform tasks on site and with minimal training. This approach has the potential to address issues related to ALARA, ergonomics, and reliably completing dull, repetitive tasks while maintaining domain-specific experts in the control loop. The two systems were shipped to - and demonstrated in - a DOE designated area and demonstrated completing contamination testing using a combination of real and surrogate sensors. This paper reviews the initial hardware development, demonstration requirements, and the modifications/improvements made to deploy the systems for this effort. It then summarizes the feedback garnered from EM operators who used the systems at the DOE facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flexible Fuel Electric Hybrid Glass Furnace Demonstration

The furnace contractor completed General Arrangement (GA) layouts and Piping and Instrumentation Diagrams (P&ID) for both furnaces during this reporting period. Preliminary equipment lists accompanied this work. Control system architecture in progress. Key furnace design elements and deliverables on track to be complete by end of phase. The facilities design and integration contractor completed a 3D scan and modeling of the facility. The work during this period focused on preliminary design with a focus on overall project scope and feasibility. This key work supports the overall project deliverables for 30% preliminary engineering and Preliminary Design Report (PDR) which are on track to be complete by the end of the phase. These deliverables are approximately 50% complete through the end of this reporting period. The batch house operations design contractor continues development of site plan and General Arrangement (GA) layout to support the 30% preliminary engineering and design package. This work is 60% complete by the end of this reporting period and is on track to be complete by the end of the phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PhytoPET: Design and initial results of modular PET for plant biology

We have developed a positron emission tomography (PET) system designed specifically for plant imaging in Phytotron at Duke University. Initial evaluation of a PhytoPET system to image the biodistribution of the positron emitting tracer {sup 11}C in live plants is presented. The mechanical arrangement of the detectors is designed to accommodate the unpredictable and random distribution in space of the plant parts such as stems, leaves, and roots. Prototyping such a system requires a completely new PET system design strategy different from preclinical and clinical applications. This PhytoPET design allows flexible arrangements of PET detectors based on individual standalone detector modules built from single 5 cm × 5 cm Hamamatsu H8500 position sensitive photomultiplier tubes. Each H8500 is coupled to a L YSO:Ce scintillator array composed of 48 × 48 elements that are 10 mm thick with a 1 mm pitch. Initial results provide planar PET images from two different arrangements (1 × 4 or 2 × 2) for flexible imaging capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Irradiation of the First Advanced Gas Reactor Fuel Development and Qualification Experiment in the Advanced Test Reactor

The United States Department of Energy’s Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating eight separate tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States. The ATR has a long history of irradiation testing in support of reactor development and the INL has been designated as the United States Department of Energy’s lead laboratory for nuclear energy development. These AGR fuel experiments will be irradiated over the next ten years to demonstrate and qualify new particle fuel for use in high temperature gas reactors. The experiments, which will each consist of six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control for each capsule. The swept gas will also have on-line fission product monitoring to track performance of the fuel in each individual capsule during irradiation. The design of the first experiment (designated AGR-1) was completed in 2005, and the fabrication and assembly of the test train as well as the support systems and fission product monitoring system that monitor and control the experiment during irradiation were completed in September 2006. The experiment was inserted in the ATR in December 2006, and is serving as a shakedown test of the multi-capsule experiment design that will be used in the subsequent irradiations as well as a test of the early variants of the fuel produced under this program. The experiment test train as well as the monitoring, control, and data collection systems are discussed and the status of the experiment is provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗