Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Next generation: In-space transportation system(s)

The development of the next generation In-Space Transportation System presents a unique challenge to the design of a propulsion system for the Space Exploration Initiative (SEI). Never before have the requirements for long-life, multiple mission use, space basing, high reliability, man-rating, and minimum maintenance come together with performance in one system that must protect the lives of space travelers, support the mission logistics needs, and do so at an acceptable cost. The challenge that is presented is to quantify the bounds of these requirements. The issue is one of degree. The length of acceptable life in space, the time it takes for reuse to pay off, and the degree to which space basing is practical (full, partial, or expended) are the issues that determine the reusable bounds of a design and include dependability, contingency capabilities, resilency, and minimum dependence on a maintenance node in preparation for and during a mission. Missions to planet earth, other non-NASA missions, and planetary missions will provide important but less demanding requirements for the transportation systems of the future. The mission proposed for the SEI require a family of transportation vehicles to meet the requirements for establishing a permanent human presence on the Moon and eventually on Mars. Specialized vehicles are needed to accomplish the different phases of each mission. These large scale missions require assembly in space and will provide the greatest usage of the planned integrated transportation system. The current approach to defining the In-Space Transportation System for the SEI Moon missions with later Mars mission applications is presented. Several system development options, propulsion concepts, current/proposed activities are reviewed, and key propulsion design criteria, issues, and technology challenges for the next generation In-Space Transportation System(s) are outlined.

Huffaker, Fredrick↗

Model Checking Abstract PLEXIL Programs with SMART

We describe a method to automatically generate discrete-state models of abstract Plan Execution Interchange Language (PLEXIL) programs that can be analyzed using model checking tools. Starting from a high-level description of a PLEXIL program or a family of programs with common characteristics, the generator lays the framework that models the principles of program execution. The concrete parts of the program are not automatically generated, but require the modeler to introduce them by hand. As a case study, we generate models to verify properties of the PLEXIL macro constructs that are introduced as shorthand notation. After an exhaustive analysis, we conclude that the macro definitions obey the intended semantics and behave as expected, but contingently on a few specific requirements on the timing semantics of micro-steps in the concrete executive implementation.

Siminiceanu, Radu I.↗

Pathways towards Valid Data: Assessment of Optimized Packaging Strategies for Core Components - 18158

Every company that runs nuclear power plants needs a strategy for disposal of the radioactive waste and for decommissioning and dismantling of its nuclear reactors. The dismantling progress of several German NPPs is already in an advanced stage. Hence, particularly highly activated core components have to be disposed of as radioactive waste. Nevertheless, this is also an issue during the operating phase due to necessary replacements of highly activated core components such as PWR control elements or RPV heads. The conditioning of waste packages for final disposal in the German repository Konrad requires the core components to be dismantled, packaged and dried. Therefore, a qualified packaging strategy is needed to ensure a reliable compliance with the protection objectives of the repository and an optimized utilization of prescribed contingents. Exemplified by PWR control elements a pathway is drawn how to perform an optimized packaging strategy in compliance with the protection objectives of the repository based on only few relevant radionuclides derived from activation calculations. For these calculations, particularly the influence of trace impurities in the materials has to be considered and their amounts have to be verified or analyzed by sampling. Furthermore, low nuclide activities from contamination cannot simply be neglected because some of them are obliged to be declared or their radiological relevance has not been sufficiently determined. Due to various influence factors, qualified sampling strategies need carefully considered concepts. Therefore, detailed planning facilitates the qualification and approval process and reduces the costs for analyses and the number of containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demand Response Availability Profiles for California in the Year 2020

Demand response (DR) is being considered as a valuable resource for keeping the electrical grid stable and efficient, and deferring upgrades to generation, transmission, and distribution systems. However, simulations to determine how much infrastructure upgrades can be deferred are necessary in order to plan optimally. Production cost modeling is a technique, which simulates the dispatch of generators to meet demand and reserves in each hour of the year, at minimal cost. By integrating demand response resources into a production cost model (PCM), their value to the grid can be estimated and used to inform operations and infrastructure planning. DR availability profiles and constraints for 13 end-uses in California for the year 2020 were developed by Lawrence Berkeley National Laboratory (LBNL), and integrated into a production cost model by Lawrence Livermore National Laboratory (LLNL), for the California Energy Commission’s Value of Energy Storage and Demand Response for Renewable Integration in California Study. This report summarizes the process for developing the DR availability profiles for California, and their aggregate capabilities. While LBNL provided potential DR hourly profiles for regulation product in the ancillary services market and five-minute load following product in the energy market for LLNL’s study, additional results in contingency reserves and an assumed flexible product are also defined. These additional products are included in the analysis for managing high ramps associated with renewable generation and capacity products and they are also presented in this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The design, fabrication and delivery of a spacelab neutral buoyancy Instrument Pointing System (IPS) mockup

Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.

Vanvalkenburgh, C. N.↗

Science Training History of the Apollo Astronauts

Following President Kennedy’s initiation of Project Apollo, NASA underwent substantial changes in personnel, organization, and programs and faced a major question: what to do on the Moon after landing. Once a decision that science activities, particularly geoscience, should be pursued, considerable debate ensued over how to accomplish this. Questions arose over instruments and tools required, samples and photos to be returned, landing site selection, and crew composition. Answers to these questions required major efforts for planning traverses on the Moon and training the astronauts in the extensive procedures necessary in low gravity to use tools, set up instruments, take adequate photos, collect and document samples, and provide proper descriptions. In addition to astronauts on the surface, an astronaut in lunar orbit managed additional instruments, photography and verbal descriptions. Training for these activities averaged nearly one hundred hours per month for over a year for each crew. There were many problems as the training progressed: adjusting groups and backgrounds of the training personnel for the best combination of personalities and skills, overcoming logistical troubles, revising awkward procedures, determining optimum means of communications between all involved groups, and devising contingency procedures for real-time problems. By the last mission these problems were overcome.

Phinney, William C.↗

Pathfinding for Airspace with Autonomous Vehicles (PAAV) Overview for RTCA SC-228

The Pathfinding for Airspace with Autonomous Vehicles (PAAV) sub-project started in 2021 under NASA’s Air Traffic Management – eXploration (ATM-X) project. ATM-X as a project is conducting research to support the growth of traditional aviation and new entrants. This presentation discusses the background of the PAAV project as well as it’s current areas of focus around uncrewed aircraft system (UAS) operations. The areas include the development of a flight test ecosystem, detect and avoid, traffic pattern integration, aircraft-to-aircraft communications, and contingency management. The aim of these research areas is to help inform the development of performance standards and FAA-approved procedures for integrating UAS into the national airspace system (NAS). The presentation seeks to describe the PAAV research objectives in sufficient detail to allow the committee to provide feedback on the sub-project's approach and main areas of interest.

uncrewed aircraft systems↗

Stochastic correlation analysis to rank the impact of intermittent wind generation on unreliability margins of power systems

Power systems are vulnerable to extreme contingencies (like an outage of a major generating substation or transmission line) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Power systems operators take time-ahead actions (real time to day ahead) actions based on forecasted data as well as telemetry. However, there is a probability of extreme swings in wind generation that can push the power system that is already close to system boundaries into unreliable states. Increasing penetration on wind generation and uncertainties in short term forecast can move the system into operational states that can violate N-1 reliability criteria. While the power system planning accounts for worst case analyses to mitigate such emergencies, it is necessary to understand the spatial and temporal correlation of load buses with intermittent wind generation. The ranking of wind generators based on stochastic correlation to unreliability margins of load buses provides an insight of system vulnerabilities that can be corrected by appropriate emergency controls. A Monte-Carlo simulation of wind uncertainty forecast is performed to identify the probability distributions of unreliability margins. Ranking of wind generators is performed based on stochastic correlation analysis of the wind power generated and the load losses at the buses. This helps in not only identifying weak buses in the power system but also in identifying the vulnerable wind locations to plan for system reinforcements. Power system modeling and hybrid simulation to calculate unreliability margins are performed using DCAT and demonstrated on the 32-bus Nordic test system.

generators, wind forecasting, wind power generatio↗

Alternating Direction Decomposition with Strong Bounding and Convexification (ADDSBC) for Solving Security Constrained AC Unit Commitment Problems

This project aims to develop efficient and robust computational methods for solving the security-constrained unit commitment and alternating current optimal power flow problem (SC-UC-ACOPF). The SC-UC-ACOPF problem is at the center of the short-term operation of the U.S. Power Grid. It is solved every week, every day, and every 10 minutes to plan for the optimal action of electricity generation and consumption by minimizing the generation cost and maintaining power system reliability against potential disruptions of equipment failures. In mathematical terms, SC-UC-ACOPF is a challenging large-scale mixed-integer nonlinear optimization model. This means that the decisions involve both discrete variables, e.g. the turning on and off of generators and switching of transmission lines and transformers, and continuous decisions, e.g. the amount of energy generated by each generator and the power flows in the power grid. The physics of the power flow is described by nonlinear equations involving real and reactive power and bus voltages. Another key feature is the large number of contingencies, i.e. the system needs to stay reliable in face of failure of any one equipment, such as transmission lines and generators. The U.S. power grids are extremely complicated and large scale with more than 5,000 generators, 50,000 buses, and 100,000 high-voltage transmission lines, making the SC-UC-ACOPF a very large-scale computation challenge. The research developed in this project aims to solve the SC-UC-ACOPF problems in the three timescales, i.e. weekly, daily, and every 10-min. The proposed computational methods are built on a principled algorithmic approach of decomposition and penalization. More specifically, the algorithm develops spatial and temporal decomposition by exploiting the strong temporal coupling and weak spatial coupling of the UC problem and the complementary feature, i.e. weak temporal coupling and strong spatial coupling of the ACOPF problem. The algorithm also leverages recent progresses in strong convex relaxation of ACOPF. A unique feature of the proposed approach is that it generates a valid, global upper bound on the optimal maximum profit. In this way, a global optimality gap is available to measure the quality of the solution. To further speed up computation, the research team has developed a plethora of effective heuristics to strengthen the iterative penalty-based decomposition framework. For instance, a heuristic is developed to construct inner approximations of the time coupling constraints within the time decoupled problems. Contingencies are pre-screened and low-rank matrix computation is exploited to find the almost unique solution to each contingency. A novel heuristic for line switching is proposed and tested with positive impacts on instances where line switching is beneficial. Taking a systematic approach and carefully handling every detail of the problem pays off. The TIM-GO’s performance throughout the trials and the final event was stellar. TIM-GO garnered the second highest total prize money and is ranked in the top three positions across all categories of comparison.

97 MATHEMATICS AND COMPUTING↗

The SAX Italian scientific satellite. The on-board implemented automation as a support to the ground control capability

This paper presents the capabilities implemented in the SAX system for an efficient operations management during its in-flight mission. SAX is an Italian scientific satellite for x-ray astronomy whose major mission objectives impose quite tight constraints on the implementation of both the space and ground segment. The most relevant mission characteristics require an operative lifetime of two years, performing scientific observations both in contact and in noncontact periods, with a low equatorial orbit supported by one ground station, so that only a few minutes of communications are available each orbit. This operational scenario determines the need to have a satellite capable of performing the scheduled mission automatically and reacting autonomously to contingency situations. The implementation approach of the on-board operations management, through which the necessary automation and autonomy are achieved, follows a hierarchical structure. This has been achieved adopting a distributed avionic architecture. Nine different on-board computers, in fact, constitute the on-board data management system. Each of them performs the local control and monitors its own functions while the system level control is performed at a higher level by the data handling applications software. The SAX on-board architecture provides the ground operators with different options of intervention by three classes of telecommands. The management of the scientific operations will be scheduled by the operation control center via dedicated operating plans. The SAX satellite flight mode is presently being integrated at Alenia Spazio premises in Turin for a launch scheduled for the end of 1995. Once in orbit, the SAX satellite will be subject to intensive check-out activities in order to verify the required mission performances. An overview of the envisaged procedure and of the necessary on-ground activities is therefore depicted as well.

Martelli, Andrea↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Integration of Automated Systems Test Campaign NC-IAS

NASA’s 2022 strategic plan included the goal to catalyze economic growth and drive innovation in the aviation industry, and to address challenges in air transportation and airspace management within the National Airspace System (NAS). The Aeronautics Research Mission Directorate (ARMD) specifically was tasked with leading aviation innovation to enable safe and sustainable air transportation through revolutionary vehicle advances and efficient flight operations. As a part of meeting these objectives and advancing air mobility concepts, NASA initiated the National Campaign (NC) in the Advanced Air Mobility (AAM) Project within the Airspace Operations and Safety Program (AOSP). The NC was designed to support operational demonstrations with industry as well as the research and development needed to support NASA-led research flight demonstrations. Within NC, the Integration of Automated Systems (IAS), an NC activity, tested and evaluated flight deck automation and airspace operations management functions needed to enable Urban Air Mobility (UAM) operations. This was accomplished through a partnership with Sikorsky Aircraft (specifically Sikorsky Innovations), a Lockheed Martin company, and DARPA (Defense Advanced Research Projects Agency), by leveraging two automation-enabled helicopters equipped with unique capabilities that enabled NASA to develop and test two-ship conflict encounters to demonstrate flight path management and hazard avoidance technologies. The enabler in this testing was NASA-developed “Middleware” (MW) software (also known as Expandable Variable Autonomy Architecture, or EVAA), which among other things allowed multiple algorithms to be incorporated into one software build that was hosted on the dissimilar-type Sikorsky helicopters. The IAS test campaign period of performance was from March 2022 through October 2023 and was structured as a phased, or spiral, approach that ultimately led to the first-ever demonstration of two-ship UAM/AAM operations designed to safely choreograph specific conflict encounters and mission scenarios to test the research algorithms for strategic and tactical aircraft deconfliction. Lessons learned are included in the body of the report. Data collected will be used to inform FAA and industry standards groups on the increasingly automated systems needed for future AAM operations. The test encounters developed for these flight tests were proven to be highly predictable, repeatable, and safely exercised flight path planning and Detect and Avoid (DAA) algorithms. These same test encounters should be leveraged by future flight test campaigns to verify that operational safety is not compromised as the AAM architecture matures. Next steps include repeating similar encounters using unmanned aircraft carrying DAA sensors in the National Airspace.

AAM↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

Increasing the Reach of Low-Income Energy Programmes through Behaviourally Informed Peer Referral

Subsidized energy assistance programmes are a popular policy tool for promoting energy justice, but, like other social benefits programmes, are often undersubscribed. To improve uptake, some programmes have turned to social influence strategies, such as asking programme participants to refer their peers. Here, through a field experiment with California's low-income solar programme (N = 7,676), we show that referral behaviour depends on how existing participants are approached. Adding behavioural science strategies to a referral reward increases peer referral rates, referral quality and ultimately solar adoption. Compared with only reminding existing adopters of a potential US$200 reward for referrals that result in adoption, adding an appeal to reciprocity through a non-contingent US$1 gift - and further combining this gift with a simplified referral process - leads to 2.6-5.2 times as many solar contracts. These results highlight the potential of behaviourally informed peer referral programmes to accelerate equitable access to clean energy.

California↗

On the Adaptive Protection of Microgrids: A Review on How to Mitigate Cyber Attacks and Communication Failures

One main challenge in the practical implementation of a microgrid is the design of an adequate protection scheme in both grid connected and islanded modes. Conventional overcurrent protection schemes face selectivity and sensitivity issues during grid and microgrid faults since the fault current level is different in both cases for the same relay. Various approaches have been implemented in the past to deal with this problem, yet the most promising ones are the implementation of adaptive protection techniques abiding by the IEC 61850 communication standard. This paper presents a critical review of existing adaptive protection schemes, the technical challenges for the use of classical protection techniques and the need for an adaptive, smart protection system. However, the risk of communication link failures and cyber security threats still remain a challenge in implementing a reliable adaptive protection scheme. A contingency is needed where a communication issue prevents the relay from adjusting to a lower current level during islanded mode. An adaptive protection scheme is proposed that utilizes energy storage (ES) and hybrid ES (HESS) already available in the network as a mechanism to source the higher fault current. Four common grid ES and HESS are reviewed for their suitability in feeding the fault while some solutions are proposed.

25 ENERGY STORAGE↗

Assessing the Technical Potential of Fast Frequency Response in Grid-Supportive Loads

Fast frequency response (FFR) is a critical tool for grid operators to manage contingency events in low-inertia systems. While large generators and loads are more commonly used, many smaller end use loads, in aggregate, can provide FFR across a large system. This work considers the technical potential of power electronics-based loads for autonomous FFR in low-inertia grids. We consider multiple factors that might influence the impact of FFR for various end use loads, with a focus on residential loads.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗